Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Res Regulatory News (PANR)

Share Price Information for Pantheon Res (PANR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 32.45
Bid: 9.27
Ask: 39.80
Change: 0.00 (0.00%)
Spread: 30.53 (329.342%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 32.45
PANR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update

30 Dec 2016 07:00

RNS Number : 0095T
Pantheon Resources PLC
30 December 2016
 

 

 

 

 

30 December 2016

 

Pantheon Resources plc

 

Operational update

 

Pantheon Resources plc ("Pantheon" or "the Company"), the AIM-quoted oil and gas exploration and development company with a working interest (of 50%-58%) in several conventional projects located onshore in Tyler & Polk Counties, East Texas, notes recent market speculation and is pleased to provide the following operational update:

 

VOBM#4 well, Tyler County, East Texas (50% working interest)

 

The VOBM#4 well has encountered two separate, potentially significant, hydrocarbon-bearing zones before it reached its primary (Eagle Ford sandstone) and secondary (Austin Chalk) targets. For both commercial and operational reasons, it has been decided to test the shallower of these two formations before any further drilling to deeper depths is completed. A lower cost workover rig is being brought in to carry out this testing while the Nabors F-12 rig has relocated to re-enter and complete the VOBM#2 well vertically, as previously announced.

 

The shallower of the two zones, the Wilcox sandstone, has been a prolific producing formation elsewhere in Texas and was encountered in VOBM#4 at c.11,700 ft depth over an interval exceeding 35ft, which compares extremely favourably to Wilcox analog producing wells. Additionally, a second formation which is both separate and independent from the Wilcox was encountered at below 14,000 ft depth, requiring intermediate casing to be set. This zone, in the highly fractured Navarro carbonate formation, also exhibited significant gas shows over a gross interval exceeding 100 ft during drilling.

 

In drilling through this second zone, the well suffered mud losses and, in order to section off this highly porous zone, it has proved necessary to set a 7 5/8ths inch casing section sooner than planned. This operation has been completed successfully. As a consequence however, drilling operations to the deeper, more highly pressured Austin Chalk and Eagle Ford sandstone formations have been halted until the potentially productive Wilcox formation can be tested. To continue drilling would have required an additional casing string and the consequent use of smaller tools, increasing the risk of possible future mechanical and/or environmental issues in the higher pressure deeper formations.

 

Drilling was halted at c.15,150 ft, some 400 ft above the target depth in the Eagle Ford sandstone. A drillable cast iron bridge plug ("CIBP") has been installed to isolate and test the shallower Wilcox formation. The CIBP can be drilled out at any time if required. The Nabors F-12 rig has now been demobilized and relocated to the VOBM#2H site, where it will re-enter and complete the drilling of that well. A lower cost workover rig will be used for testing operations at VOBM#4. Results will be announced upon completion of testing operations on the Wilcox. The company regards the discovery of another potentially highly productive hydrocarbon zone at shallower depths as a positive development that adds a new potential source of cash generation and value to the working interest holders.

 

 

VOBM#2H well, Polk County, East Texas (58% working interest)

 

The Nabors F-12 rig has been mobilized to the VOBM#2H well which, as announced previously, will be re-entered and drilled as a vertical completion, targeting the Eagle Ford sandstone formation at a total measured depth of c 17,500 ft. Following detailed analysis of the recently completed VOBM#3 well, the target location has been revised to take account of refined seismic interpretation and seeks to extend upon the material discovery made at VOBM#1 and feed into the combined planned production system for all the company's Polk County discoveries.

 

 

Jay Cheatham, CEO, said:

 

"I am extremely happy to report the presence of two new potentially significant zones, both of which are productive regionally and have the potential to be significant also for Pantheon. Drilling operations have been halted some 400 feet above the primary target formation, so the full potential of those lower zones remain. These two new zones have not been factored into any resource estimates, and if successful, have the potential to further add to the potential of our very exciting acreage position."

 

"Finding these zones charged above the Eagle Ford sandstone is a positive indicator that we are in the right geological location for the centre basin test, to which we remain committed. Future wells will be engineered with a larger casing programme in order to account safely for the presence of these zones as we extend our drilling programme. Shareholders should note that these are not the same zones as the additional zone encountered in the VOS#1 well."

 

 

 Further information:

 

Pantheon Resources plc

+44 20 7484 5359

Jay Cheatham, CEO

 

Justin Hondris, Director, Finance and Corporate Development

 

 

 

Stifel Nicolaus Europe Limited (Nominated Adviser and broker)

+44 20 7710 7600

Callum Stewart

 

Ashton Clanfield

Nicholas Rhodes

 

 

 

FTI Consulting

+44 20 3727 1000

Ed Westropp

 

James Styles

 

 

 

For further information on Pantheon Resources plc, see the website at: www.pantheonresources.com

Neither the contents of the Company's website nor the contents of any website accessible from hyperlinks on the Company's website (or any other website) is incorporated into, or forms part of, this announcement.

 

This announcement contains inside information as defined in Article 7 of the Market Abuse Regulation No. 596/2014 and is disclosed in accordance with the Company's obligations under Article 17 of those Regulations.

 

In accordance with the AIM Rules - Note for Mining and Oil & Gas Companies - June 2009, the information contained in this announcement has been reviewed and signed off by Jay Cheatham, a qualified Chemical & Petroleum Engineer, who has over 40 years' relevant experience within the sector.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDGXBDDUSXBGLG
Date   Source Headline
10th Apr 20244:53 pmRNSWebinar and update
9th Apr 20247:00 amRNSKodiak resource upgraded to 1.2 billion barrels
2nd Apr 20244:30 pmRNSDirector/PDMR Notification
28th Mar 20247:05 amRNSProgress on Funding and Development Planning
21st Mar 202411:51 amRNSTR-1: Notification of major holdings
18th Mar 20247:00 amRNSUnaudited Interim Results
14th Mar 20247:00 amRNSQuarterly Repayment of Unsecured Convertible Bonds
5th Mar 20245:05 pmRNSResponse to Share Price Volatility
2nd Feb 20247:00 amRNSTR-1: Notification of major holdings
1st Feb 20247:00 amRNSDirector/PDMR notification
24th Jan 20243:15 pmRNSResult of AGM & Investor Presentation Details
23rd Jan 20247:00 amRNSAnnual General Meeting
2nd Jan 20247:00 amRNSTR-1: Notification of major holdings
19th Dec 20237:00 amRNSFinal Results for the Year Ended 30 June 2023
14th Dec 20237:04 amRNSSuccessful Acquisition of Leases
12th Dec 20237:00 amRNSAppointment of Independent Non-Executive Director
21st Nov 20234:36 pmRNSStrategy Update
15th Nov 20231:54 pmRNSInvestor Presentation via Investor Meet Company
14th Nov 202311:56 amRNSBond Payment, Placement & Corporate Update
19th Oct 20237:00 amRNSValidation of frac design and fluid sampling
18th Oct 20237:00 amRNSPantheon Presenting at OTC Oil and Gas Conference
4th Oct 20237:00 amRNSReplacement TR-1: Notification of major holdings
3rd Oct 20234:02 pmRNSTR-1: Notification of major holdings
27th Sep 20237:00 amRNSCommencement of Operations - Re-entry of Alkaid-2
14th Sep 20233:34 pmRNSWebinar and update
8th Sep 20238:20 amRNSInvestor Presentation Webinar
7th Sep 20237:00 amRNSPrivate Placement
30th Aug 20237:00 amRNSDirector/PDMR Notification
29th Aug 20237:00 amRNSExpert Report Confirms Estimate for Kodiak Field
28th Jul 20237:57 amRNSReplacement Operational Update
28th Jul 20237:00 amRNSOperational Update
14th Jul 20239:30 amRNSInvestor Presentation via Investor Meet Company
10th Jul 20237:00 amRNSInvestor Presentation via Investor Meet Company
3rd Jul 20238:53 amRNSAppointment of Independent Non-Executive Director
28th Jun 20234:58 pmRNSWebinar and Strategy Update
26th Jun 202312:54 pmRNSUpcoming Webinar - Registration Details
15th Jun 20233:50 pmRNSIssue of Equity and Total Voting Rights
8th Jun 20237:00 amRNSAppointment of Executive Chairman
1st Jun 20237:00 amRNSLease Award
23rd May 20234:32 pmRNSUpdate on Fundraise
18th May 20235:40 pmRNSBlock Listing Six Monthly return
17th May 20237:00 amRNSResult of Capital Raise
16th May 20235:07 pmRNSRetail Offer via PrimaryBid
16th May 20234:59 pmRNSProposed Placing and Subscription
21st Apr 20237:00 amRNSOperational and corporate update
31st Mar 20237:00 amRNSUnaudited Interim Results
22nd Mar 20235:09 pmRNSResult of AGM
20th Mar 20234:45 pmRNSAGM update
20th Mar 20237:00 amRNSAGM webinar & corporate update
16th Mar 20232:08 pmRNSUpcoming Webinar – Registration Details

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.