Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPatagonia Gold Regulatory News (PGD)

  • There is currently no data for PGD

Drilling Update

30 Apr 2007 07:01

Patagonia Gold PLC30 April 2007 PATAGONIA GOLD PLC Trading Symbol PGD.L 30th April 2007 DRILLING UPDATE LA PALOMA PROPERTY. SANTA CRUZ, ARGENTINA. • Resource infill drilling on the Lomada de Leiva Project located on the La Paloma property, has reported very encouraging results in the first drill holes including 18 metres at 6.87g/t gold. • Exploration drilling on the adjacent Breccia Sofia Prospect has revealed promising mineralized structures. • Chlumsky, Armbrust and Meyer (CAM), consulting and engineering group from Lakewood, Colorado, U.S.A., have undertaken a site visit and commenced work on a NI43-101 compliant Resource estimate on Lomada de Leiva. The La Paloma property block covering over 44 square kilometres is locatedapproximately 40km to the south of the town of Perito Moreno in the Santa Cruzprovince of Argentina. An infill drilling campaign commenced in February of this year on the 100% ownedLomada de Leiva Project. To date 3,024 metres in 21 HQ diamond drill holes and945 metres in 8 Reverse Circulation (RC) holes have been completed. Results from the first 9 holes are now available and significant intersectionsare listed in the table below. Drill Hole No. From Metres Interval metres Gold g/t LPD-01 9.0 18.0 6.87 including 10.0 10.0 10.86 LPD-02 35.0 21.0 4.12 including 46.0 7.0 5.17 LPD-03 90.0 13.0 7.26 including 94.0 6.0 13.45 LPD-04 63.0 8.0 1.19 and 97.0 12.0 1.32 LPD-06 64.0 24.0 3.05 including 82.0 5.0 7.16 LPD-07 38.0 20.0 2.66 including 48.0 4.0 5.89 LPD-09 73.0 12.0 2.01 and 88.0 10.0 2.07 Exploration drilling on the adjacent Breccia Sofia prospect is also ongoing. Todate 1,816 metres in 12 RC holes have been completed. Results are pending. Geology and Mineralisation Mineralisation at the Lomada de Leiva Project is hosted in Jurassic volcanicsand volcanoclastic sediments. A north north-east structural corridor dippingsteeply to the east contains brecciated and variably silicified volcanic andtuffaceous rocks which have been cut by a network of fine anastomosing quartzveins and veinlets. The breccia also contains clasts of chalcedonic quartz veinmaterial. Gold is likely to be hosted in the breccia matrix as well as the veinquartz and earlier chalcedonic veins. Petrological work is being conducted on anumber of core samples to determine the gold paragenesis in the reporting zones. The main zone of interest at Lomada de Leiva is mapped over 600 metres on strikeand greater than 20 metres in width with significant potential extending towardsBreccia Sofia, some 500 metres to the north east. PG's drill hole LLD-06containing 24m @ 3.1g/t Au is approximately 300m to the north of the previouslydrilled hole DDHLP-36 which contained 15.5m @ 2.28 g/t Au The Company's initial interrogation of the previous drilling by Barrick and thecurrent exploration drilling being conducted by the Company indicatesprospectivity to the east under gravel cover as well as potential forrepetitions or sub parallel structures to the south east. Drill programme The current drilling programme at Lomada de Leiva has been designed to validate,infill and extend the previous drilling by Barrick. The total Resource baseddrill programme contains 40 holes for an estimated 5,800 metres of both diamonddrilling and RC drilling. The programme includes a number of 'scissors' and'twins' of both the Barrick drilling and diamond to RC hole comparison forquality control purposes. A programme of exploration drilling on the peripheryof the resource area contains a planned 25 holes for a further 3,500m of bothdiamond and RC drilling. This programme will be started before the winter. At Breccia Sofia the exploration programme currently underway contains a plannedtotal of 25 holes for 2,500m of RC drilling. Resource-NI43-101 Chlumsky, Armbrust and Meyer L.L.C. (CAM), an international mineral resources,consulting and engineering group from Lakewood, Colorado, U.S.A. have beenengaged by Patagonia Gold to complete a resource estimate, to Canadian NationalInstrument 43-101, on the Lomada de Leiva Project area. CAM will also give recommendations for infill, down-dip and metallurgicaldrilling at Lomada de Leiva in preparation for environmental and scopingstudies. Sample pulps and coarse residues from the current drill programme have beenselected for initial metallurgical test work in order to quantify the recoveryfrom the ore material. Gravity extraction test work is also being undertaken. Marc Sale, (BSC. Geology, member AusIMM, member AIG) a Director and consultantto Patagonia Gold Plc and a qualified person as defined in National Instrument43-101, has reviewed and verified all scientific or technical mining disclosurecontained in this press release. ENDS For more information, please contact: Bill Humphries/Richard Prickett Anthony Cardew/Tim RobertsonPatagonia Gold Plc Tel: +44 (0) 20 7930 0777Tel: + 44 (0)20 7409 7444 Fax: +44 (0) 20 7925 0647www.patagoniagold.com Email: tim.robertson@cardewgroup.comTrading Symbol PGD.L This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
26th Nov 20121:00 pmRNSGold Room commissioned and first gold production
22nd Nov 20127:00 amRNSLomada de Leiva Permit
25th Oct 20126:15 pmRNSPlacing and Subscription
17th Oct 201212:31 pmRNSUpdate: Lomada de Leiva
21st Sep 20124:40 pmRNSSecond Price Monitoring Extn
21st Sep 20124:35 pmRNSPrice Monitoring Extension
17th Sep 20127:00 amRNSHalf Yearly Report
10th Sep 20127:00 amRNSCap-Oeste Resource Update
4th Sep 20124:35 pmRNSPrice Monitoring Extension
20th Aug 20124:35 pmRNSPrice Monitoring Extension
31st Jul 20124:35 pmRNSPrice Monitoring Extension
13th Jul 20124:40 pmRNSSecond Price Monitoring Extn
13th Jul 20124:35 pmRNSPrice Monitoring Extension
9th Jul 20124:35 pmRNSPrice Monitoring Extension
5th Jul 20127:00 amRNSDrilling Report
2nd Jul 20124:35 pmRNSPrice Monitoring Extension
28th Jun 20121:00 pmRNSDirector Shareholding
6th Jun 20125:45 pmRNSResult of AGM
6th Jun 20127:00 amRNSPlacing and Subscription
1st Jun 20127:00 amRNSExercise of Options
30th May 201211:44 amRNSReplacement - Operations Update: Lomada de Leiva
30th May 20127:00 amRNSOperations Update - Lomada de Leiva Gold Project
29th May 20127:00 amRNSExercise of Options
25th May 20127:00 amRNSExercise of Options
14th May 20129:38 amRNSPosting of Annual Report and Notice of AGM
25th Apr 20127:00 amRNS2011 Year End Financial Results
28th Mar 20127:00 amRNSDrilling Update - Cap-Oeste
16th Mar 20124:35 pmRNSPrice Monitoring Extension
14th Mar 20127:00 amRNSExercise of Options
7th Mar 20127:00 amRNSDirector Shareholding
6th Mar 20121:30 pmRNSExercise of Options
21st Feb 20127:00 amRNSCap-Oeste Metallurgical Test Update
20th Feb 20127:00 amRNSGrant of Options
18th Jan 201212:30 pmRNSDirector/PDMR Shareholding
12th Jan 20127:00 amRNSCap-Oeste Drilling Update
5th Jan 20127:00 amRNSACQUISITION OF ESTANCIA 'EL TRANQUILO'
20th Dec 20117:00 amRNSExercise of Options
14th Dec 20117:00 amRNSAppointment of Broker
7th Dec 201112:00 pmRNSCommencement of trading on TSX
6th Dec 20117:00 amRNSDual Listing on TSX
2nd Dec 20117:00 amRNSDirectorate Change
30th Nov 20117:00 amRNSCAP-OESTE UPDATED RESOURCE ESTIMATE
14th Nov 20117:00 amRNSChange of Registrar
3rd Nov 201111:38 amRNSDirector Declaration
2nd Nov 20117:00 amRNSDirectorate Change
31st Oct 20117:00 amRNSProgress Update - COSE
26th Oct 20117:00 amRNSFOMICRUZ SHAREHOLDERS AGREEMENT
24th Oct 20117:00 amRNSDrilling Report
3rd Oct 20113:01 pmRNSIssue of Equity
28th Sep 20117:00 amRNSInterim Statement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.