Less Ads, More Data, More Tools Register for FREE

Pin to quick picksOriole Resources Regulatory News (ORR)

Share Price Information for Oriole Resources (ORR)

Share Price is delayed by 15 minutes
Get Live Data
0.365    -0.005 (-1.35%)
Bid:
0.35
Ask:
0.38
Spread: 0.03 (8.571%)
Market Cap: £17.78m
ORR Live PriceLast checked at - London Stock Exchange

Intraday Oriole Resources Share Chart

Thani Stratex Drilling Update

19 Apr 2018 07:00

RNS Number : 3956L
Stratex International PLC
19 April 2018
 

19 April 2018

 

Stratex International Plc

 

('Stratex' or 'the Company')

 

Thani Stratex Announces Excellent Final Drill results for Djibouti

 

Stratex, the AIM-quoted gold-focused exploration and development company in Turkey and Africa, reports that Thani Stratex Resources Ltd ("TSR"), in which the Company holds a 30.4% interest, has today announced final results for its Phase 2 drilling programme at the Pandora gold project in Djibouti. These drilling results include one outstanding (>30 g/t Au) intersection on the previously untested Pyrrha vein.

Highlights

 

· Phase 2 diamond drilling completed for 3,036.50m in 18 holes;

 

· The best drill results include1:

o 8.30m @ 7.21 g/t Au from 144.55m, including 0.80m @ 26.10 g/t Au (Ok-D-25);

o 10.00m @ 1.20 g/t Au from 130.00m including 5.85m @ 1.90 g/t Au (Ok-D-29);

o 35.07m @ 1.28 g/t Au from 109.55m including 9.80m @ 3.06 g/t Au and 2.40m @ 1.75 g/t Au (Ok-D-31);

o 1.10m @ 5.10 g/t Au from 42.00m including 0.50 m @ 9.91 g/t Au, and 1.22m @ 55.40 g/t Au from 50.38m (Ok-D-32);

o 3.54m @ 2.35 g/t Au from 100.46m (Ok-D-33).

 

Tim Livesey, CEO of Stratex, commented:

"It's great to see that the latest results from the current drilling phase at the Pandora Gold Project are continuing to show promising intersects. It is clear that the Djibouti team's understanding of the geology in the area is increasing with every hole, as is the potential scale of the district.

 

We look forward to reviewing the project with TSR in detail over the coming months."

 

 

Further Details

 

At the Pandora epithermal gold project in Djibouti, TSR (50%-owner) has completed Phase 2 drilling for a total 3,036.50m in 18 holes. As reported previously (Announcement dated 1 February 2018), the aim of this drilling was to test the depth-extension of previously drilled mineralisation and identify potential higher-grade ore shoots within the system that is believed could lead to the definition of a resource.

 

TSR has today announced results reported in accordance with the JORC code, from the remaining 13 holes in the programme (OK-DD-21 to OK-DD-33) which demonstrates broad zones of multi-gram gold mineralisation towards the NW-end of the main outcropping Pandora vein. These zones also comprises narrower zones of higher-grade mineralisation. Significant intersections, as recalculated by Stratex1, are shown in Table 1.

 

1 Recalculated by Stratex at 0.20 g/t Au cut-off for intervals >1m, with “including” intervals calculated using a 1.00 g/t Au cut-off  

 

Table 1. Significant Intersections from Phase 2 diamond drill holes OK-D-21 to Ok-D-33

 

Hole ID

Dip (°)

From (m)

To (m)

Width (m)*

Average Au Grade (g/t)**

OK-D-21

 

138.15

147.00

8.85

0.28

and

 

150.17

163.70

13.53

0.99

including

 

155.80

157.00

1.20

1.26

Including

 

161.83

163.70

1.87

5.48

and

 

168.00

169.00

1.00

0.22

and

 

171.00

172.00

1.00

0.85

OK-D-22

-45

24.00

25.00

1.00

0.32

and

 

31.40

40.80

9.40

0.31

and

 

50.00

72.00

22.00

0.84

including

 

54.00

55.82

1.82

2.49

including

 

61.57

65.00

3.43

1.69

OK-D-23

-60

54.00

55.00

1.00

0.46

and

 

67.95

69.00

1.05

0.46

and

 

92.54

121.87

29.33

0.54

including

 

126.00

127.00

1.00

0.85

and

 

139.26

140.38

1.12

0.43

OK-D-24

-50

84.30

85.30

1.00

0.34

and

 

89.60

92.19

2.59

0.58

and

 

98.60

100.15

1.55

0.25

and

 

104.70

112.00

7.30

0.39

including

 

108.77

110.00

1.06

1.06

and

 

115.00

116.90

1.90

1.43

and

 

130.65

132.15

1.50

0.27

OK-D-25

-60

121.63

123.14

1.51

0.63

and

 

126.25

140.00

13.75

0.44

and

 

144.55

152.85

8.30

7.21

including

 

148.80

150.20

1.40

17.31

OK-D-26

-60

9.05

10.65

1.60

0.20

and

 

74.00

75.11

1.11

0.51

and

 

77.06

79.00

1.94

0.36

and

 

87.00

88.00

1.00

0.21

and

 

91.00

92.00

1.00

0.22

and

 

97.00

98.00

1.00

0.28

and

 

99.73

101.37

1.64

0.64

and

 

109.00

110.00

1.00

0.29

and

 

151.00

154.63

3.63

1.30

OK-D-27

-45

96.00

97.00

1.00

3.57

OK-D-28

-60

37.55

41.40

3.85

1.01

includes

 

40.10

41.10

1.30

1.23

and

 

58.30

59.80

1.50

0.27

OK-D-29

-60

101.00

102.00

1.00

0.26

and

 

130.00

140.00

10.00

1.20

includes

 

130.48

136.33

5.85

1.90

OK-D-30

-45

9.84

11.50

1.66

0.37

OK-D-31

-45

98.87

104.97

6.10

0.26

and

 

109.55

144.62

35.07

1.28

includes

 

115.00

124.80

9.80

3.06

includes

 

126.32

128.72

2.40

1.75

and

 

149.00

150.00

1.00

0.24

OK-D-32

-50

42.60

43.10

1.10

5.10

and

 

45.15

48.48

3.33

0.25

and

 

50.38

51.60

1.22

55.4

OK-D-33

-45

68.86

70.75

1.89

0.37

and

 

73.72

75.40

1.68

0.41

and

 

100.46

104.00

3.54

2.35

includes

 

101.00

103.55

2.55

3.14

 

* True widths are estimated to be between 42% and 71% of the reported (downhole) intersection lengths.

** 0.20 g/t Au cut-off for intervals >1m, with "including" intervals calculated using a 1.00 g/t Au cut-off

 

Importantly, hole OK-D-32 was drilled to intersect the WNW-oriented Pyrrha vein, which appears to be part of the same structurally-controlled vein system as the Pandora vein, and returned 55.4 g/t Au over 1.22m from approximately 32m below surface (based on -50° drill hole inclination). The Pyrrha vein, though narrow on surface, has been mapped for over 400m and will be an important focus for additional drill testing. However, TSR will undertake preliminary metallurgical test work ahead of the next phase of drilling.

 

In its announcement today, TSR also highlighted that it had received considerable interest from third parties and that it had signed NDA's with a number of these for the project. We await further information in this regard.

 

Further details on the drilling programme at Pandora, including JORC Table 1 disclosure and a drill plan is included TSR's press release dated 18 April 2018, which can be found at http://thanistratex.com/news/. The drill intersections announced in this release using different cut-off grades to those used by TSR, have been compiled for the Company by Claire Bay, a Competent Person as defined in the JORC code, and who takes responsibility for the release of this information.

 

 

** ENDS **

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014. Following the publication of this announcement, this inside information is now considered to be in the public domain.

 

For further information please visit www.stratexinternational.com, @StratexPLC on Twitter, 

or contact:

 

 

Stratex International Plc

Tel: +44 (0)20 830 9650

Tim Livesey / Claire Bay

 

Camarco (IR/PR Contact)

Tel: +44 (0)20 3757 4980

Gordon Poole / Nick Hennis / Monique Perks

 

Grant Thornton UK LLP

Tel: +44 (0)20 7383 5100

Samantha Harrison

Hannam & Partners

Tel: +44 (0)20 7907 8500

Neil Passmore / Andrew Chubb

 

 

 

 

Notes to Editors:

 

Since listing in 2006, Stratex has discovered more than 2.2 million ounces of gold and 7.09 million ounces of silver, as well as 186,000 tonnes of copper. The Company owns an exciting exploration project in Senegal and 14.87% of a copper-gold project at feasibility stage in Turkey, which will likely default to a 1.2% (post-Turkish tax) royalty position within the next 3 months. The Company also has significant interests in Thani Stratex Resources Ltd and Tembo Gold Corp. for their exploration projects in Djibouti and Egypt, and Tanzania respectively. The Company is currently pursuing value-accretive opportunities within its existing portfolio as well as identifying new value-appropriate projects in Africa and Europe.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLFFFLSLITLIT
Date   Source Headline
20th Sep 20219:34 amRNSOversubscribed Placing to Raise £1.75 million
17th Sep 20212:06 pmRNSSecond Price Monitoring Extn
17th Sep 20212:00 pmRNSPrice Monitoring Extension
17th Sep 20217:00 amRNSDrilling results from Faré and Madina Bafé
13th Sep 20217:00 amRNSPhase 2 Drilling Programme to Commence at Bibemi
9th Sep 20217:00 amRNSRelease of Research Report on the Company
26th Aug 202112:12 pmRNSDirector Dealing
25th Aug 20217:00 amRNSInterim Results for the period ended 30 June 2021
23rd Aug 202110:00 amRNSInvestor Video
23rd Aug 20217:00 amRNSMaiden Inferred Gold Resource for Faré South
19th Aug 20217:00 amRNSCameroon Central Licence Package Sampling Results
18th Aug 20217:00 amRNSSenala Joint Venture Update
16th Aug 20217:00 amRNSSenala Joint Venture Update
10th Aug 202110:00 amRNSInvestor Video – Growing the Company
6th Aug 20219:00 amRNSUpdated Corporate Presentation
2nd Aug 202110:00 amRNSInvestor Video
2nd Aug 20217:00 amRNSCentral Cameroon Exploration Update
29th Jul 20217:00 amRNSSenala Joint Venture Update
22nd Jul 20219:00 amRNSPrice Monitoring Extension
12th Jul 20217:00 amRNSDirector Appointment
1st Jul 20217:00 amRNSThani Stratex Djibouti Exploration Update
30th Jun 20214:56 pmRNSTotal Voting Rights
29th Jun 20217:00 amRNSDrilling Confirms Gold at All Four Prospects
23rd Jun 202112:00 pmRNSResult of Annual General Meeting
16th Jun 20217:00 amRNSAnnual General Meeting Arrangements
14th Jun 202112:59 pmRNSR&D Rebate from HMRC Delivers £46k
14th Jun 20217:00 amRNSBibemi Delivers High-Grade Intersections
10th Jun 20217:00 amRNSExercise of Warrants and Total Voting Rights
9th Jun 20217:00 amRNSPre-AGM Presentation and Q&A
25th May 202112:49 pmRNSUpdated Corporate Presentation
14th May 20214:41 pmRNSSecond Price Monitoring Extn
14th May 20214:35 pmRNSPrice Monitoring Extension
14th May 20212:06 pmRNSSecond Price Monitoring Extn
14th May 20212:00 pmRNSPrice Monitoring Extension
12th May 20217:00 amRNSYear 4 Drilling Programmes Underway at Faré
10th May 20217:00 amRNSBibemi Gold Project Update
30th Apr 20217:01 amRNSPosting of Annual Report and Notice of AGM
30th Apr 20217:00 amRNSTotal Voting Rights
23rd Apr 20217:00 amRNSExercise of Options and Total Voting Rights
12th Apr 20212:24 pmRNSDrilling Confirms Visible Gold at Lawa Prospects
9th Apr 202111:11 amRNSDirector Dealing
9th Apr 20217:00 amRNSExercise of Warrants and Total Voting Rights
6th Apr 20217:00 amRNSAcquisition of 51% of RMC Sarl
1st Apr 20217:00 amRNSTotal Voting Rights
31st Mar 202112:56 pmRNSProof of Concept Confirmed at Bibemi Gold Project
24th Mar 20211:00 pmRNSInvestor Event – Final Results Q&A
24th Mar 20217:00 amRNSFinal Results and Notice of AGM
23rd Mar 20217:01 amRNSSenala Joint Venture Update
23rd Mar 20217:00 amRNSThani Stratex Djibouti Exploration Update
22nd Mar 20217:01 amRNSBibemi Maiden Drilling Programme Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.