Less Ads, More Data, More Tools Register for FREE

Pin to quick picksOriole Resources Regulatory News (ORR)

Share Price Information for Oriole Resources (ORR)

Share Price is delayed by 15 minutes
Get Live Data
0.365    0.00 (0.00%)
Bid:
0.35
Ask:
0.38
Spread: 0.03 (8.571%)
Market Cap: £17.78m
ORR Live PriceLast checked at - London Stock Exchange

Intraday Oriole Resources Share Chart

Thani Stratex Drilling Update

19 Apr 2018 07:00

RNS Number : 3956L
Stratex International PLC
19 April 2018
 

19 April 2018

 

Stratex International Plc

 

('Stratex' or 'the Company')

 

Thani Stratex Announces Excellent Final Drill results for Djibouti

 

Stratex, the AIM-quoted gold-focused exploration and development company in Turkey and Africa, reports that Thani Stratex Resources Ltd ("TSR"), in which the Company holds a 30.4% interest, has today announced final results for its Phase 2 drilling programme at the Pandora gold project in Djibouti. These drilling results include one outstanding (>30 g/t Au) intersection on the previously untested Pyrrha vein.

Highlights

 

· Phase 2 diamond drilling completed for 3,036.50m in 18 holes;

 

· The best drill results include1:

o 8.30m @ 7.21 g/t Au from 144.55m, including 0.80m @ 26.10 g/t Au (Ok-D-25);

o 10.00m @ 1.20 g/t Au from 130.00m including 5.85m @ 1.90 g/t Au (Ok-D-29);

o 35.07m @ 1.28 g/t Au from 109.55m including 9.80m @ 3.06 g/t Au and 2.40m @ 1.75 g/t Au (Ok-D-31);

o 1.10m @ 5.10 g/t Au from 42.00m including 0.50 m @ 9.91 g/t Au, and 1.22m @ 55.40 g/t Au from 50.38m (Ok-D-32);

o 3.54m @ 2.35 g/t Au from 100.46m (Ok-D-33).

 

Tim Livesey, CEO of Stratex, commented:

"It's great to see that the latest results from the current drilling phase at the Pandora Gold Project are continuing to show promising intersects. It is clear that the Djibouti team's understanding of the geology in the area is increasing with every hole, as is the potential scale of the district.

 

We look forward to reviewing the project with TSR in detail over the coming months."

 

 

Further Details

 

At the Pandora epithermal gold project in Djibouti, TSR (50%-owner) has completed Phase 2 drilling for a total 3,036.50m in 18 holes. As reported previously (Announcement dated 1 February 2018), the aim of this drilling was to test the depth-extension of previously drilled mineralisation and identify potential higher-grade ore shoots within the system that is believed could lead to the definition of a resource.

 

TSR has today announced results reported in accordance with the JORC code, from the remaining 13 holes in the programme (OK-DD-21 to OK-DD-33) which demonstrates broad zones of multi-gram gold mineralisation towards the NW-end of the main outcropping Pandora vein. These zones also comprises narrower zones of higher-grade mineralisation. Significant intersections, as recalculated by Stratex1, are shown in Table 1.

 

1 Recalculated by Stratex at 0.20 g/t Au cut-off for intervals >1m, with “including” intervals calculated using a 1.00 g/t Au cut-off  

 

Table 1. Significant Intersections from Phase 2 diamond drill holes OK-D-21 to Ok-D-33

 

Hole ID

Dip (°)

From (m)

To (m)

Width (m)*

Average Au Grade (g/t)**

OK-D-21

 

138.15

147.00

8.85

0.28

and

 

150.17

163.70

13.53

0.99

including

 

155.80

157.00

1.20

1.26

Including

 

161.83

163.70

1.87

5.48

and

 

168.00

169.00

1.00

0.22

and

 

171.00

172.00

1.00

0.85

OK-D-22

-45

24.00

25.00

1.00

0.32

and

 

31.40

40.80

9.40

0.31

and

 

50.00

72.00

22.00

0.84

including

 

54.00

55.82

1.82

2.49

including

 

61.57

65.00

3.43

1.69

OK-D-23

-60

54.00

55.00

1.00

0.46

and

 

67.95

69.00

1.05

0.46

and

 

92.54

121.87

29.33

0.54

including

 

126.00

127.00

1.00

0.85

and

 

139.26

140.38

1.12

0.43

OK-D-24

-50

84.30

85.30

1.00

0.34

and

 

89.60

92.19

2.59

0.58

and

 

98.60

100.15

1.55

0.25

and

 

104.70

112.00

7.30

0.39

including

 

108.77

110.00

1.06

1.06

and

 

115.00

116.90

1.90

1.43

and

 

130.65

132.15

1.50

0.27

OK-D-25

-60

121.63

123.14

1.51

0.63

and

 

126.25

140.00

13.75

0.44

and

 

144.55

152.85

8.30

7.21

including

 

148.80

150.20

1.40

17.31

OK-D-26

-60

9.05

10.65

1.60

0.20

and

 

74.00

75.11

1.11

0.51

and

 

77.06

79.00

1.94

0.36

and

 

87.00

88.00

1.00

0.21

and

 

91.00

92.00

1.00

0.22

and

 

97.00

98.00

1.00

0.28

and

 

99.73

101.37

1.64

0.64

and

 

109.00

110.00

1.00

0.29

and

 

151.00

154.63

3.63

1.30

OK-D-27

-45

96.00

97.00

1.00

3.57

OK-D-28

-60

37.55

41.40

3.85

1.01

includes

 

40.10

41.10

1.30

1.23

and

 

58.30

59.80

1.50

0.27

OK-D-29

-60

101.00

102.00

1.00

0.26

and

 

130.00

140.00

10.00

1.20

includes

 

130.48

136.33

5.85

1.90

OK-D-30

-45

9.84

11.50

1.66

0.37

OK-D-31

-45

98.87

104.97

6.10

0.26

and

 

109.55

144.62

35.07

1.28

includes

 

115.00

124.80

9.80

3.06

includes

 

126.32

128.72

2.40

1.75

and

 

149.00

150.00

1.00

0.24

OK-D-32

-50

42.60

43.10

1.10

5.10

and

 

45.15

48.48

3.33

0.25

and

 

50.38

51.60

1.22

55.4

OK-D-33

-45

68.86

70.75

1.89

0.37

and

 

73.72

75.40

1.68

0.41

and

 

100.46

104.00

3.54

2.35

includes

 

101.00

103.55

2.55

3.14

 

* True widths are estimated to be between 42% and 71% of the reported (downhole) intersection lengths.

** 0.20 g/t Au cut-off for intervals >1m, with "including" intervals calculated using a 1.00 g/t Au cut-off

 

Importantly, hole OK-D-32 was drilled to intersect the WNW-oriented Pyrrha vein, which appears to be part of the same structurally-controlled vein system as the Pandora vein, and returned 55.4 g/t Au over 1.22m from approximately 32m below surface (based on -50° drill hole inclination). The Pyrrha vein, though narrow on surface, has been mapped for over 400m and will be an important focus for additional drill testing. However, TSR will undertake preliminary metallurgical test work ahead of the next phase of drilling.

 

In its announcement today, TSR also highlighted that it had received considerable interest from third parties and that it had signed NDA's with a number of these for the project. We await further information in this regard.

 

Further details on the drilling programme at Pandora, including JORC Table 1 disclosure and a drill plan is included TSR's press release dated 18 April 2018, which can be found at http://thanistratex.com/news/. The drill intersections announced in this release using different cut-off grades to those used by TSR, have been compiled for the Company by Claire Bay, a Competent Person as defined in the JORC code, and who takes responsibility for the release of this information.

 

 

** ENDS **

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014. Following the publication of this announcement, this inside information is now considered to be in the public domain.

 

For further information please visit www.stratexinternational.com, @StratexPLC on Twitter, 

or contact:

 

 

Stratex International Plc

Tel: +44 (0)20 830 9650

Tim Livesey / Claire Bay

 

Camarco (IR/PR Contact)

Tel: +44 (0)20 3757 4980

Gordon Poole / Nick Hennis / Monique Perks

 

Grant Thornton UK LLP

Tel: +44 (0)20 7383 5100

Samantha Harrison

Hannam & Partners

Tel: +44 (0)20 7907 8500

Neil Passmore / Andrew Chubb

 

 

 

 

Notes to Editors:

 

Since listing in 2006, Stratex has discovered more than 2.2 million ounces of gold and 7.09 million ounces of silver, as well as 186,000 tonnes of copper. The Company owns an exciting exploration project in Senegal and 14.87% of a copper-gold project at feasibility stage in Turkey, which will likely default to a 1.2% (post-Turkish tax) royalty position within the next 3 months. The Company also has significant interests in Thani Stratex Resources Ltd and Tembo Gold Corp. for their exploration projects in Djibouti and Egypt, and Tanzania respectively. The Company is currently pursuing value-accretive opportunities within its existing portfolio as well as identifying new value-appropriate projects in Africa and Europe.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLFFFLSLITLIT
Date   Source Headline
25th Sep 20257:00 amRNS-RInvestor Presentation – Reminder
23rd Sep 20257:00 amRNSInterim Results
22nd Sep 20257:00 amRNSStrong Final Drilling Results for Mbe
11th Sep 20257:00 amRNS-RInvitation to Investor Presentation
8th Sep 20257:01 amRNS-RGreenwood Initiation Research Report
8th Sep 20257:00 amRNSExercise of Warrants and Total Voting Rights
2nd Sep 20257:01 amRNSPhase 1 Drilling Completed at Mbe
2nd Sep 20257:00 amRNSExercise of Warrants and Total Voting Rights
26th Aug 20257:00 amRNSBonanza Gold Finds Extend Mbe Mineral System
12th Aug 20257:00 amRNSHolding(s) in Company
22nd Jul 20257:00 amRNSConfirmed Extension of Mbe Sub-Surface Gold System
10th Jul 202510:45 amRNSDirectors’ Share Dealings
9th Jul 20257:00 amRNSMaiden JORC Exploration Target for Mbe
4th Jul 20257:00 amRNSExtension of Warrant Expiry Date
25th Jun 20251:48 pmRNSResult of AGM
25th Jun 20257:00 amRNS-RBibemi ESIA and ELA Progress Update
24th Jun 20257:00 amRNSFurther Gold Results and Exploration Target at Mbe
19th Jun 20257:00 amRNSSenala Gold Project Exploration Target Update
12th Jun 20257:00 amRNSMbe - further significant gold mineralisation
11th Jun 20257:00 amRNSMbe drilling - over 40 further gold intersections
9th Jun 20257:00 amRNSAppointment of Nominated Adviser and Broker
27th May 20253:24 pmRNSHolding(s) in Company
19th May 20257:00 amRNSMbe Drilling Confirms Higher-Grade Gold Potential
16th May 20252:48 pmRNSChange of Registered Office
15th May 20257:00 amRNSBibemi Gold Increased Mineral Resource Estimate
14th May 20255:05 pmRNSPosting of Annual Report and Notice of AGM
13th May 20257:00 amRNS-RGreenwood Capital Partners Research Appointment
12th May 20257:00 amRNSExcellent Gold Intersection at Mbe Gold Project
15th Apr 20258:00 amRNS-RInvestor Presentation
15th Apr 20257:00 amRNSMbe Project Delivers Further Gold Mineralisation
4th Apr 20257:00 amRNS-RInvestor Presentation and Q&A
3rd Apr 20252:57 pmRNSHolding(s) in Company
2nd Apr 20257:00 amRNSFinal Results and Notice of AGM
24th Mar 20257:00 amRNSAssaying Method Review for the Mbe Gold Project
17th Mar 20257:00 amRNSFinal Results from Phase 5 Drilling at Bibemi
5th Mar 20257:00 amRNSFurther Results from Mbe Maiden Drilling Programme
28th Feb 20252:21 pmRNSUpdate on Drilling Results at Mbe Gold Project
13th Feb 20257:00 amRNSPhase 5 Drilling Completed at Bibemi Gold Project
11th Feb 20257:00 amRNSDirectors’ Share Dealings
3rd Feb 20257:05 amRNSEncouraging Results from Discovery Hole at Mbe
3rd Feb 20257:00 amRNSDrilling Update for the Bibemi Gold Project
29th Jan 20257:00 amRNSLicence Renewal for Wapouzé Limestone Property
14th Jan 20257:00 amRNSCorporate Update and Latest Results from Bibemi
19th Dec 20246:12 pmRNSHolding(s) in Company
16th Dec 20247:00 amRNSUpdate on Maiden Drilling Programme at Mbe
28th Nov 20247:00 amRNSBibemi Phase 5 Drilling Programme Update
19th Nov 20247:00 amRNSMaiden Drilling Programme Commences at Mbe
13th Nov 202412:45 pmRNSDirectors Dealings
13th Nov 20247:00 amRNSIssue of Share Options & Directors Dealings
12th Nov 20247:00 amRNSMbe Exploration Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.