25 Sep 2008 07:54
|
Β 25 SeptemberΒ 2008 |
PantheonΒ ResourcesΒ plcΒ -Β Drilling UpdateΒ
Pantheon ResourcesΒ plcΒ ("Pantheon")Β or ("the Company"), the AIM-quotedΒ oil and gas exploration company active in theΒ Gulf of Mexico,Β issues the following drilling update.
Testing operations have commenced at theΒ Jumonville #1 well. The initial testΒ involved the perforation of the bottom five feet of the primary target interval. ThisΒ was designed to determineΒ water saturations andΒ theΒ anticipated oil/water contactΒ in the Miogyp formation. The results confirmΒ that the MiogypΒ reservoir has a water drive with brackish water at theΒ base.Β This water-drive should result in increased recovery efficiency during productionΒ in the event of a commercial discovery being confirmed.
It is now the intention to run an extended testing sequence in the upper portion of the Miogyp reservoir where the interpreted hydrocarbon interval is located. This sequence is designed to test a 10 feet interval near the top of the formation. This equates to the depth where several hundred barrels of oil circulated to surface when originally penetrated. This next phase of testing should commence within the next 48 hours.Β ItΒ will beΒ the critical phase in determining the overall reservoir quality
Pantheon is participating with a 15% working interestΒ in the Bullseye prospectΒ prior to back-in rights. Should back-in occur, Pantheon will participate with an 11.25% working interest.Β
In accordance with the AIM Rules, the information in thisΒ announcementΒ has been reviewed andΒ approvedΒ by Jay Cheatham, who has over 30 years'Β relevant experience within the sector.
For further information on Pantheon Resources plc, see the website atΒ www.pantheonresources.com
Β
- end -
Further information:
Pantheon Resources PLC
|
Jay Cheatham CEO |
+44Β 20 7484 5359 |
Oriel Securities LimitedΒ (Nominated Adviser)
|
Michael Shaw |
+44 20 7710 7600 |
Follow the stocks