Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPowerhouse Ener Regulatory News (PHE)

Share Price Information for Powerhouse Ener (PHE)

Share Price is delayed by 15 minutes
Get Live Data
0.21    0.00 (0.00%)
Bid:
0.20
Ask:
0.22
Spread: 0.02 (10.00%)
Market Cap: £10.76m
PHE Live PriceLast checked at - London Stock Exchange

Intraday Powerhouse Ener Share Chart

Completion of G3-UHt Testing Program

6 Sep 2016 07:00

POWERHOUSE ENERGY GROUP PLC - Completion of G3-UHt Testing Program

POWERHOUSE ENERGY GROUP PLC - Completion of G3-UHt Testing Program

PR Newswire

London, September 5

PowerHouse Energy Group plc

(β€œPowerHouse” or the β€œCompany”)

Completion of G3-UHt Testing Program

PowerHouse Energy Group, plc is pleased to announce the completion of its system-wide testing program for the G3-UHt Unit in Brisbane, Australia.

β€œThis is a significant milestone for the Company, β€œ said Keith Allaun, Executive Chairman of PowerHouse. β€œWe’ve been stress-testing all components of the G3, in a discrete and focused manner, over the past several months. Based upon our most recent operation of the complete system, we’ve reached the point that we can declare the successful conclusion of our formal testing program.”

The PowerHouse Energy Group ultra-high temperature gasification reactor testing program has utilized feedstock which has included both shredded plastic and tyre crumble, and has successfully cycled the system repeatedly. The nominal 1-3 tonne per day (TPD) G3 unit has continued to operate as designed; gasifying the feedstock at temperatures above 1100 degrees Centigrade, generating synthesis gas (syngas), and cleaning and cooling the syngas, which can then be used for electrical generation or other fuel creation.

Concurrent with the testing of the G3, the company has completed the initial design and engineering plans of 100 TPD gasification modules, allowing for the easy bundling of the modules into 400 TPD systems. Designed to operate in-line with each other, expansion of the systems is a linear step-function that enables the PowerHouse technology to be rolled-out into existing commercial Transfer Station and Land-Fill operations. This modular design can substantially expand the commercial opportunities for PowerHouse.

β€œThe rigorous process that the team has just completed, coupled with the engineering data that has been captured, has put us in a position to begin progressing commercial discussions with a number of parties over the next several months,” stated Allaun.

The new G3 system will be permanently housed in a transportable container for shipment to sites throughout the world for on-site operation, demonstration, and data collection purposes. Once installed into its in-situ operational container, and prior to shipment to prospective sites, additional third-party engineering validation will occur, and other feedstocks will be tested.

As earlier announced, the Company is beginning recruitment efforts to expand its commercial team in both the UK and in Australia.

Contacts:

PowerHouse Energy Group plc+1 352 359 0911
Keith Allaun, Executive Chairman
WH Ireland Limited (Nominated Adviser)+44 (0) 207 220 1666
James Joyce / James Bavister
Vicarage Capital Limited (Joint Broker)+44 (0) 203 651 2910
Jeremy Woodgate
Date   Source Headline
10th Nov 202010:03 amRNSImage of Facility to Commercialise DMG Technology
28th Oct 20204:40 pmRNSSecond Price Monitoring Extn
28th Oct 20204:35 pmRNSPrice Monitoring Extension
23rd Oct 20207:00 amPRNDirectorate Change
30th Sep 202011:57 amPRNResult of AGM
30th Sep 202011:00 amPRNAGM Statement
30th Sep 20209:00 amPRNDirectorate Change
29th Sep 20207:00 amRNSInterim Results for period to 30 June 2020
25th Sep 20207:00 amPRNDirectorate Change
9th Sep 20202:06 pmRNSSecond Price Monitoring Extn
9th Sep 20202:00 pmRNSPrice Monitoring Extension
9th Sep 202011:05 amRNSSecond Price Monitoring Extn
9th Sep 202011:00 amRNSPrice Monitoring Extension
9th Sep 20207:16 amPRN£5m fund raise and grant of Peel warrant
7th Sep 20205:00 pmPRNNotice of AGM
28th Aug 20203:16 pmRNSAppointment of Deputy Chairman
24th Aug 20209:05 amRNSSecond Price Monitoring Extn
24th Aug 20209:00 amRNSPrice Monitoring Extension
24th Aug 20207:00 amPRNCompletion of Peel Engineering Definition phase
10th Aug 20207:00 amPRNDirectorate Change
27th Jul 20207:00 amPRNDirectorate Change
16th Jul 20202:31 pmPRNDirectorate Change
14th Jul 20203:52 pmPRNResult of General Meeting and Issue of Equity
7th Jul 20202:05 pmPRNIssue of Equity
30th Jun 20207:00 amRNSFinal Results for the year ended 31 December 2019
26th Jun 20207:00 amRNSProposed waiver of Rule 9 and Notice of GM
25th Jun 20209:00 amRNSPrice Monitoring Extension
24th Jun 20204:41 pmRNSSecond Price Monitoring Extn
24th Jun 20204:36 pmRNSPrice Monitoring Extension
17th Jun 20201:45 pmPRNIssue of Equity
12th Jun 202012:34 pmPRNHolding(s) in Company
5th Jun 20209:05 amRNSSecond Price Monitoring Extn
5th Jun 20209:00 amRNSPrice Monitoring Extension
3rd Jun 20207:00 amPRNIssue of Equity
2nd Jun 20209:05 amRNSSecond Price Monitoring Extn
2nd Jun 20209:00 amRNSPrice Monitoring Extension
1st Jun 20202:05 pmRNSSecond Price Monitoring Extn
1st Jun 20202:00 pmRNSPrice Monitoring Extension
1st Jun 20207:00 amPRNOperational update re share price movement
29th May 20209:05 amRNSSecond Price Monitoring Extn
29th May 20209:00 amRNSPrice Monitoring Extension
28th May 20204:41 pmRNSSecond Price Monitoring Extn
28th May 20204:36 pmRNSPrice Monitoring Extension
28th May 20202:06 pmRNSSecond Price Monitoring Extn
28th May 20202:00 pmRNSPrice Monitoring Extension
28th May 202011:05 amRNSSecond Price Monitoring Extn
28th May 202011:00 amRNSPrice Monitoring Extension
20th May 20201:04 pmPRNIssue of Equity
13th May 20209:05 amRNSSecond Price Monitoring Extn
13th May 20209:00 amRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.