Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPatagonia Gold Regulatory News (PGD)

  • There is currently no data for PGD

Drilling Update

30 Apr 2007 07:01

Patagonia Gold PLC30 April 2007 PATAGONIA GOLD PLC Trading Symbol PGD.L 30th April 2007 DRILLING UPDATE LA PALOMA PROPERTY. SANTA CRUZ, ARGENTINA. • Resource infill drilling on the Lomada de Leiva Project located on the La Paloma property, has reported very encouraging results in the first drill holes including 18 metres at 6.87g/t gold. • Exploration drilling on the adjacent Breccia Sofia Prospect has revealed promising mineralized structures. • Chlumsky, Armbrust and Meyer (CAM), consulting and engineering group from Lakewood, Colorado, U.S.A., have undertaken a site visit and commenced work on a NI43-101 compliant Resource estimate on Lomada de Leiva. The La Paloma property block covering over 44 square kilometres is locatedapproximately 40km to the south of the town of Perito Moreno in the Santa Cruzprovince of Argentina. An infill drilling campaign commenced in February of this year on the 100% ownedLomada de Leiva Project. To date 3,024 metres in 21 HQ diamond drill holes and945 metres in 8 Reverse Circulation (RC) holes have been completed. Results from the first 9 holes are now available and significant intersectionsare listed in the table below. Drill Hole No. From Metres Interval metres Gold g/t LPD-01 9.0 18.0 6.87 including 10.0 10.0 10.86 LPD-02 35.0 21.0 4.12 including 46.0 7.0 5.17 LPD-03 90.0 13.0 7.26 including 94.0 6.0 13.45 LPD-04 63.0 8.0 1.19 and 97.0 12.0 1.32 LPD-06 64.0 24.0 3.05 including 82.0 5.0 7.16 LPD-07 38.0 20.0 2.66 including 48.0 4.0 5.89 LPD-09 73.0 12.0 2.01 and 88.0 10.0 2.07 Exploration drilling on the adjacent Breccia Sofia prospect is also ongoing. Todate 1,816 metres in 12 RC holes have been completed. Results are pending. Geology and Mineralisation Mineralisation at the Lomada de Leiva Project is hosted in Jurassic volcanicsand volcanoclastic sediments. A north north-east structural corridor dippingsteeply to the east contains brecciated and variably silicified volcanic andtuffaceous rocks which have been cut by a network of fine anastomosing quartzveins and veinlets. The breccia also contains clasts of chalcedonic quartz veinmaterial. Gold is likely to be hosted in the breccia matrix as well as the veinquartz and earlier chalcedonic veins. Petrological work is being conducted on anumber of core samples to determine the gold paragenesis in the reporting zones. The main zone of interest at Lomada de Leiva is mapped over 600 metres on strikeand greater than 20 metres in width with significant potential extending towardsBreccia Sofia, some 500 metres to the north east. PG's drill hole LLD-06containing 24m @ 3.1g/t Au is approximately 300m to the north of the previouslydrilled hole DDHLP-36 which contained 15.5m @ 2.28 g/t Au The Company's initial interrogation of the previous drilling by Barrick and thecurrent exploration drilling being conducted by the Company indicatesprospectivity to the east under gravel cover as well as potential forrepetitions or sub parallel structures to the south east. Drill programme The current drilling programme at Lomada de Leiva has been designed to validate,infill and extend the previous drilling by Barrick. The total Resource baseddrill programme contains 40 holes for an estimated 5,800 metres of both diamonddrilling and RC drilling. The programme includes a number of 'scissors' and'twins' of both the Barrick drilling and diamond to RC hole comparison forquality control purposes. A programme of exploration drilling on the peripheryof the resource area contains a planned 25 holes for a further 3,500m of bothdiamond and RC drilling. This programme will be started before the winter. At Breccia Sofia the exploration programme currently underway contains a plannedtotal of 25 holes for 2,500m of RC drilling. Resource-NI43-101 Chlumsky, Armbrust and Meyer L.L.C. (CAM), an international mineral resources,consulting and engineering group from Lakewood, Colorado, U.S.A. have beenengaged by Patagonia Gold to complete a resource estimate, to Canadian NationalInstrument 43-101, on the Lomada de Leiva Project area. CAM will also give recommendations for infill, down-dip and metallurgicaldrilling at Lomada de Leiva in preparation for environmental and scopingstudies. Sample pulps and coarse residues from the current drill programme have beenselected for initial metallurgical test work in order to quantify the recoveryfrom the ore material. Gravity extraction test work is also being undertaken. Marc Sale, (BSC. Geology, member AusIMM, member AIG) a Director and consultantto Patagonia Gold Plc and a qualified person as defined in National Instrument43-101, has reviewed and verified all scientific or technical mining disclosurecontained in this press release. ENDS For more information, please contact: Bill Humphries/Richard Prickett Anthony Cardew/Tim RobertsonPatagonia Gold Plc Tel: +44 (0) 20 7930 0777Tel: + 44 (0)20 7409 7444 Fax: +44 (0) 20 7925 0647www.patagoniagold.com Email: tim.robertson@cardewgroup.comTrading Symbol PGD.L This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
8th Sep 20117:00 amRNSDrilling Update
7th Sep 20113:38 pmRNSExercise of Options
2nd Aug 20113:15 pmRNSExercise of Options
1st Aug 20113:07 pmRNSExercise of Options
8th Jul 20114:20 pmRNSExercise of Options
9th Jun 20117:00 amRNSResult of AGM
8th Jun 20117:00 amRNSAppointment of Chief Financial Officer
6th Jun 20117:00 amRNSDrilling Report
1st Jun 20117:00 amRNSDrilling Report
18th May 20117:00 amRNSPROGRESS REPORT LOMADA GOLD PROJECT
13th May 20114:58 pmRNSGrant of Options
10th May 20111:46 pmRNSExercise of Options
9th May 20117:00 amRNSFinal Results
28th Apr 20119:32 amRNSPlacing to raise £5.25 million
19th Apr 20111:17 pmRNSPlacing and Subscription to raise £19m
14th Apr 201111:32 amRNSExercise of Options
7th Apr 20117:00 amRNSDRILLING UPDATE - CAP-OESTE
5th Apr 20117:00 amRNSPROGRESS REPORT
29th Mar 20117:00 amRNSCOSE Resource and Preliminary Economic Assessment
23rd Mar 20117:00 amRNSAmendment to Barrick Agreement
8th Mar 20118:00 amRNSExercise of Options
18th Feb 201111:29 amRNSGrant of options
10th Feb 201110:05 amRNSExercise of Options
26th Jan 20117:00 amRNSPROGRESS REPORT
5th Jan 20112:01 pmRNSExercise of Options
7th Dec 20107:00 amRNSExploration Progress
24th Nov 20107:00 amRNSProgress Report - Cap-Oeste South East Project
15th Nov 20106:15 pmRNSExercise of Options
10th Nov 20107:00 amRNSUpdate - Lomada Gold-Heap Leach Project
8th Nov 20104:30 pmRNSExercise of Options
3rd Nov 20107:00 amRNSDrilling Report
29th Oct 201011:00 amRNSExercise of Options
25th Oct 201010:00 amRNSExercise of options
25th Oct 201010:00 amRNSExercise of options
29th Sep 20107:00 amRNSHalf Yearly Report
14th Sep 201012:38 pmRNSExercise of Options
14th Sep 20107:00 amRNSAdvanced Exploration Target
10th Sep 20101:01 pmRNSDirector/PDMR Shareholding
8th Sep 20107:00 amRNSLomada Progress Report
27th Jul 20109:22 amRNSReplacement - PROGRESS REPORT
27th Jul 20107:00 amRNSPROGRESS REPORT
18th Jun 20101:21 pmRNSGrant of options
16th Jun 20105:00 pmRNSResult of AGM
16th Jun 20107:00 amRNSDrilling Report
21st May 20107:00 amRNSFinal Results
4th May 20107:00 amRNSPlacing and Subscription
16th Apr 20109:06 amRNSPermit received for Lomada de Leiva
15th Apr 20104:42 pmRNSHolding(s) in Company
14th Apr 20107:00 amRNSDrilling Report
23rd Mar 20107:00 amRNSDrilling Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.