The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPatagonia Gold Regulatory News (PGD)

  • There is currently no data for PGD

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Cap-Oeste Metallurgical Test Update

21 Feb 2012 07:00

RNS Number : 7559X
Patagonia Gold PLC
21 February 2012
 



February 21 2012

 

Patagonia Gold Provides Metallurgical Test-work Update for Cap-Oeste Gold-Silver Deposit, Argentina

 

London, UK. - February 21 2012 - Patagonia gold PLC (AIM: PGD, TSX: PAT) today announced metallurgical test-work results on its Cap-Oeste gold-silver deposit in Santa Cruz province, Argentina.

 

Highlights:

 

·; Two testwork programmes completed to scoping study level for both sulphide and oxide composite samples from the Cap-Oeste project indicate the potential for good recoveries in both gold (Au) and silver (Ag)

·; Recoveries of Au and Ag to concentrate from sulphide samples reported up to 88.3% and 95.5% respectively (Comp 2,Table 2)

·; Recoveries of Au and Ag from oxide testwork reported up to 98.8% and 97.5% respectively (Test 4,Table 4)

 

As part of the development of the Cap-Oeste project, Patagonia Gold has initiated a series of metallurgical testwork programmes to ascertain the expected recoveries of Au and Ag from the Cap-Oeste mineralised material. The testwork is ongoing and additional testing and optimisation work is required before a definitive process route and expected recovery can be determined.

 

Sulphide Testwork:

SGS Mineral Services, an independent laboratory located in Chile, recently completed mineralogical characterisation and flotation testwork on sulphide material samples from the Cap-Oeste project

 

Element for Assay

Sample

Au (g/t)

Ag (g/t)

Composite 2

4.2

66

Composite 3

6.5

256

Table 1-Original Hypogene-Sulphide composites used for flotation Testwork

 

Test

Concentrate Grade Au (g/t) over Time

Recovery Au (%) over Time

1 min

5 min

10 min

15 min

30 min

1 min

5 min

10 min

15 min

30 min

Comp 2

13.5

11.6

12

11.8

9.1

12

32.7

55.1

74.7

88.3

Comp 3

74.4

34.5

26

22.5

17.5

22.6

45.7

63.2

72.8

77.7

Test

Concentrate Grade Ag (g/t) over time

 Recovery Ag (%) over time

1 min

5 min

10 min

15 min

30 min

1 min

5 min

10 min

15 min

30 min

Comp 2

872

482

324

246

167

45.6

80.4

87.4

92.4

95.5

Comp 3

5477

2306

1431

1104

814

39.3

70.3

80.1

82.2

83.2

Table 2-Flotation recoveries over time for Au and Ag

Comp 2 and 3 were ground to 100um for this specific test

 

After a 30 minute cycle time recoveries of Au were 88.3% and 77.7% for composite samples 2 and 3 respectively while Ag reported 95.5% and 83.2% respectively for the same 2 samples.

 

Oxide Test-work:

G&T Metallurgical Services Ltd, an independent consulting firm located in British Colombia, has recently reported testwork results for a series of scoping level metallurgical tests carried out on a medium grade composite oxide sample gathered from historic Cap-Oeste drill core. The sample tested had Au and Ag grades of 6.78 and 604g/t respectively. Tests included gravity separation and cyanidation, non-aggressive (test 2) and aggressive (test 4), gravity separation, flotation and rougher flotation only.

 

Element for Assay

Sample

Au (g/t)

Ag (g/t)

Fe (%)

S (%)

Master Composite

6.78

604

1.41

0.23

 

Table 3-Original sample composition for G&T test-work

 

Overall Gold and Silver Recovery

Test

Gravity Conc. Dist

Flotation Conc

Cyanidation Bottle Roll

Overall Recovery

Au (%)

Ag (%)

Au (%)

Ag (%)

Au (%)

Ag (%)

Au (%)

Ag (%)

1

33.8

26.6

-

-

-

-

-

-

2

33.8

26.6

-

-

92.8

62.6

95.2

72.5

3

29.6

25.7

59.5

65.8

-

-

89.1

91.5

4

33.8

26.6

-

-

98.2

96.6

98.8

97.5

5

34.5

32.6

53.5

60.6

-

-

88

93.2

6

-

-

87.5

92.3

-

-

87.5

92.3

Table 4-Results of Scoping level Oxide Metallurgical test-work G&T

 

Results received to date are considered to be highly encouraging. G&T Metallurgical Services has been contracted to carry out pre-feasibility level definitive testwork and optimisation studies for the Cap-Oeste Sulphide and Oxide material. Approximately 1000kg of half core is currently being selected with three grade ranges from each material type. Testwork will include flotation Rougher and Cleaner tests, Knelson Gravity Separation tests, Cyanide leaching, Thickening tests, Bond Rod and Ball tests and QEMSCAN PMA.

 

This testwork programme is scheduled to commence in March 2012 with completion in Q3 2012. Further testwork will be conducted based on the findings of this programme as work proceeds on the feasibility study for Cap-Oeste.

 

Cap-Oeste Update:

El Tranquilo block contains Patagonia Gold's flagship Cap-Oeste gold and silver project, where an NI 43-101 compliant report and resource upgrade recently delineated a gold equivalent (AuEq) resource of 966,972 ounces AuEq within the Indicated category, with a further inferred resource of 228,968 ounce AuEq, as set out in "NI 43-101 Technical Report" prepared by Craig S. Bow Ph.D., CPG and Robert L. Sandefur, P.E., of Chlumsky, Armbrust & Meyer, LLC (see Company's news release dated November 30, 2011).

 

The Phase 3 drilling campaign on the Cap-Oeste deposit, consisting of 57 drillholes (CO-301D to CO-357D) totalling 20,210 metres, concluded on the February 3, 2012. Assay results are pending for 26 drill-holes and will be reported as they are received.

 

Patagonia Gold has retained mining engineers, Chlumsky, Armbrust and Meyer, LLC of Lakewood, Colorado, to independently prepare an NI 43-101 compliant report and resource upgrade on the Cap-Oeste deposit to include the Phase 3 drilling campaign. The report is scheduled for completion in Q2 2012.

 

Drilling is continuing at Cap-Oeste with three drill rigs working on the Cap-Oeste corridor, extending along six kilometres of strike from Pampa in the Northwest to Tango in the Southeast and includes the COSE high grade underground Au-Ag project.

 

COSE Update:

All bids for the construction of the decline and the mining of the bonanza grade gold and silver COSE deposit have now been received and the successful bidder will be announced once legal due diligence has been completed.

 

A temporary workshop area has been constructed and the site is now ready for mobilisation. The permanent maintenance workshop facilities are 50% complete. Mobilisation to site of the contractor is scheduled for early Q2.

 

Lomada de Leiva:

Work is proceeding on contracts for construction of the gold processing facility (Gold Room) for Patagonia Gold's Lomada de Leiva project. ANSAC Australia Pty Ltd has been awarded the contract for the construction of the carbon regeneration kiln with delivery estimated at the end of March 2012. Process Equipment International Pty Ltd of Australia has been awarded the contract for the construction of the electrowinning cells with delivery scheduled for early April. .INFA S.A. has commenced all tank and civil construction of the Gold Room and commissioning is scheduled for Q2 2012.

 

Expansion of the trial heap leach pad at Lomada is proceeding on schedule. Loading of the proposed 120,000 tonne expansion to the existing 50,000 tonne trial heap leach pad is now underway with 10,000 tonnes of mineralized material crushed to minus 100mm loaded on the pad to date. Irrigation of the first 25,000 tonne cell of the expansion will commence in March 2012.

 

QAQC

Patagonia Gold has in place a stringent quality assurance and quality control programme to ensure best practices in sampling and assaying. All samples from the Cap-Oeste project were collected by employees of Patagonia Gold S.A. and shipped directly to Alex Stewart Laboratories, an independent laboratory located in Mendoza (ISO 9001 Certified), for preparation and assay in sealed bags. All samples are assayed for gold by fire assay and silver by aqua regia digestion with Atomic Absorbtion finish, according to Alex Stewart's procedures Au4-50 and Ag4A-50. Inductively-coupled plasma (ICP) analyses for a suite of multi-elements (39 elements, including base metals and silver) were performed by procedure ICP-MA-39. Silver over limits 200 g/t were analysed by fire assay gravimetric finish. Gold above 10 g/t was re-assayed with gravimetric methods.

 

Matthew Boyes, (BSC. Geology, Fellow AusIMM., Member AIG), Chief Operating Officer for Patagonia Gold and a qualified person as defined in Canadian National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in this news release.

 

About Patagonia Gold

Patagonia Gold Plc is an advanced mining exploration company that seeks to grow shareholder value through the acquisition, exploration and development of gold and silver projects in the southern Patagonia region of Argentina. The Company is primarily focused on the development of two properties: the flagship Cap-Oeste project and the nearby COSE project, which is expected to begin generating free cash flow by 2013. Patagonia Gold, indirectly through its subsidiaries or under option agreements, has mineral rights to over 220 properties in several provinces of Argentina and Chile, covering approximately 800,000 hectares, being one of the largest landholders in the province of Santa Cruz. The Company is headquartered in London, with subsidiary offices in Buenos Aires and Toronto.

 

Patagonia Gold is listed on the Toronto Stock Exchange (TSX) under the symbol PAT and has been listed on the AIM market of the London Stock Exchange under the symbol PGD.L since 2003.

 

Cautionary Statement Regarding Forward-Looking Information

This news release includes certain information that may constitute "forward-looking information" under applicable securities legislation. Forward looking information includes, but is not limited to, statements about forecasts as to free-cash flow, strategic plans, mineral resources estimates, future operations, results of exploration, future works programs, capital expenditures and objectives. Forward-looking information is necessarily based on a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking information, including the risks identified in the Company's public disclosure. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. All forward-looking information contained in this press release is given as of the date hereof and is based upon the opinions and estimates of management and information available to management at the date hereof. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by law.

 

 

PAT-G

.

Contact Information

 

Bill Humphries, CEO

Patagonia Gold Plc

Tel: +44 (0)20 7409 7444

 

Philip Yee, CFO

Patagonia Gold Plc

Tel: +1 (416) 572 2007

 

Colin Languedoc

Barnes Communications Inc.

Tel: +1 (416) 367-5000

 

Simon Raggett / Angela Peace

Strand Hanson Ltd

Tel: +44 (0)20 7409 3494

 

Rory Scott

Mirabaud Securities LLP

Tel: +44 (0)20 7484 3510

 

David Bick/Mark Longson

Square 1 Consulting

+44 (0)20 7929 5599

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSEUFMSFESEFE
Date   Source Headline
22nd Jul 201910:30 amRNSScheme of arrangement becomes Effective
22nd Jul 20197:30 amRNSSuspension - Patagonia Gold Plc
19th Jul 20191:00 pmRNSCourt Sanction of Scheme of Arrangement
17th Jul 20195:30 pmRNSPatagonia Gold
12th Jul 201912:26 pmRNSResults of Court Meeting and General Meeting
3rd Jul 20194:30 pmRNSForm 8.3 - Hunt Mining Corp./Patagonia Gold PLC
21st Jun 20191:48 pmRNSHolding(s) in Company Patagonia Gold Plc
20th Jun 201912:00 pmRNSPublication of Scheme Document
18th Jun 20197:00 amRNSRevision to the 2018 Financial Statements
13th Jun 20194:00 pmRNSForm 8 (OPD) Hunt Mining Corp./Patagonia Gold PLC
13th Jun 20194:00 pmRNSForm 8.3 - Hunt Mining Corp./Patagonia Gold PLC
13th Jun 20194:00 pmRNSForm 8.3 - Hunt Mining Corp./Patagonia Gold PLC
13th Jun 20194:00 pmRNSForm 8.3 - Hunt Mining Corp./Patagonia Gold PLC
13th Jun 20197:00 amRNSLoan Facility Amendment
11th Jun 20193:53 pmBUSForm 8.3 - Patagonia Gold Plc
10th Jun 20197:00 amRNSForm 8 (OPD) - Patagonia Gold plc
7th Jun 20194:30 pmRNSForm 8.3 - Patagonia Gold plc
31st May 20197:15 amRNSCalcatreu and Cap Oeste Mineral Resource Update
31st May 20197:00 amRNSOffer for Patagonia Gold plc by Hunt Mining Corp.
11th Apr 20197:00 amRNSFinal Results
1st Mar 20197:00 amRNSUS$15 million Loan Agreement
27th Feb 20197:00 amRNSDrill Results Calcatreu Project in Argentina
19th Feb 20197:00 amRNSOperations Update
13th Feb 20197:00 amRNSDrill Results - San Jose Project in Uruguay
18th Jan 20191:00 pmRNSProduction Update
18th Jan 20191:00 pmRNSProduction Update
28th Dec 20187:00 amRNSAcquisition of Exploration Properties
21st Dec 20187:00 amRNSSale of COSE Royalty Update
11th Dec 20184:30 pmRNSSale of COSE Royalty
10th Oct 20187:00 amRNSCap Oeste and Calcatreu Update
25th Sep 20187:00 amRNSHalf Yearly Financial Statements
6th Sep 201810:15 amRNSArgentine Export Tax
11th Jul 20187:00 amRNSCap Oeste Production Update
8th Jun 20187:00 amRNSCap Oeste Production Update
1st Jun 20187:00 amRNSReceipt of Balance Payment of COSE
21st May 20187:00 amRNSFinal Payment of Calcatreu Project
9th May 20182:21 pmRNSResult of AGM
27th Apr 20187:00 amRNSNotice of AGM
24th Apr 20182:18 pmRNSOperations Update
12th Apr 20187:00 amRNSProposed Capital Reorganisation and Notice of AGM
12th Apr 20187:00 amRNSFinal Results
26th Mar 20187:00 amRNSOperations Update
21st Feb 20187:00 amRNSOperations Update
1st Feb 20187:00 amRNSAcquisition of Calcatreu Deposit
18th Jan 201811:00 amRNSPrice Monitoring Extension
28th Dec 20177:00 amRNSDefinitive Agreement - Calcatreu Deposit
19th Dec 20177:00 amRNSGrant of Options
11th Dec 20177:00 amRNSCalcatreu Option
7th Dec 20174:38 pmRNSResult of General Meeting and Open Offer
21st Nov 20177:00 amRNSSubscription and Open Offer

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.