Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPatagonia Gold Regulatory News (PGD)

  • There is currently no data for PGD

Drilling Update

30 Apr 2007 07:01

Patagonia Gold PLC30 April 2007 PATAGONIA GOLD PLC Trading Symbol PGD.L 30th April 2007 DRILLING UPDATE LA PALOMA PROPERTY. SANTA CRUZ, ARGENTINA. • Resource infill drilling on the Lomada de Leiva Project located on the La Paloma property, has reported very encouraging results in the first drill holes including 18 metres at 6.87g/t gold. • Exploration drilling on the adjacent Breccia Sofia Prospect has revealed promising mineralized structures. • Chlumsky, Armbrust and Meyer (CAM), consulting and engineering group from Lakewood, Colorado, U.S.A., have undertaken a site visit and commenced work on a NI43-101 compliant Resource estimate on Lomada de Leiva. The La Paloma property block covering over 44 square kilometres is locatedapproximately 40km to the south of the town of Perito Moreno in the Santa Cruzprovince of Argentina. An infill drilling campaign commenced in February of this year on the 100% ownedLomada de Leiva Project. To date 3,024 metres in 21 HQ diamond drill holes and945 metres in 8 Reverse Circulation (RC) holes have been completed. Results from the first 9 holes are now available and significant intersectionsare listed in the table below. Drill Hole No. From Metres Interval metres Gold g/t LPD-01 9.0 18.0 6.87 including 10.0 10.0 10.86 LPD-02 35.0 21.0 4.12 including 46.0 7.0 5.17 LPD-03 90.0 13.0 7.26 including 94.0 6.0 13.45 LPD-04 63.0 8.0 1.19 and 97.0 12.0 1.32 LPD-06 64.0 24.0 3.05 including 82.0 5.0 7.16 LPD-07 38.0 20.0 2.66 including 48.0 4.0 5.89 LPD-09 73.0 12.0 2.01 and 88.0 10.0 2.07 Exploration drilling on the adjacent Breccia Sofia prospect is also ongoing. Todate 1,816 metres in 12 RC holes have been completed. Results are pending. Geology and Mineralisation Mineralisation at the Lomada de Leiva Project is hosted in Jurassic volcanicsand volcanoclastic sediments. A north north-east structural corridor dippingsteeply to the east contains brecciated and variably silicified volcanic andtuffaceous rocks which have been cut by a network of fine anastomosing quartzveins and veinlets. The breccia also contains clasts of chalcedonic quartz veinmaterial. Gold is likely to be hosted in the breccia matrix as well as the veinquartz and earlier chalcedonic veins. Petrological work is being conducted on anumber of core samples to determine the gold paragenesis in the reporting zones. The main zone of interest at Lomada de Leiva is mapped over 600 metres on strikeand greater than 20 metres in width with significant potential extending towardsBreccia Sofia, some 500 metres to the north east. PG's drill hole LLD-06containing 24m @ 3.1g/t Au is approximately 300m to the north of the previouslydrilled hole DDHLP-36 which contained 15.5m @ 2.28 g/t Au The Company's initial interrogation of the previous drilling by Barrick and thecurrent exploration drilling being conducted by the Company indicatesprospectivity to the east under gravel cover as well as potential forrepetitions or sub parallel structures to the south east. Drill programme The current drilling programme at Lomada de Leiva has been designed to validate,infill and extend the previous drilling by Barrick. The total Resource baseddrill programme contains 40 holes for an estimated 5,800 metres of both diamonddrilling and RC drilling. The programme includes a number of 'scissors' and'twins' of both the Barrick drilling and diamond to RC hole comparison forquality control purposes. A programme of exploration drilling on the peripheryof the resource area contains a planned 25 holes for a further 3,500m of bothdiamond and RC drilling. This programme will be started before the winter. At Breccia Sofia the exploration programme currently underway contains a plannedtotal of 25 holes for 2,500m of RC drilling. Resource-NI43-101 Chlumsky, Armbrust and Meyer L.L.C. (CAM), an international mineral resources,consulting and engineering group from Lakewood, Colorado, U.S.A. have beenengaged by Patagonia Gold to complete a resource estimate, to Canadian NationalInstrument 43-101, on the Lomada de Leiva Project area. CAM will also give recommendations for infill, down-dip and metallurgicaldrilling at Lomada de Leiva in preparation for environmental and scopingstudies. Sample pulps and coarse residues from the current drill programme have beenselected for initial metallurgical test work in order to quantify the recoveryfrom the ore material. Gravity extraction test work is also being undertaken. Marc Sale, (BSC. Geology, member AusIMM, member AIG) a Director and consultantto Patagonia Gold Plc and a qualified person as defined in National Instrument43-101, has reviewed and verified all scientific or technical mining disclosurecontained in this press release. ENDS For more information, please contact: Bill Humphries/Richard Prickett Anthony Cardew/Tim RobertsonPatagonia Gold Plc Tel: +44 (0) 20 7930 0777Tel: + 44 (0)20 7409 7444 Fax: +44 (0) 20 7925 0647www.patagoniagold.com Email: tim.robertson@cardewgroup.comTrading Symbol PGD.L This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
3rd Nov 20177:00 amRNSProduction Guidance and Resource Update
11th Oct 20177:24 amRNSCalcatreu Option Extension
27th Sep 20177:00 amRNSHalf Yearly Financial Statements
19th Sep 20171:18 pmRNSInterim Results Announcement Date Replacement
19th Sep 20177:00 amRNSInterim Results Announcement Date
31st Aug 20171:00 pmRNSCap-Oeste and Exploration Update
10th Jul 20177:00 amRNSOperations Update for Cap-Oeste
1st Jun 20177:00 amRNSCompletion of the Disposal of COSE
5th May 20177:00 amRNSOperations Update
2nd May 20177:00 amRNSChange of Registered Office Address
27th Apr 201712:40 pmRNSResult of AGM
25th Apr 20177:00 amRNSDisposal of COSE and Option
19th Apr 20173:20 pmRNSHolding(s) in Company
28th Mar 20177:00 amRNSFinal Results for the Year Ended 31 December 2016
23rd Dec 20167:00 amRNSCap-Oeste Project Operations Update
7th Nov 20167:00 amRNSUruguay Exploration Update
31st Oct 20167:00 amRNSCap-Oeste Project Operations Update - REPEAT
28th Oct 20165:39 pmRNSCap-Oeste Project Operations Update
29th Sep 20167:00 amRNSHalf Yearly Financial Statements
28th Sep 20167:00 amRNSInterim Results Announcement Date
30th Aug 20167:00 amRNSCap-Oeste Project and Lomada Operations Update
1st Jul 201612:00 pmRNSBoard Changes / Issue of shares to Directors
1st Jul 20167:00 amRNSChange of Broker
16th Jun 20162:05 pmRNSSecond Price Monitoring Extn
16th Jun 20162:00 pmRNSPrice Monitoring Extension
25th May 20169:00 amRNSHolding(s) in Company
20th May 20167:00 amRNSFurther Subscription
10th May 20163:20 pmRNSResult of Open Offer and General Meeting
10th May 20163:14 pmRNSResult of AGM
22nd Apr 20167:00 amRNSSubscription and Open Offer
15th Apr 20167:00 amRNSFinal Results
26th Feb 20167:00 amRNSUpdate on Lomada and Cap-Oeste
2nd Feb 20167:00 amRNSTrilogy Earn-In Agreement
6th Jan 20167:00 amRNSFurther re: Trilogy earn-in agreement
23rd Dec 20157:00 amRNSRemoval of tax on gold exports
21st Dec 20157:00 amRNSEconomic & fiscal policy changes in Argentina
24th Nov 20157:00 amRNSLomada Production Update
9th Nov 20157:00 amRNSProposed Earn-In Agreement
26th Oct 20154:40 pmRNSSecond Price Monitoring Extn
26th Oct 20154:35 pmRNSPrice Monitoring Extension
30th Sep 20157:00 amRNSHalf Yearly Report
21st Aug 20157:00 amRNSChange of Registered Office
19th Jun 20157:00 amRNSAdditional Listing/Directors' Shareholdings
10th Jun 20153:52 pmRNSResult of AGM
10th Jun 201510:30 amRNSDirectorate Change
1st Jun 20157:00 amRNSDirectorate Change
15th May 20157:00 amRNSPosting of Annual Report and Notice of AGM
12th May 20152:21 pmRNSCap-Oeste infill drilling update
21st Apr 20157:00 amRNSAppointment of CEO
9th Apr 20157:00 amRNSFinal Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.