PROGRESS REPORT

26 Jan 2011 07:00

RNS Number : 0752A
Patagonia Gold PLC
26 January 2011
 



PATAGONIA GOLD PLC

 

Trading Symbol PGD.L

 

  26th January 2011

 

PROGRESS REPORT

CAP-OESTE, COSEGOLD-SILVER PROJECTS

LOMADA GOLD PROJECT

SANTA CRUZ PROVINCE, ARGENTINA

 

Highlights:

 

·; Final drilling results from the recently completed drilling campaign on the COSE project continue to report exceptionally high grade gold and silver, including drill hole CSE-O65-D intersecting 1.00 metre @ 346.60g/t gold and 16,519g/t silver.

 

·; A potential new mineralised vein has been discovered at Cap-Oeste with drill-hole CO-166-D intersecting 1.10 metres @ 435.40g/t gold and 1,006g/t silver within the Esperanza fault zone

 

·; Construction of the 50,000 tonne Heap Leach project at Lomada de Leiva remains on schedule, with the commissioning of the processing facility and commencement of irrigation anticipated for early March 2011.

 

The second stage extension and infill drilling campaign at COSE, comprising 23 diamond HQ core drill-holes for 6,582 metres, was completed in Q4 2010.

 

Results not previously reported include:

Hole No.

From

Interval

Grade

Grade

metres

metres

Au g/t

Ag g/t

CSE-055-D

223.50

4.70

17.88

282

CSE-057-D

208.02

4.09

121.82

2,404

CSE-059-D

230.16

8.14

8.18

466

and

252.00

1.40

24.90

55

CSE-062-D

196.00

4.40

11.53

1,058

CSE-063-D

287.20

6.80

38.66

587

including

287.20

1.80

131.02

1,469

CSE-065-D

200.50

3.50

31.92

66

and

232.40

1.00

346.60

16,519

including

233.15

0.25

1,371.60

60,141

 

Note: PGSA estimates that the reported intervals represent 75 to 80% of the true width of the mineralised structure.

 

El Tranquilo Property Block:

 

The El Tranquilo property block, covering over 60 square kilometres, contains the COSE project, the Cap-Oeste gold and silver project, the Pampa prospect and the Vetas Norte and Breccia Valentina structural trends. The property is located approximately 120km to the south east of the Lomada de Leiva gold project where development of a heap leach operation is currently in progress. 

 

COSE project:

The COSE project contains an advanced exploration target associated with the larger Cap-Oeste gold-silver deposit located 2 kilometres to the north west.

 

The central mineralised breccia zone of COSE, containing the exceptionally high grade gold and silver, has been delineated within an area 120 metres down dip by 35 metres along strike with a true width of 3.5 to 4.5 metres. The second stage drilling campaign, designed to define the limits of the mineralisation for a maiden resource, has shown the deposit to be larger than initially indicated.

The mineralisation remains open in all directions.

 

PGSA has retained Mining Engineers, Chlumsky, Armbrust and Meyer, LLC. (CAM) of Lakewood, Colorado, to independently define and describe a gold and silver Resource at COSE, which complies with Canadian National Instrument 43-101 (NI 43-101). The report, together with a preliminary economic assessment, is scheduled for completion in Q1 2011

 

NCL Ingenieria Y Construccion SA, Chile, has prepared a preliminary cost analysis to evaluate the potential CAPEX and OPEX costs involved in the development of a decline access and an underground mine, using sub-level stoping, for the extraction of the known mineralisation at COSE.

NCL's report will be incorporated into CAM's NI43-101 report.

 

Cap-Oeste project:

The Cap-Oeste project contains the Cap-Oeste Main shoot gold and silver deposit on which an NI43-101 compliant resource of 655,932 ounces of gold equivalent, 88% in the indicated category, has been delineated so far. The mineralisation at Cap-Oeste remains open in all directions.

 

A drilling campaign commenced in Q4 2010 to extend the main shoot down dip and to test the 4 other shoots (B to E) already discovered on the 1,200 metres strike length of the Bonanza fault structure. The drill campaign is ongoing.

 

Drill-hole CO-166-D, designed to test for down dip extension on E shoot, located 200 metres to the west of the Main shoot on the Bonanza fault structure, intersected a potential new mineralised vein reporting 435.40g/t gold and 1,006g/t silver over 1.1 metres within the Esperanza fault zone. The current drill campaign will be amended to further explore this exciting new discovery.

 

The Esperanza fault zone runs east-west sub-parallel on surface to the north-west trending Cap-Oeste Bonanza fault. The two fault zones have opposite dips indicating that they will intersect below the current known mineralisation providing a significant exploration target.

 

A total of 28,500 metres of drilling has been programmed in 2011 for the El Tranquilo property block of which 26,000 metres is allocated to increase the resource base on Patagonia Gold's Flagship Cap-Oeste project.

 

All drill-core was photographed prior to being cut for assaying. Samples were analysed by Alex Stewart (Assayers) Argentina SA. Check assays, standards and laboratory duplicates were performed on a systematic basis at Alex Stewart (Assayers) Argentina SA. The exceptionally high grade results have been analysed by both fire assay and gravimetric gold analysis. Gravimetric analysis is more accurate for extremely high grade gold and silver values and there has been a very good correlation of the gold fire assays values and gravimetric results with overall variation less than 5%.

 

Lomada de Leiva project:

The Lomada de Leiva gold-heap leach project (Lomada project) is located on the La Paloma property block approximately 40km to the south of the town of Perito Moreno and currently contains a Canadian National Instrument 43-101 (NI 43-101) compliant resource of 161,346 ounces of gold in the measured and indicated categories with a further inferred 73,725 ounces of gold.

 

The first stage of the Lomada project consists of constructing a 50,000 tonne trial heap leach pad and processing facility, which based on 70% recovery, is estimated to yield approximately 2,200 ounces of gold for the first 6 metre loading.

 

Construction of the heap leach pad commenced in late September 2010. The heap leach pad's 100m x 100m base area, pregnant and barren solution ponds, plant site and emergency containment dam, mining and placement of approximately 50,000 tonnes of ore on the heap leach pad, have all been completed.

 

The processing facility and irrigation system are both currently being manufactured and are both on schedule for completion and commissioning in March 2011.

 

Subject to successful leaching and additional permitting, further loading and production from the first stage heap leach will continue until the main 5 million tonne heap leach project is fully operational, scheduled for Q4 2011.

 

The features of the main heap leach project are:

 

·; Low pre-production capital of $8.5 million

·; Production of 21,000 oz. of gold/year, for a mine life of 7 years, at a cash cost of $299/oz.

·; Project cash flow before tax, of $63.6 million, based on a cash price of $850/oz. gold.

 

Marc Sale, (BSC. Geology, Fellow AusIMM, member AIG) a Director and consultant to Patagonia Gold Plc and a qualified person as defined in National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in this press release.

 

ENDS

 

For more information, please contact:

Bill Humphries / Richard Prickett

Patagonia Gold Plc

Tel: +44(0)20 7409 7444

 

Simon Raggett / Angela Peace

Strand Hanson Ltd

Tel: +44(0)20 7409 3494

David Bick / Mark Longson

Square 1 Consulting

Tel : +44(0)20 7929 5599

 

Robin Henshall / Tim Graham

Matrix Corporate Capital LLP

Tel : +44(0)20 3206 7172 / +44(0)20 3206 7206

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSEUFWIFFSESF
Date   Source Headline
22nd Jul 201910:30 amRNSScheme of arrangement becomes Effective
22nd Jul 20197:30 amRNSSuspension - Patagonia Gold Plc
19th Jul 20191:00 pmRNSCourt Sanction of Scheme of Arrangement
17th Jul 20195:30 pmRNSPatagonia Gold
12th Jul 201912:26 pmRNSResults of Court Meeting and General Meeting
3rd Jul 20194:30 pmRNSForm 8.3 - Hunt Mining Corp./Patagonia Gold PLC
21st Jun 20191:48 pmRNSHolding(s) in Company Patagonia Gold Plc
20th Jun 201912:00 pmRNSPublication of Scheme Document
18th Jun 20197:00 amRNSRevision to the 2018 Financial Statements
13th Jun 20194:00 pmRNSForm 8 (OPD) Hunt Mining Corp./Patagonia Gold PLC
13th Jun 20194:00 pmRNSForm 8.3 - Hunt Mining Corp./Patagonia Gold PLC
13th Jun 20194:00 pmRNSForm 8.3 - Hunt Mining Corp./Patagonia Gold PLC
13th Jun 20194:00 pmRNSForm 8.3 - Hunt Mining Corp./Patagonia Gold PLC
13th Jun 20197:00 amRNSLoan Facility Amendment
11th Jun 20193:53 pmBUSForm 8.3 - Patagonia Gold Plc
10th Jun 20197:00 amRNSForm 8 (OPD) - Patagonia Gold plc
7th Jun 20194:30 pmRNSForm 8.3 - Patagonia Gold plc
31st May 20197:15 amRNSCalcatreu and Cap Oeste Mineral Resource Update
31st May 20197:00 amRNSOffer for Patagonia Gold plc by Hunt Mining Corp.
11th Apr 20197:00 amRNSFinal Results
1st Mar 20197:00 amRNSUS$15 million Loan Agreement
27th Feb 20197:00 amRNSDrill Results Calcatreu Project in Argentina
19th Feb 20197:00 amRNSOperations Update
13th Feb 20197:00 amRNSDrill Results - San Jose Project in Uruguay
18th Jan 20191:00 pmRNSProduction Update
18th Jan 20191:00 pmRNSProduction Update
28th Dec 20187:00 amRNSAcquisition of Exploration Properties
21st Dec 20187:00 amRNSSale of COSE Royalty Update
11th Dec 20184:30 pmRNSSale of COSE Royalty
10th Oct 20187:00 amRNSCap Oeste and Calcatreu Update
25th Sep 20187:00 amRNSHalf Yearly Financial Statements
6th Sep 201810:15 amRNSArgentine Export Tax
11th Jul 20187:00 amRNSCap Oeste Production Update
8th Jun 20187:00 amRNSCap Oeste Production Update
1st Jun 20187:00 amRNSReceipt of Balance Payment of COSE
21st May 20187:00 amRNSFinal Payment of Calcatreu Project
9th May 20182:21 pmRNSResult of AGM
27th Apr 20187:00 amRNSNotice of AGM
24th Apr 20182:18 pmRNSOperations Update
12th Apr 20187:00 amRNSProposed Capital Reorganisation and Notice of AGM
12th Apr 20187:00 amRNSFinal Results
26th Mar 20187:00 amRNSOperations Update
21st Feb 20187:00 amRNSOperations Update
1st Feb 20187:00 amRNSAcquisition of Calcatreu Deposit
18th Jan 201811:00 amRNSPrice Monitoring Extension
28th Dec 20177:00 amRNSDefinitive Agreement - Calcatreu Deposit
19th Dec 20177:00 amRNSGrant of Options
11th Dec 20177:00 amRNSCalcatreu Option
7th Dec 20174:38 pmRNSResult of General Meeting and Open Offer
21st Nov 20177:00 amRNSSubscription and Open Offer

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.