REMINDER: Our user survey closes on Friday, please submit your responses here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Res Regulatory News (PANR)

Share Price Information for Pantheon Res (PANR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 31.35
Bid: 31.25
Ask: 32.45
Change: -1.30 (-3.98%)
Spread: 1.20 (3.84%)
Open: 33.00
High: 33.45
Low: 31.20
Prev. Close: 32.65
PANR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update

9 Feb 2018 07:00

RNS Number : 3904E
Pantheon Resources PLC
09 February 2018
 

9 February 2018

 

Pantheon Resources plc

 

Operational update

 

 

Pantheon Resources plc ("Pantheon" or "the Company"), the AIM-quoted oil and gas exploration company with a working interest in several conventional project areas in Tyler and Polk Counties, onshore East Texas, is pleased to provide the following operational update:

 

 

VOBM#4, Tyler County, 75% working interest

Throughout January 2018 extensive analytical work has been undertaken correlating the Wilcox in VOBM#4 to the analogous Jazz Field in southern Tyler County. In that field, operated by Unit Petroleum Company, wells were initially drilled vertically but over recent times the drilling method has very successfully evolved into a horizontal approach with multiple stage fracture stimulations ("fracs"). The Jazz field is some 2,000 feet deeper and in a higher pressure and temperature setting than in VOBM#4 so correlation and analysis has been an involved process. The operator plans to perforate, test and if warranted, frac the Uppermost Wilcox zone in VOBM#4 which is viewed to be the highest profile target. The VOBM#4 well is scheduled to commence testing operations this coming weekend. If tested results merit a frac, for logistical reasons operations will ideally be synchronised with the contemplated frac of VOBM#1. Pantheon will report results at the conclusion of testing operations.

 

 

VOBM#1, Polk County, 55.1% working interest

As reported in early January 2018, production volumes from our Polk County gas processing facility had unexpectedly declined to c.3,000 mcfpd, which was below our anticipated rates for the VOBM#1 and VOBM#3 wells. An independent expert reservoir consultant was contracted to undertake a comprehensive review in order to diagnose the underlying cause of the production decline and to recommend appropriate remedial action where relevant. This review has included numerous diagnostic wellbore operations, mainly focused on the VOBM#1 well, as well as detailed analysis of relevant wells in the Double A Wells field. During this time, there has been minimal production into the gas plant while diagnostic operations were in progress.

 

During the diagnostic procedures, obstructions were encountered at the top of the perforations in VOBM#1, which is believed to be as a result of the long time period the well was shut in, along with movable formation sand. A xylene/acid treatment was performed and, after further remedial treatment, a wire line bailer was used which recovered considerable amounts of formation sand. The well was again tested into the sales line at rates in excess of 6,800 mcfpd and c.250 bopd on a 22/64th choke; a material improvement. The VOBM#1 well has now been shut in to avoid additional blockage and has scheduled a fracture stimulation procedure similar to those successfully performed in the adjacent Double A Wells Field to bypass reservoir skin damage and preclude further sanding issues.

 

 

Implications of the blockage in VOBM#1

It is clear that the VOBM#1 wellbore has been impacted by blockages/skin damage, most likely compounded by the long period that the well has been shut in. Our limited actions to remove the blockage to date have significantly improved flow rates and experience in the Double A Wells field suggests that fracture stimulation treatment offers the potential for material improvement. In fact, as a result of this analysis, there is a strong case to suggest that all future wells would benefit from proactive fracking. The Company believes that the same issue may have affected the VOBM#2H and VOBM#3 wells, given they were drilled with the same combination of drill bit, oil based drilling mud, and have been shut in for extended periods.

 

 

VOBM#2H, Polk County, 55.1% working interest

The VOBM#2H well was turned to the sales line for only a few hours before line freezing occurred. The rates observed were c.300 mcfpd with modest oil production. A line heater was ordered and will be installed to permit full production into the sales line. Prior to freezeoff, the wells shut-in pressure was anomalously low compared to the VOBM#1 and #3 wells; however, over the past 10 days the shut-in tubing pressure has increased by over 1,200 psi indicating that "skin damage" has also affected this well's tested performance. The increased pressure buildup may suggest a down hole bypass of that condition. This is both significant and welcome news.

 

 

VOBM#5, Polk County, 75% working interest

Operations on VOBM#5 are ongoing and on schedule. Results are expected to be announced by the end of February 2018 or at the conclusion of testing operations should they be warranted.

 

 

Tyler County Gas Processing Update

Pantheon and the operator are in present negotiations with the operators of two regional gas processing plants in Tyler County for the transportation and processing of natural gas from the presently shut-in VOS#1 discovery well, and potentially future Tyler County production wells. There can be no guarantee that an agreement on acceptable terms will be reached.

 

Jay Cheatham, CEO, said:

"It has been a very busy period for Pantheon and the operator Vision. Operations are progressing well on VOBM#5 and preparations to begin testing VOBM#4 are underway and we look forward to announcing the results of these once complete. As well as the in-depth analysis on VOBM#1 and the design for remedial action to get the well back on stream, we have also been busy with ongoing lease renewals and dealing with the operators of two regional gas processing plants in Tyler County. I am also encouraged by the increase in shut-in tubing pressure at our problematic VOBM#2H well. We have always believed the VOBM#2H location to offer tremendous potential even though flow rates will be limited by the compromised wellbore. Nevertheless, this is a positive sign for future production from this well which we believe has the potential to flow at lower rates, but for a very long period of time.

"The decline in production in Polk County in January warranted a concerted scientific approach to analyse, understand and diagnose the appropriate remediation technique. Analysis to date suggests that the cause appears to be wellbore specific factors, most likely as a result of the wells having been shut in for extended periods, and does not suggest a downgrade in the potential of our acreage."

 

 

 

-Ends -

 

Further information:

 

Pantheon Resources plc

+44 20 7484 5361

Jay Cheatham, CEO

 

Justin Hondris, Director, Finance and Corporate Development

 

 

 

Stifel Nicolaus Europe Limited (Nominated Adviser and broker)

+44 20 7710 7600

Callum Stewart

 

Ashton Clanfield

 

Nicholas Rhodes

 

 

 

FTI Consulting

+44 20 3727 1000

Ed Westropp

 

James Styles

 

 

For further information on Pantheon Resources plc, see the website at: www.pantheonresources.com 

 

In accordance with the AIM Rules - Note for Mining and Oil & Gas Companies - June 2009, the information contained in this announcement has been reviewed and signed off by Jay Cheatham, a qualified Chemical & Petroleum Engineer, who has over 40 years' relevant experience within the sector.

 

The information contained within this RNS is considered to be inside information prior to its release.

 

Neither the contents of the Company's website nor the contents of any website accessible from hyperlinks on the Company's website (or any other website) is incorporated into, or forms part of, this announcement.

 

 

Glossary

mcfpd: thousand cubic feet per day

P50 denotes a best estimate scenario of Prospective Resources

bopd: barrels of oil per day

psi: pounds per square inch

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDDXGDDRBGBGII
Date   Source Headline
13th Dec 201310:00 amRNSAGM Statement
19th Nov 20136:11 pmRNSHolding(s) in Company
15th Nov 20137:00 amRNSFinal Results
2nd Sep 20133:07 pmRNSHolding(s) in Company
22nd Jul 20132:22 pmRNSTyler County Update
20th May 20132:53 pmRNSHolding(s) in Company
8th May 201312:41 pmRNSHolding(s) in Company
2nd May 201312:18 pmRNSHolding(s) in Company
27th Mar 20137:00 amRNSHalf Yearly Report
26th Mar 20132:30 pmRNSHolding(s) in Company
20th Feb 20132:26 pmRNSHolding(s) in Company
17th Dec 201211:22 amRNSHolding(s) in Company
14th Dec 20122:18 pmRNSResult of AGM
14th Dec 201210:00 amRNSAGM Statement
20th Nov 201212:09 pmRNSNotice of AGM and Presentation by JV Operator
15th Nov 20127:00 amRNSFinal Results
5th Sep 20121:40 pmRNSTyler County Update
5th Sep 201212:28 pmRNSHolding(s) in Company
17th Apr 20121:33 pmRNSInvestor Call Presentation
12th Apr 20123:00 pmRNSInvestor Call
30th Mar 20127:00 amRNSHalf Yearly Report
11th Jan 201212:42 pmRNSUpdate
9th Dec 20117:00 amRNSAGM Statement
22nd Nov 20117:00 amRNSDirector/PDMR Shareholding
17th Nov 20115:54 pmRNSDirector/PDMR Shareholding
16th Nov 20117:00 amRNSNotice of AGM
16th Nov 20117:00 amRNSFinal Results
26th Sep 20118:01 amRNSForm 8.5 (EPT/NON-RI)
15th Aug 20117:00 amRNSOperations Update
28th Jun 20112:41 pmRNSDirectorate Change
31st Mar 201110:00 amRNSHalf Yearly Report
28th Jan 201112:52 pmRNSOperations update
10th Dec 20101:59 pmRNSResult of AGM
10th Dec 20108:00 amRNSAGM Statement
17th Nov 20107:00 amRNSNotice of AGM
17th Nov 20107:00 amRNSFinal Results
30th Jul 20107:00 amRNSOperations Update
1st Jun 20107:00 amRNSOperations Update
21st May 201012:57 pmRNSHolding(s) in Company
7th Apr 20106:18 pmRNSHolding(s) in Company
31st Mar 20107:00 amRNSHalf Yearly Report
8th Mar 20107:00 amRNSOperations Update
2nd Feb 20107:00 amRNSOperating Update
31st Dec 20097:00 amRNSTotal Voting Rights
30th Dec 20091:52 pmRNSHolding(s) in Company
18th Dec 20097:00 amRNSDirector/PDMR Shareholding
15th Dec 200912:22 pmRNSPlacing of Shares
4th Dec 20094:22 pmRNSResult of AGM
4th Dec 20099:01 amRNSAGM Statement
11th Nov 20091:50 pmRNSNotice of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.