Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPan African Resources Regulatory News (PAF)

Share Price Information for Pan African Resources (PAF)

Share Price is delayed by 15 minutes
Get Live Data
95.95    0.50 (0.52%)
Bid:
95.80
Ask:
96.00
Spread: 0.20 (0.209%)
Market Cap: £1.95b
PAF Live PriceLast checked at - London Stock Exchange

Intraday Pan African Resources Share Chart

Statement re Resource Upgrade for Phoenix

20 May 2010 07:00

20 May 2010 Pan African Resources PLC (`Pan African' or the `Company') (Incorporated and registered in England and Wales under Companies Act 1985 with registered number 3937466 on 25 February 2000) Share code on AIM: PAF Share code on JSE: PAN ISIN: GB0004300496 Resource Upgrade for Phoenix

Pan African Resources PLC (AIM: PAF, JSE: PAN) is pleased to announce the results of a resource statement compiled for its Phoenix Platinum Project (`Phoenix Project'), situated in the Bushveld Complex in South Africa.

Highlights

- Total resource increased by 15.8% to 469,000 ounces 4E Platinum Group Metals (`PGM 4E's')

- In situ grade increased by 2.6% to 3.15g/t PGM 4E's

The Phoenix Project

The Phoenix Project is 100% owned by Phoenix Platinum Mining (Pty) Limited (`Phoenix'), a wholly owned subsidiary of Pan African.

Phoenix concluded an exclusivity agreement with International Ferro Metals SA (Pty) Limited (`IFM') on 18 February 2010, which agreement sets out the terms and conditions under which Phoenix may construct a Chromite Tailings Retreatment Plant (`CTRP') on the IFM property. The site position for the CTRP was agreed on 31 March 2010 and the detailed engineering design of the CTRP is ahead of schedule. Construction is anticipated to commence during the first quarter of 2011 while first production is planned for September 2011.

Metallicon Process Consulting (Pty) Limited was appointed by Pan African to validate and verify all procedures relating to the resource estimate. The estimation process was carried out through a comprehensive drilling, sampling and assaying programme that underpins the resource calculation.

The process resulted in the metal content increasing by 15.8% from 405,000 ounces PGM 4E's reported in the Company's unaudited interim results for the six months ended 31 December 2009, to 469,000 ounces PGM 4E's. The grade increased by 2.6% from 3.07g/t PGM 4E's to 3.15g/t PGM 4E's. The resource is summarised below:

Phoenix Resource Estimation

SURFACE TAILINGS RESOURCE - 100% Attributable to Pan African

Category Volume (m²) Tonnes Grade(4E) g/t* Kilos* Ounces*Dumps and Pits Measured 774 000 1 627 000 2.54 4 130 133 000Dumps and Pits Indicated 83 000 175 000 2.03 355 11 000Dumps and Pits Inferred 77 000 162 000 2.00 324 10 000 Total 934 000 1 964 000 2.45 4 809 154 000

CURRENT ARISINGS RESOURCE - 100% Attributable to Pan African

Category Volume (m²) Tonnes Grade(4E) g/t* Kilos* Ounces*Current Arisings Measured 761 000 1 597 000 3.66 5 845 188 000

Indicated 211 000 443 000 3.66 1 622 52 000 Inferred 305 000 642 000 3.66 2 348 75 000 Total 1 277 000 2 682 000 3.66 9 815 315 000 TOTAL RESOURCE - 100% Attributable to Pan AfricanArea Category Volume (m²) Tonnes Grade(4E) g/t* Kilos* Ounces*All Measured 1 535 000 3 224 000 3.09 9 975 321 000All Indicated 294 000 618 000 3.20 1 977 63 000All Inferred 382 000 804 000 3.33 2 672 85 000Total 2 211 000 4 646 000 3.15 14 624 469 000

Jan Nelson, CEO of Pan African, commented:

"The increase in the total resources, assuming a 50% recovery, extends the life of the Phoenix Project from 13 years to approximately 16 years, based on a production rate of 15,000 ounces PGM 4E's per annum. In addition, the drilling programme underpins the high quality of the asset and will further enhance the operating margin of the project and increase the value to Pan African's bottom line".

ENDS

For further information on Pan African Resources and a presentation providing more detail on the Phoenix acquisition, please visit the website at www.panafricanresources.com

Notes to the Editor:

The resource estimate has been compiled in accordance with the South African Code for Reporting of Exploration Results, Mineral Resources and Mineral Reserves (`SAMREC'). The verification and validation of the data and the information contained in this announcement was managed by Martin Bevelander, Group Consulting Geologist for Pan African, who is accredited with the South African Council for Natural Scientific Professions (`SACNASP'). He has consented to the inclusion of the technical information in this announcement in the form and context in which it appears.

The services of additional independent consultants and experts were also secured to assist and support this process.

- Sampling and Drilling: Plat-Tau Mining Services, Gold Mine Sand and Slime Dams Drillers CC and Dump & Dune;

- Assaying, mineralogy and metallurgical testwork: Mintek and SGS Lakefield Resources Africa (Pty) Limited;

- Geological modelling and data conversion for the resource estimate: Geologix MRC (Pty) Limited, a South African Resources and Geological Consultancy: Deon van den Heever is accredited with the SACNASP. He has consented to the inclusion of the technical information in this announcement in the form and context in which it appears.

- Michael Valenta of Metallicon Process Consulting (Pty) Ltd is a professional engineer with the Engineering Council of South Africa (`ECSA') and on the International Register of Professional Engineers as specified under the Washington Accord. He has consented to the inclusion of the technical information in this announcement in the form and context in which it appears.

Enquiries:

Pan African Resources

Jan Nelson, Chief Executive Officer

+27 (0) 11 243 2900

Nicole Spruijt, Public Relations

+27 (0) 11 243 2900 RBC Capital Markets Martin Eales / Brett Jacobs +44 (0) 20 7029 7881

Macquarie First South (Pty) Ltd

Melanie de Nysschen +27 (0) 11 583 2000

St James's Corporate Services Limited

Phil Dexter

+44 (0) 20 7499 3916

vendor
Date   Source Headline
9th Sep 20254:15 pmPRNHolding(s) in Company
8th Sep 20257:00 amPRNIntention to move from AIM to London Main Market
4th Sep 20258:00 amPRNGroup Trading Statement for the year ended 30 June 2025 (current reporting period)
3rd Sep 20254:15 pmPRNHolding(s) in Company
3rd Sep 20253:44 pmPRNHolding(s) in Company
22nd Jul 20254:15 pmPRNHolding(s) in Company
10th Jul 20258:00 amPRNTransaction in Own Shares
8th Jul 20258:00 amPRNTransaction in Own Shares
4th Jul 20258:00 amPRNTransaction in Own Shares
4th Jul 20257:00 amPRNHolding(s) in Company
3rd Jul 20258:00 amPRNTransaction in Own Shares
2nd Jul 202510:45 amPRNHolding(s) in Company
2nd Jul 20258:00 amPRNTransaction in Own Shares
1st Jul 202510:00 amPRNHolding(s) in Company
30th Jun 202511:00 amPRNShare Buyback Programme
26th Jun 20259:00 amPRNDirector/PDMR Shareholding
11th Jun 20258:45 amPRNOperational Update, Record Half-Year Gold Production, Substantial Decrease in Group Gearing and Share Buyback Programme
9th Jun 202512:00 pmPRNHolding(s) in Company
8th May 20251:15 pmPRNHolding(s) in Company
30th Apr 202511:10 amPRNHolding(s) in Company
16th Apr 20259:33 amPRNHolding(s) in Company
25th Mar 202512:15 pmPRNHolding(s) in Company
25th Mar 20258:30 amPRNHolding(s) in Company
19th Mar 20257:00 amRNSResult of placing in Pan African Resources PLC
18th Mar 20254:40 pmRNSSecondary placing in Pan African Resources PLC
5th Mar 20258:11 amPRNHolding(s) in Company
12th Feb 20257:00 amPRNUnaudited Interim Financial Results for the six months ended 31 December 2024
10th Feb 20259:30 amPRNGroup Trading Statement for the six months ended 31 December 2024
28th Jan 20259:40 amPRNHolding(s) in Company
27th Dec 202411:30 amPRNHolding(s) in Company
17th Dec 20243:05 pmPRNHolding(s) in Company
12th Dec 202411:40 amPRNHolding(s) in Company
12th Dec 20247:00 amPRNOperational Update and Completion of the Tennant Consolidated Mining Group Transaction
9th Dec 20248:00 amPRNIssue of New Ordinary Shares, AIM application and Total Voting Rights
21st Nov 20243:45 pmPRNResult of AGM & Salient Dividend Dates
5th Nov 20248:30 amPRNPan African acquires Tennant Consolidated Mining Group Pty Ltd in Australia and Sudanese exploration activities suspended
31st Oct 20247:00 amPRNPan African announces successful commissioning of the Mogale Tailings Retreatment (MTR) operation
30th Oct 20247:00 amPRNNotice of Annual General Meeting
28th Oct 20247:00 amPRNHolding(s) in Company
22nd Oct 202411:30 amPRNHolding(s) in Company
21st Oct 20249:00 amPRNListing of new Sustainability-Linked Instrument, Notificiation of Additional Guarantors and Notification of a Partial Capital Redemption
1st Oct 20247:00 amPRNAppointment of Financial Director
25th Sep 20248:00 amPRNHolding(s) in Company
11th Sep 20247:00 amPRNSummarised audited results for the year ended 30 June 2024
5th Sep 202411:30 amPRNTrading Statement for the year ended 30 June 2024 (Current Reporting Period)
29th Jul 20247:00 amPRNOperational Update for the year ended 30 June 2024 and Board Change
19th Jul 202412:04 pmPRNRegistration of Capital Reduction and Effective Date
12th Jul 202410:15 amPRNHolding(s) in Company
2nd Jul 20243:45 pmPRNDirector/PDMR Shareholding
2nd Jul 20243:45 pmPRNDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.