Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says.Watch here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPetra Diamonds Regulatory News (PDL)

Share Price Information for Petra Diamonds (PDL)

Share Price is delayed by 15 minutes
Get Live Data
7.40    0.79 (10.53%)
Bid:
7.42
Ask:
9.16
Spread: 1.74 (23.45%)
Market Cap: £24.82m
PDL Live PriceLast checked at - London Stock Exchange

Intraday Petra Diamonds Share Chart

Alto Cuilo Update

25 Apr 2006 07:01

Petra Diamonds Ld25 April 2006 Petra Diamonds Limited Exploration Update - Alto Cuilo Petra Diamonds Limited ("Petra" or "the Company"), the AIM-quoted and ASX-listeddiamond mining group, announces an update with regards to the Alto Cuilo project("Alto Cuilo") in north-eastern Angola. Highlights: • Alto Cuilo's potential as a major diamond project is furthersubstantiated, with the estimated surface area of kimberlitic occurrencesincreasing to approximately 1,437 hectares (15 March 2006: 1,323) • 38 kimberlitic occurrences (15 March 2006: 33) now confirmed bydrilling • Third core drill rig to arrive on site this month - two months aheadof schedule - to further accelerate the rate of discoveries and information flow • 412 alluvial pits (15 March 2006: 350) completed Kimberlite Exploration Programme Since the Company's last update on 15 March 2006 within the Interim ResultsStatement, solid exploration progress has been made at Alto Cuilo, with afurther increase in the estimated surface area of kimberlitic occurrences toapproximately 1,437 hectares. Ongoing drilling of the anomalies identified by the Midas low level helicopteraeromagnetic survey has now resulted in the identification of a further 5kimberlitic occurrences with an estimated surface area of approximately 114hectares. This takes the total to 38 kimberlitic occurrences with an estimatedsurface area of approximately 1,437 hectares, a significant increase over theresults reported by the Company on 15 March 2006. Drilling in excess of 19,196metres on 140 holes has been undertaken to date, with 104 of these holesintersecting kimberlitic material, a success rate of 74%. The estimated surface area of the kimberlitic occurrences is based on theinterpretation of the magnetic anomalies identified, together with analysis ofdrilling results. The third core drill rig, which will serve to further accelerate the rate ofdiscoveries and information flow, is now expected to arrive on site earlier thanexpected, in April 2006, two months ahead of schedule. The large diameter drillrig and 10 tonne per hour sample plant remain on track for delivery in June2006. Alluvial Exploration Programme The alluvial pitting and trenching programme continues in order to furtherevaluate the potential for economically viable alluvial deposits, with 412 pitsalready completed. An economic feasibility study is underway on an area ofspecific interest. Adonis Pouroulis, Chairman of Petra, comments "We are making rapid progress inthe evaluation and development of Alto Cuilo, working alongside our jointventure partner BHP Billiton, and this process will be further accelerated bythe arrival of the additional drill rig this month. We continue to be excitedby the large scale of kimberlitic discoveries on site, which demonstrate themajor potential of the project." Ends Notes 1. The information in this update that relates to Exploration Results, MineralResources or Ore Reserves is based on information compiled by Jim Davidson, Pr.Sci Nat (reg No 400031/06), who is a Member of the Geological Society of SouthAfrica, a 'Recognised Overseas Professional Organisation' ('ROPO'), included ina list promulgated by the ASX from time to time. Jim Davidson is a full-timeemployee of the Company and has sufficient experience which is relevant to thestyle of mineralisation and type of deposit under consideration and to theactivity which he is undertaking to qualify as a Competent Person as defined inthe 2004 Edition of the 'Australasian Code for Reporting of Exploration Results,Mineral Resources and Ore Reserves'. Jim Davidson has given his written consentto the inclusion in this announcement of the matters based on his information inthe form and context in which it appears. 2. It should be noted that the potential quantity in this report is conceptualin nature, there has been insufficient exploration to define a Mineral Resourceand it is uncertain if further exploration will result in the determination of aMineral Resource. For further information, please contact: Justine Howarth / Cathy Malins Telephone: +44 (0) 20 7493 3713Parkgreen Communications, London Kevin Skinner Telephone: +61 (0) 8 8234 9555Field PR, Adelaide Mobile: +61 (0) 414 822 631 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
7th Dec 20077:00 amRNSUpdate on Angolan Operations
22nd Nov 20077:51 amRNSCullinan Diamon Mine Acq
19th Nov 20077:02 amRNSAngola Helicopter Accident
8th Oct 20079:32 amRNSFinal Results to June 2007
8th Oct 20077:10 amRNSAlto Cuilo Drilling Results
8th Oct 20077:01 amRNSReserve & Resource Increase
2nd Oct 20077:01 amRNSIssue of Shares
24th Sep 20077:01 amRNSKoffiefontein Tender Results
20th Sep 200710:02 amRNSKono project - update
20th Sep 200710:00 amRNSUpdate on Kono Project
14th Sep 200710:12 amRNSAcquisition
17th Aug 20079:56 amRNSKoffiefontein stone recovery
17th Aug 20078:53 amRNSAIM Rule 26
17th Aug 20078:00 amRNSAIM Rule 26
7th Aug 200710:46 amRNSKoffiefontein Tender Result
1st Aug 20077:01 amRNSRe Joint Venture
18th Jul 20077:01 amRNSKoffiefontein Completion
29th Jun 20078:56 amRNSKoffiefontein Update
8th Jun 20074:00 pmRNSBlock Admission Application
6th Jun 20072:12 pmRNSHolding in Company
31st May 20072:55 pmRNSHolding(s) in Company
31st May 20072:52 pmRNSDirector/PDMR Shareholding
29th May 20077:03 amRNSAlto Cuilo - MBS Results
16th May 20077:03 amRNSBotswana Update
14th May 20077:01 amRNSAlto Cuilo Update
24th Apr 200710:48 amRNSResult of EGM
5th Apr 200710:09 amRNSHolding in Company
4th Apr 20079:12 amRNSHolding in Company
27th Mar 20077:01 amRNSNotice of EGM
19th Mar 20075:25 pmRNSResult of EGM
8th Mar 20077:01 amRNSRemoval from ASX
6th Mar 20072:32 pmRNSIssue of Equity
5th Mar 20071:23 pmRNSExercise of Options
5th Mar 20071:21 pmRNSGrant of Options
2nd Mar 20071:37 pmRNSNotice Investing Strategy/EGM
1st Mar 20077:52 amRNSUSD20m Convertible Loan
1st Mar 20077:07 amRNSProposed Acquisition
1st Mar 20077:04 amRNSProposed Acquisition
28th Feb 20077:02 amRNSInterim Results
14th Feb 20072:58 pmRNSHolding(s) in Company
5th Feb 20077:01 amRNSUpdate re removal from ASX
1st Feb 200712:11 pmRNSUpdate re Koffiefontein Mine
1st Feb 20077:01 amRNS2nd Quarter Results
31st Jan 20077:01 amRNSUpdate - Calibrated Diamonds
11th Jan 200711:11 amRNSHolding in Company
8th Jan 20078:49 amRNSHolding(s) in Company
21st Dec 20067:01 amRNSMining Licence Granted
20th Dec 20061:09 pmRNSAlto Cuilo
18th Dec 200612:17 pmRNSUpdate - Koffiefontein Mine
8th Dec 200611:45 amRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.