Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Resources plc Regulatory News (PANR)

Share Price Information for Pantheon Resources plc (PANR)

Share Price is delayed by 15 minutes
Get Live Data
14.60    -1.25 (-7.89%)
Bid:
14.70
Ask:
14.97
Spread: 0.27 (1.837%)
Market Cap: £212.85m
PANR Live PriceLast checked at - London Stock Exchange

Intraday Pantheon Resources plc Share Chart

Operational Update

30 Dec 2016 07:00

RNS Number : 0095T
Pantheon Resources PLC
30 December 2016
 

 

 

 

 

30 December 2016

 

Pantheon Resources plc

 

Operational update

 

Pantheon Resources plc ("Pantheon" or "the Company"), the AIM-quoted oil and gas exploration and development company with a working interest (of 50%-58%) in several conventional projects located onshore in Tyler & Polk Counties, East Texas, notes recent market speculation and is pleased to provide the following operational update:

 

VOBM#4 well, Tyler County, East Texas (50% working interest)

 

The VOBM#4 well has encountered two separate, potentially significant, hydrocarbon-bearing zones before it reached its primary (Eagle Ford sandstone) and secondary (Austin Chalk) targets. For both commercial and operational reasons, it has been decided to test the shallower of these two formations before any further drilling to deeper depths is completed. A lower cost workover rig is being brought in to carry out this testing while the Nabors F-12 rig has relocated to re-enter and complete the VOBM#2 well vertically, as previously announced.

 

The shallower of the two zones, the Wilcox sandstone, has been a prolific producing formation elsewhere in Texas and was encountered in VOBM#4 at c.11,700 ft depth over an interval exceeding 35ft, which compares extremely favourably to Wilcox analog producing wells. Additionally, a second formation which is both separate and independent from the Wilcox was encountered at below 14,000 ft depth, requiring intermediate casing to be set. This zone, in the highly fractured Navarro carbonate formation, also exhibited significant gas shows over a gross interval exceeding 100 ft during drilling.

 

In drilling through this second zone, the well suffered mud losses and, in order to section off this highly porous zone, it has proved necessary to set a 7 5/8ths inch casing section sooner than planned. This operation has been completed successfully. As a consequence however, drilling operations to the deeper, more highly pressured Austin Chalk and Eagle Ford sandstone formations have been halted until the potentially productive Wilcox formation can be tested. To continue drilling would have required an additional casing string and the consequent use of smaller tools, increasing the risk of possible future mechanical and/or environmental issues in the higher pressure deeper formations.

 

Drilling was halted at c.15,150 ft, some 400 ft above the target depth in the Eagle Ford sandstone. A drillable cast iron bridge plug ("CIBP") has been installed to isolate and test the shallower Wilcox formation. The CIBP can be drilled out at any time if required. The Nabors F-12 rig has now been demobilized and relocated to the VOBM#2H site, where it will re-enter and complete the drilling of that well. A lower cost workover rig will be used for testing operations at VOBM#4. Results will be announced upon completion of testing operations on the Wilcox. The company regards the discovery of another potentially highly productive hydrocarbon zone at shallower depths as a positive development that adds a new potential source of cash generation and value to the working interest holders.

 

 

VOBM#2H well, Polk County, East Texas (58% working interest)

 

The Nabors F-12 rig has been mobilized to the VOBM#2H well which, as announced previously, will be re-entered and drilled as a vertical completion, targeting the Eagle Ford sandstone formation at a total measured depth of c 17,500 ft. Following detailed analysis of the recently completed VOBM#3 well, the target location has been revised to take account of refined seismic interpretation and seeks to extend upon the material discovery made at VOBM#1 and feed into the combined planned production system for all the company's Polk County discoveries.

 

 

Jay Cheatham, CEO, said:

 

"I am extremely happy to report the presence of two new potentially significant zones, both of which are productive regionally and have the potential to be significant also for Pantheon. Drilling operations have been halted some 400 feet above the primary target formation, so the full potential of those lower zones remain. These two new zones have not been factored into any resource estimates, and if successful, have the potential to further add to the potential of our very exciting acreage position."

 

"Finding these zones charged above the Eagle Ford sandstone is a positive indicator that we are in the right geological location for the centre basin test, to which we remain committed. Future wells will be engineered with a larger casing programme in order to account safely for the presence of these zones as we extend our drilling programme. Shareholders should note that these are not the same zones as the additional zone encountered in the VOS#1 well."

 

 

 Further information:

 

Pantheon Resources plc

+44 20 7484 5359

Jay Cheatham, CEO

 

Justin Hondris, Director, Finance and Corporate Development

 

 

 

Stifel Nicolaus Europe Limited (Nominated Adviser and broker)

+44 20 7710 7600

Callum Stewart

 

Ashton Clanfield

Nicholas Rhodes

 

 

 

FTI Consulting

+44 20 3727 1000

Ed Westropp

 

James Styles

 

 

 

For further information on Pantheon Resources plc, see the website at: www.pantheonresources.com

Neither the contents of the Company's website nor the contents of any website accessible from hyperlinks on the Company's website (or any other website) is incorporated into, or forms part of, this announcement.

 

This announcement contains inside information as defined in Article 7 of the Market Abuse Regulation No. 596/2014 and is disclosed in accordance with the Company's obligations under Article 17 of those Regulations.

 

In accordance with the AIM Rules - Note for Mining and Oil & Gas Companies - June 2009, the information contained in this announcement has been reviewed and signed off by Jay Cheatham, a qualified Chemical & Petroleum Engineer, who has over 40 years' relevant experience within the sector.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDGXBDDUSXBGLG
Date   Source Headline
9th Mar 20204:37 pmRNSPrice Monitoring Extension
27th Feb 20207:30 amRNSRestoration - Pantheon Resources Plc
25th Feb 202011:01 amRNSFinal Results for the Year Ended 30 June 2019
20th Feb 20207:00 amRNSPublication of Annual Results
20th Feb 20207:00 amRNSPublication of Annual Results
30th Jan 20207:00 amRNSNew Project OIP estimate and Company presentation
23rd Jan 20207:00 amRNSResource Update
2nd Jan 20207:30 amRNSSuspension - Pantheon Resources plc
2nd Jan 20207:00 amRNSPublication of Audited Financial Results
12th Dec 20197:07 amRNSAcquisition of key leases in Alaska's North Slope
15th Nov 20194:40 pmRNSSecond Price Monitoring Extn
15th Nov 20194:35 pmRNSPrice Monitoring Extension
6th Nov 20197:01 amRNSCompany Update
17th Oct 20197:00 amRNSAcquisition of Halliburton 25% WI in Alkaid/Phecda
2nd Oct 20197:59 amRNSAppointment of Non-Executive Director
24th Sep 201910:00 amRNSPantheon Resources Alaskan Project Update and Q&A
12th Sep 201912:32 pmRNSInvitation to Alaskan Project Update and Q&A
2nd Sep 20195:25 pmRNSDirector/PDMR Shareholding
14th Aug 201912:11 pmRNSIssue of Equity
9th Aug 20192:45 pmRNSTR-1: Notification of major holdings
5th Aug 20197:00 amRNSOpening of Data Room and Farmout Process
26th Jul 201911:18 amRNSHolding(s) in Company
19th Jul 201912:48 pmRNSResult of Capital Raising
19th Jul 20198:06 amRNSClose of Capital Raising
18th Jul 20194:58 pmRNSProposed Placing and Subscription of US$6.5million
12th Jul 20197:00 amRNSAlaskan Update
25th Jun 20193:25 pmRNSCorporate Presentation June 2019
24th Jun 20197:00 amRNSPartnership with High-Tech Geophysics specialist
6th Jun 20197:00 amRNSResource upgrade - Alkaid prospect
5th Jun 20197:00 amRNSCEO Q&A podcast confirmed
30th May 20197:00 amRNSUpdate on timing of CEO Q&A podcast
20th May 20197:00 amRNSAlaskan update and notification of CEO Q&A podcast
14th May 20194:40 pmRNSSecond Price Monitoring Extn
14th May 20194:35 pmRNSPrice Monitoring Extension
2nd Apr 20197:19 amRNSAlkaid Well Update
28th Mar 20197:00 amRNSInterim Results for the Six Months Ended 31/12/18
25th Mar 20197:54 amRNSAlkaid Well - successful flow test
20th Mar 20197:00 amRNSOperational Update
18th Mar 201910:19 amRNSPassing of John Walmsley, Non-executive Director
13th Mar 20197:00 amRNSWinx-1 Exploration Well drilling update
12th Mar 20195:07 pmRNSDirector's interest in shares
11th Mar 20197:00 amRNSAppointment of Technical Director
6th Mar 20197:00 amRNSOperational update: Winx-1 and Alkaid wells
4th Mar 20197:00 amRNSWinx-1 Exploration Well drilling update
1st Mar 20197:45 amRNSWinx-1 Exploration Well drilling update
25th Feb 20197:00 amRNSUpdate on Alkaid Well, Alaska
18th Feb 20197:26 amRNSSpudding of Winx-1 well in Alaska
21st Jan 20194:40 pmRNSHolding(s) in Company
21st Jan 20198:49 amRNSCompletion of the Great Bear Acquisition
17th Jan 20198:16 amRNSStatement re Winx-1 Well

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.