Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPan African Resources Regulatory News (PAF)

Share Price Information for Pan African Resources (PAF)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 24.80
Bid: 24.70
Ask: 24.80
Change: 0.15 (0.61%)
Spread: 0.10 (0.405%)
Open: 25.40
High: 25.40
Low: 24.30
Prev. Close: 24.65
PAF Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Statement re Resource Upgrade for Phoenix

20 May 2010 07:00

20 May 2010 Pan African Resources PLC (`Pan African' or the `Company') (Incorporated and registered in England and Wales under Companies Act 1985 with registered number 3937466 on 25 February 2000) Share code on AIM: PAF Share code on JSE: PAN ISIN: GB0004300496 Resource Upgrade for Phoenix

Pan African Resources PLC (AIM: PAF, JSE: PAN) is pleased to announce the results of a resource statement compiled for its Phoenix Platinum Project (`Phoenix Project'), situated in the Bushveld Complex in South Africa.

Highlights

- Total resource increased by 15.8% to 469,000 ounces 4E Platinum Group Metals (`PGM 4E's')

- In situ grade increased by 2.6% to 3.15g/t PGM 4E's

The Phoenix Project

The Phoenix Project is 100% owned by Phoenix Platinum Mining (Pty) Limited (`Phoenix'), a wholly owned subsidiary of Pan African.

Phoenix concluded an exclusivity agreement with International Ferro Metals SA (Pty) Limited (`IFM') on 18 February 2010, which agreement sets out the terms and conditions under which Phoenix may construct a Chromite Tailings Retreatment Plant (`CTRP') on the IFM property. The site position for the CTRP was agreed on 31 March 2010 and the detailed engineering design of the CTRP is ahead of schedule. Construction is anticipated to commence during the first quarter of 2011 while first production is planned for September 2011.

Metallicon Process Consulting (Pty) Limited was appointed by Pan African to validate and verify all procedures relating to the resource estimate. The estimation process was carried out through a comprehensive drilling, sampling and assaying programme that underpins the resource calculation.

The process resulted in the metal content increasing by 15.8% from 405,000 ounces PGM 4E's reported in the Company's unaudited interim results for the six months ended 31 December 2009, to 469,000 ounces PGM 4E's. The grade increased by 2.6% from 3.07g/t PGM 4E's to 3.15g/t PGM 4E's. The resource is summarised below:

Phoenix Resource Estimation

SURFACE TAILINGS RESOURCE - 100% Attributable to Pan African

Category Volume (m²) Tonnes Grade(4E) g/t* Kilos* Ounces*Dumps and Pits Measured 774 000 1 627 000 2.54 4 130 133 000Dumps and Pits Indicated 83 000 175 000 2.03 355 11 000Dumps and Pits Inferred 77 000 162 000 2.00 324 10 000 Total 934 000 1 964 000 2.45 4 809 154 000

CURRENT ARISINGS RESOURCE - 100% Attributable to Pan African

Category Volume (m²) Tonnes Grade(4E) g/t* Kilos* Ounces*Current Arisings Measured 761 000 1 597 000 3.66 5 845 188 000

Indicated 211 000 443 000 3.66 1 622 52 000 Inferred 305 000 642 000 3.66 2 348 75 000 Total 1 277 000 2 682 000 3.66 9 815 315 000 TOTAL RESOURCE - 100% Attributable to Pan AfricanArea Category Volume (m²) Tonnes Grade(4E) g/t* Kilos* Ounces*All Measured 1 535 000 3 224 000 3.09 9 975 321 000All Indicated 294 000 618 000 3.20 1 977 63 000All Inferred 382 000 804 000 3.33 2 672 85 000Total 2 211 000 4 646 000 3.15 14 624 469 000

Jan Nelson, CEO of Pan African, commented:

"The increase in the total resources, assuming a 50% recovery, extends the life of the Phoenix Project from 13 years to approximately 16 years, based on a production rate of 15,000 ounces PGM 4E's per annum. In addition, the drilling programme underpins the high quality of the asset and will further enhance the operating margin of the project and increase the value to Pan African's bottom line".

ENDS

For further information on Pan African Resources and a presentation providing more detail on the Phoenix acquisition, please visit the website at www.panafricanresources.com

Notes to the Editor:

The resource estimate has been compiled in accordance with the South African Code for Reporting of Exploration Results, Mineral Resources and Mineral Reserves (`SAMREC'). The verification and validation of the data and the information contained in this announcement was managed by Martin Bevelander, Group Consulting Geologist for Pan African, who is accredited with the South African Council for Natural Scientific Professions (`SACNASP'). He has consented to the inclusion of the technical information in this announcement in the form and context in which it appears.

The services of additional independent consultants and experts were also secured to assist and support this process.

- Sampling and Drilling: Plat-Tau Mining Services, Gold Mine Sand and Slime Dams Drillers CC and Dump & Dune;

- Assaying, mineralogy and metallurgical testwork: Mintek and SGS Lakefield Resources Africa (Pty) Limited;

- Geological modelling and data conversion for the resource estimate: Geologix MRC (Pty) Limited, a South African Resources and Geological Consultancy: Deon van den Heever is accredited with the SACNASP. He has consented to the inclusion of the technical information in this announcement in the form and context in which it appears.

- Michael Valenta of Metallicon Process Consulting (Pty) Ltd is a professional engineer with the Engineering Council of South Africa (`ECSA') and on the International Register of Professional Engineers as specified under the Washington Accord. He has consented to the inclusion of the technical information in this announcement in the form and context in which it appears.

Enquiries:

Pan African Resources

Jan Nelson, Chief Executive Officer

+27 (0) 11 243 2900

Nicole Spruijt, Public Relations

+27 (0) 11 243 2900 RBC Capital Markets Martin Eales / Brett Jacobs +44 (0) 20 7029 7881

Macquarie First South (Pty) Ltd

Melanie de Nysschen +27 (0) 11 583 2000

St James's Corporate Services Limited

Phil Dexter

+44 (0) 20 7499 3916

vendor
Date   Source Headline
10th Jan 201912:07 pmRNSSecond Price Monitoring Extn
10th Jan 201912:02 pmRNSPrice Monitoring Extension
19th Dec 20182:30 pmPRNNotification of Change in Auditor
17th Dec 201812:07 pmRNSSecond Price Monitoring Extn
17th Dec 201812:02 pmRNSPrice Monitoring Extension
13th Dec 20184:40 pmRNSSecond Price Monitoring Extn
13th Dec 20184:35 pmRNSPrice Monitoring Extension
11th Dec 20184:40 pmRNSSecond Price Monitoring Extn
11th Dec 20184:35 pmRNSPrice Monitoring Extension
7th Dec 20184:41 pmRNSSecond Price Monitoring Extn
7th Dec 20184:35 pmRNSPrice Monitoring Extension
6th Dec 20187:00 amPRNChange in JSE Sponsor
5th Dec 20184:35 pmRNSPrice Monitoring Extension
30th Nov 20187:00 amPRNRoyal Sheba Update
23rd Nov 20184:40 pmRNSSecond Price Monitoring Extn
23rd Nov 20184:35 pmRNSPrice Monitoring Extension
21st Nov 20187:00 amPRNResult of AGM
13th Nov 20184:40 pmRNSSecond Price Monitoring Extn
13th Nov 20184:35 pmRNSPrice Monitoring Extension
12th Nov 20184:40 pmRNSSecond Price Monitoring Extn
12th Nov 20184:35 pmRNSPrice Monitoring Extension
8th Nov 201812:07 pmRNSSecond Price Monitoring Extn
8th Nov 201812:02 pmRNSPrice Monitoring Extension
6th Nov 20187:00 amPRNOperational Update quarter ended 30/09/18
31st Oct 201812:07 pmRNSSecond Price Monitoring Extn
31st Oct 201812:02 pmRNSPrice Monitoring Extension
29th Oct 201810:00 amPRNNotice of AGM & No Change Statement
23rd Oct 20184:40 pmRNSSecond Price Monitoring Extn
23rd Oct 20184:35 pmRNSPrice Monitoring Extension
19th Oct 20184:02 pmPRNDirector/PDMR Shareholding
11th Oct 201812:07 pmRNSSecond Price Monitoring Extn
11th Oct 201812:02 pmRNSPrice Monitoring Extension
4th Oct 201812:07 pmRNSSecond Price Monitoring Extn
4th Oct 201812:02 pmRNSPrice Monitoring Extension
24th Sep 20185:00 pmPRNDirector/PDMR Shareholding
24th Sep 20185:00 pmPRNDirector/PDMR Shareholding
20th Sep 20184:40 pmRNSSecond Price Monitoring Extn
20th Sep 20184:35 pmRNSPrice Monitoring Extension
19th Sep 20187:00 amPRNFinal Results
14th Sep 20189:18 amPRNTrading Statement and Production Update
7th Sep 20187:00 amPRNBarberton Mines Wage Negotiations Update
6th Sep 20187:00 amPRNRoyal Sheba Project Update
16th Aug 20187:00 amPRNElikhulu's Inaugural Gold Pour
13th Jul 201812:02 pmRNSPrice Monitoring Extension
12th Jul 20188:30 amPRNOperational Update
11th Jul 201812:08 pmRNSSecond Price Monitoring Extn
11th Jul 201812:02 pmRNSPrice Monitoring Extension
5th Jul 201812:07 pmRNSSecond Price Monitoring Extn
5th Jul 201812:02 pmRNSPrice Monitoring Extension
28th Jun 201812:07 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.