The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPan African Regulatory News (PAF)

Share Price Information for Pan African (PAF)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 24.70
Bid: 24.60
Ask: 24.80
Change: -0.95 (-3.70%)
Spread: 0.20 (0.813%)
Open: 24.50
High: 25.45
Low: 24.30
Prev. Close: 25.65
PAF Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

2016 Abridged Mineral Resource & Mineral Reserve Report

21 Sep 2016 07:01

PAN AFRICAN RESOURCES PLC - 2016 Abridged Mineral Resource & Mineral Reserve Report

PAN AFRICAN RESOURCES PLC - 2016 Abridged Mineral Resource & Mineral Reserve Report

PR Newswire

London, September 20

Pan African Resources PLC

(Incorporated and registered in England and Wales under Companies Act 1985 with registered number 3937466 on 25 February 2000)

Share code on AIM: PAF

Share code on JSE: PAN

ISIN: GB0004300496

("Pan African Resources" or the "Company" or the "Group")

2016 Abridged Mineral Resource & Mineral Reserve Report

Pan African Resources, the African-focused precious metals producer, is pleased to announce that the 2016 Abridged Mineral Resource and Mineral Reserve Report ("MR&MR") has been released and is available on the Company's website at www.panafricanresources.com. A summary of the report, including the Group Mineral Resource and Mineral Reserve statement as at 30 June 2016, has been provided below.

Overview

3.0 million ounces (“Moz”) or 9.4% gross annual increase in Group gold resources to 34.9Moz (2015: 31.9Moz). 0.4Moz or 3.8% gross annual decrease in Group gold reserves to 10.0Moz (2015: 10.4Moz). No material change in Group platinum group elements (“PGE”) resource, 0.6Moz (2015: 0.6Moz). 0.3 Moz or 60% gross annual decrease in Group PGE reserves to 0.2Moz (2015: 0.5Moz). Following International Ferro Metals Limited (“IFM”) being placed in business rescue, the PGE mineral reserves at Phoenix Platinum declined year-on-year by 0.3Moz. 23.3 million tonnes (“Mt”) of mineable tonnage in situ coal from Uitkomst Colliery. Down dip extension of the high grade 11 Block of the main reef complex (“MRC”) orebody by a further 70 metres. This extension to the MRC orebody resulted in additional mineral reserves at Fairview Mine, thereby extending the life-of-mine (“LOM”) of Barberton Mines to 22 years. Positive grade/tonnage profile for the 25-26 levels at Evander No. 8 Shaft, thereby maintaining the LOM of Evander Mines to 16 years. Surface exploration drilling commenced at Evander Mines targeting the 2010 payshoot. Positive pre-feasibility study (“PFS”) of the Elikhulu tailings retreatment project (“Elikhulu Project”), the Company mandated DRA Projects (Pty) Limited (“DRA Projects”) to conduct a definitive feasibility study (“DFS”) on the project. This study will be completed by November 2016.

Gold

Group Gold Mineral Resources

The Group's attributable gold Mineral Resources increased from 31.9Moz in June 2015 to 34.9Moz in June 2016, equating to an annual increase of 3.0Moz, or 9.4%. This increase can be attributed to additional resources estimated for the Elikhulu Project at Evander Mines and a higher gold price used for the declaration of the Group’s gold Mineral Resource.

As at 30 June 2016
TonnesGradeContained Gold
Category(million)(g/t)TonnesMoz
Mineral ResourceMeasured6.610.2767.82.2
Indicated261.32.42633.520.4
Inferred69.45.56386.012.3
Pan African ResourcesTotal337.33.221 087.334.9

Group Gold Mineral Reserves

The Group's gold attributable Mineral Reserves decreased from 10.4Moz in June 2015 to 10.0Moz in June 2016 - an annual decrease of 0.4Moz, or 3.8%.

As at 30 June 2016
TonnesGradeContained Gold
Category(million)(g/t)TonnesMoz
Mineral ReserveProved5.07.7838.81.3
Probable77.33.51271.88.7
Pan African ResourcesTotal82.33.71310.610.0

The decrease in the Group’s gold Mineral Reserve can be attributed to mining depletion for the year under review.

Platinum Group Elements

Group PGE Mineral Resources

The Group's attributable PGE Mineral Resources did not change materially for the year under review.

As at 30 June 2016
TonnesGradeContained PGE’s
Category(million)(g/t)TonnesMoz
Mineral ResourceMeasured1.42.433.40.1
Indicated1.32.653.40.1
Inferred3.53.6512.60.4
Pan African ResourcesTotal6.23.1619.00.6

Group PGE Mineral Reserves

The Group's attributable PGE Mineral Reserves decreased from 0.5Moz in June 2015 to 0.2Moz in June 2016 - an annual decrease of 0.3Moz or 60%. This decrease is attributed to the exclusion of the mineral reserves from the Lesedi Mine, current arisings. Following IFM being placed in business rescue, the PGE mineral reserve at Phoenix Platinum declined year on year.

As at June 2016TonnesGradeContained PGE’s
Category(million)(g/t)TonnesMoz
Mineral ReserveProved1.42.433.40.1
Probable1.32.653.40.1
Pan African ResourcesTotal2.72.546.80.2

Coal

Group Coal Mineral Resources

The Group's attributable coal mineral resource was declared as 23.3Mt as at June 2016.

ResourcesRaw Coal Qualities (ad)
ClassMTIS (Mt)RDIM (%)Ash (%)VM (%)FC (%)CV (MJ/kg)TS (%)
Measured15.01.502.523.524.349.824.751.23
Indicated4.31.512.523.823.949.824.621.14
Inferred4.01.502.423.423.450.925.021.03
Total23.3
Resources12% Ash Product
ClassMTIS (Mt)Yield (%)IM (%)Ash (%)VM (%)FC (%)CV (MJ/kg)TS (%)
Measured15.073.92.712.028.057.328.960.96
Indicated4.376.22.812.027.557.829.000.97
Inferred4.080.12.612.026.658.929.220.92
Total23.3

The abbreviations used in the above table are as follows:

MTIS: mineable tonnes in situ; RD: relative density; IM: inherent moisture; VM: volumetric moisture; FC: fixed carbon; CV: calorific value; and TS: total sulphur.

Group organic growth

Current exploration drilling as well as accessing and developing of our orebodies were maintained during the year. The strategy of converting Mineral Resource to Mineral Reserve was progressed by moving organic projects further up the mining value chain towards commissioning. The tables below reflect the progress of near-mine growth projects that have contributed ounces to the Mineral Resource for the year.

Group: Exploring the orebody - exploration drilling

OperationTotal metresNo. of boreholesAverage channel width (cm)No. of intersections above cut-offAverage grade (g/t)Total expenditure (Rm)
Barberton Mines9 9161181465017.467.0
Evander Mines567927116.200.6

Exploration drilling projects at Barberton Mines yielded positive results on all three operations (see table below).

At Fairview Mine, exploration drilling confirmed a further 70m down dip extension of the MRC orebody with a high-grade intersection of 125.80g/t over 680cm.

Recent borehole results are detailed below:

Borehole numberChannel width cmGrade g/t
Fairview Bh 5951680125.80
Sheba Bh SWR 1510028.90
New Consort Bh 14L1910022.80
New Consort Bh 33C210017.00

Group: Accessing the orebody - on-reef development

OperationTotal on-reef development (m)Average grade (g/t)
Barberton Mines9264.41
Evander Mines33041.59

Barberton Mines: Developing the orebody - capital ore reserve projects

ProjectY/E 30 June 2016 (m)Y/E 30 June 2015 (m)Y/E 30 June 2014 (m)Potential resource (oz)
Sheba – pillar development54082435123 599
Sheba – Edwin Bray to Thomas and Joe’s Luck area27517113 246
Fairview – 11 Level Royal Reef0 (equipping old main shaft)0 (equipping old main shaft)017 000
Fairview – 1# ore reserve opening1318415414 821
Fairview – No. 3 Shaft deepening642601 600
Fairview – 64-68 Level581447295860 766
Sheba Western Cross1332957132 022
Royal Sheba1891650206 750
Consort – 33-45PC38725819310 000
Consort – MMR pillar development00173(new target area)
8-3 #17327253900

Evander Mines: Developing the orebody - capital ore reserve projects

ProjectY/E 30 June 2016 (m)Y/E 30 June 2015 (m)Y/E 30 June 2014 (m)Potential resource (oz)
2 Decline 24–25 Level3569046861 200 000
25 A block ventilation8710925

Group growth projects

Elikhulu

Following receipt of a positive PFS for the Elikhulu Project, the Company mandated DRA Projects to conduct a DFS on the project. The study will be available by November 2016, after which shareholders will be appraised.

In March 2016, SRK Consulting (South Africa) (Pty) Limited independently estimated the mineral resource of the Elikhulu Project at 178.7Mt @ 0.29g/t (1.7Moz).

2010 Payshoot

A surface exploration drilling programme was initiated during the year to define additional mineral resources for the 2010 payshoot. The 2010 payshoot is a secondary payshoot originating from the main Kinross payshoot and can be accessed from the No. 3 Decline at Evander No. 7 Shaft. Previous surface holes in this area delivered results up to 36.04g/t over a Kimberley reef width of 49cm. The potential mineral resource of the 2010 payshoot is estimated at 6.3Mt @ 10.82g/t (2.2Moz).

The Company’s current generic growth projects are summarised hereunder:

Evander Mine ProjectsCategoryTonnes (million)Grade (g/tOunces (Moz)Depth below surface (m)
Elikhulu ProjectResource178.70.291.7on surface
2010 PayshootResource6.310.822.21 800 – 2 500

Reporting in compliance with SAMREC Code

To meet the requirement of the South African Code for the Reporting of Exploration Results, Mineral Resources and Mineral Reserves ("SAMREC Code") that the material reported as a Mineral Resource should have "reasonable and realistic prospects for eventual economic extraction", Pan African Resources has determined an appropriate cut-off grade which has been applied to the quantified mineralised body. In determining the cut-off grade, Pan African Resources uses a gold price of R550 000/kg. At our underground mines, the optimal cut-off is defined as the lowest grade at which an orebody can be mined to maximise total profits, under a specified set of mining parameters. The Mineral Resource optimiser tool accordingly developed in-house was applied to the Mineral Resource inventory.

The optimiser programme requires the following inputs to convert the Mineral Resource to the Mineral Reserve:

the on-mine database inventory of all mineral resource blocks; an assumed gold price - ZAR450 000/kg; planned production rates for each mine; mine call factor; plant recovery factors; and historical cash operating costs and other efficiency factors.

The Mineral Reserves represent that portion of the Measured and Indicated Mineral Resources above cut-off in the LOM plan and have been estimated after considering the modifying factors affecting extraction. A range of disciplines has been involved at each mine in the LOM planning process including geology, surveying, planning, mining engineering, rock engineering, metallurgy, financial management, human resources management and environmental management.

Note: Mineral Resources are inclusive of the Mineral Reserve, unless otherwise stated.

Rounding of numbers contained in this announcement may result in minor computational discrepancies.

Competent Person

The competent person for Pan African Resources, Mr Barry Naicker, the group Mineral Resource Manager, signs off the MR&MR for the Group and has reviewed and approved the information contained in this announcement in writing. He is a member of the South African Council for Scientific Professions (400234/10). Mr Naicker has 15 years of experience in economic geology and mineral resource management.

He is based at 1st Floor, The Firs, cnr. Cradock and Biermann Avenues, Rosebank, 2196, Gauteng.

Johannesburg

21 September 2016

Contact Information

Corporate Office

The Firs Office Building1st Floor, Office 101Cnr. Cradock and Biermann AvenuesRosebank, JohannesburgSouth Africa

Office: + 27 (0) 11 243 2900Facsimile: + 27 (0) 11 880 1240

Registered Office

Suite 31Second Floor107 CheapsideLondonEC2V 6DNUnited Kingdom

Office: + 44 (0) 207 796 8644Facsimile: + 44 (0) 207 796 8645

Cobus LootsDeon Louw
Pan African Resources PLCPan African Resources PLC
Chief Executive OfficerFinancial Director
Office: + 27 (0)11 243 2900Office: + 27 (0) 11 243 2900

Phil DexterJohn Prior / Paul Gillam / James Black
St James's Corporate Services LimitedNumis Securities Limited
Company SecretaryNominated Adviser & Joint Broker
Office: + 44 (0)207 796 8644Office: +44 (0)207 260 1000

Sholto SimpsonMatthew Armitt / Ross Allister
One CapitalPeel Hunt LLP
JSE SponsorJoint Broker
Office: + 27 (0)11 550 5009Office: +44 (0)020 7418 8900

Jeffrey Couch / Neil Haycock / Thomas RiderBMO Capital Markets LimitedJoint Broker

Office: +44 (0)20 7236 1010

Julian GwillimDaniel Thöle
Aprio Strategic CommunicationsBell Pottinger PR
Public & Investor Relations SAPublic & Investor Relations UK
Office: +27 (0)11 880 0037Office: + 44 (0)203 772 2500

www.panafricanresources.com

Date   Source Headline
14th Feb 20247:00 amPRNUnaudited Interim financial results for the six months ended 31 december 2023
2nd Feb 20247:00 amPRNTrading Statement
29th Jan 20243:45 pmPRNHolding(s) in Company
22nd Jan 20247:00 amPRNOperational Update for the Half Year ended 31 December 2023 (H1 FY2024)
7th Dec 202310:00 amPRNHolding(s) in Company
24th Nov 20237:00 amPRNResult of AGM & Salient Dividend Dates
22nd Nov 20237:00 amPRNInterim Production Update for half year ending 31 December 2023
10th Nov 202312:15 pmPRNDirector/PDMR Shareholding
10th Nov 202312:15 pmPRNDirector/PDMR Shareholding
8th Nov 20232:45 pmPRNDirector/PDMR Shareholding
7th Nov 20231:30 pmPRNDirector/PDMR Shareholding
31st Oct 20237:00 amPRNNotice of AGM & Abridged Annual Financial Statements for the year ended 30 June 2023
30th Oct 20232:00 pmPRNDirector/PDMR Shareholding
30th Oct 20232:00 pmPRNDirector/PDMR Shareholding
13th Sep 20237:00 amPRNProvisional summarised audited results for the year ended 30 June 2023
5th Sep 202311:45 amPRNHolding(s) in Company
1st Sep 20237:00 amPRNTrading Statement for the year ended 30 June 2023
7th Aug 20237:00 amPRNOperational Update for the year ended 30 June 2023
1st Aug 20239:10 amPRNUpdate to Commissioning Date of the Mintails Project
1st Aug 20237:24 amPRNMintails Project Funding Closed and Granting of Integrated Environmental Authorisation
1st Jun 20227:00 amPRNAppointment of Berenberg as Joint Broker
12th Apr 20227:00 amPRNTransaction in Own Shares
11th Apr 20227:00 amPRNHolding(s) in Company
7th Apr 20227:00 amPRNTransaction in Own Shares
4th Apr 20227:07 amPRNTransaction in Own Shares
1st Apr 20227:00 amPRNShare Buyback Programme
14th Mar 20227:00 amPRNGold Exploration Programme in Sudan
7th Mar 20229:30 amPRNHolding(s) in Company
7th Mar 20227:00 amPRNHolding(s) in Company
2nd Mar 20227:00 amPRNHolding(s) in Company
16th Feb 20227:00 amPRNUnaudited Interim Results for 6m to 31 Dec 2021
19th Jan 20227:00 amPRNOperational Update - 31 Dec 2021
17th Jan 202212:45 pmPRNHolding(s) in Company
31st Dec 202112:41 pmRNSSecond Price Monitoring Extn
31st Dec 202112:35 pmRNSPrice Monitoring Extension
15th Dec 20217:00 amPRNAcquisition: Blyvoor Gold Surface Tailings
6th Dec 20219:00 amPRNSecondary Listing on A2X Markets
3rd Dec 20217:00 amPRNRetraction of TR-1 Form
1st Dec 20217:00 amPRNHolding(s) in Company
30th Nov 20217:00 amPRNNew Revolving Credit Facility Becomes Effective
26th Nov 20217:00 amPRNResult of AGM and Salient Dividend Dates
29th Oct 20217:01 amEQSPan African Resources (PAF): Everything falling into place
27th Oct 20218:30 amPRNNotice of AGM & No Change Statement
1st Oct 20211:30 pmPRNDirector/PDMR Shareholding
22nd Sep 20211:00 pmPRNDirector/PDMR Shareholding
21st Sep 20217:00 amPRNDirectorate Change
20th Sep 20212:30 pmPRNCOO Seriously Injured
16th Sep 20211:00 pmPRNDirector/PDMR Shareholding
15th Sep 202112:00 pmPRNDirector/PDMR Shareholding
15th Sep 20217:00 amRNSProvisional summarised audited year end results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.