Less Ads, More Data, More Tools Register for FREE

Pin to quick picksOracle Power Regulatory News (ORCP)

Share Price Information for Oracle Power (ORCP)

Share Price is delayed by 15 minutes
Get Live Data
0.0575    -0.0025 (-4.17%)
Bid:
0.055
Ask:
0.06
Spread: 0.005 (9.091%)
Market Cap: £9.04m
ORCP Live PriceLast checked at - London Stock Exchange

Intraday Oracle Power Share Chart

Grid Study for Renewable Power Plant

7 May 2024 07:00

RNS Number : 3505N
Oracle Power PLC
07 May 2024
 

7 May 2024

Oracle Power PLC

("Oracle" or the "Company")

 

Commencement of Transmission and Grid Interconnection Study for Renewable Power Plant

 

Oracle Power PLC (AIM: ORCP), an international project developer, together with its joint venture company, Oracle Energy Limited ("Oracle Energy"), a developer of green energy projects, is pleased to announce the commencement of the Grid Interconnection Study (the "Study") for its proposed 1.3GW renewable power plant in Jhimpir, Sindh Province, Pakistan (the "Power Plant"). Oracle Energy, in collaboration with its joint development partner, China Electric Power Equipment and Technology Co., Ltd. ("CET"), a subsidiary of State Grid Corporation of China ("State Grid China"), has engaged Power Planners International (Pvt.) Ltd ("PPI"), a distinguished company renowned for its expertise in power system analysis and planning, particularly in the domain of grid interconnection studies for renewable energy projects, to undertake the Study.

 

The Study, paid for by State Grid China, encompasses a comprehensive evaluation for 1.3GW of renewable power, including an 800MW solar project, a 500MW wind project, and a suitable battery energy storage system. The Power Plant aims to export the generated renewable power to the National Grid, with connection facilitated through the Network of National Transmission & Dispatch Company (NTDC). Power evacuation would be facilitated through the existing 220kV Jhimpir-II Grid station or any other grid interconnection scheme identified in collaboration with NTDC, factoring in the latest load forecast and NTDC's future transmission plans.

 

The Study is expected to culminate in the finalisation of the grid interconnection scheme, determining voltage levels, step-up transformer specifications, interconnecting distribution lines, and necessary extensions or reinforcements to the nearby system network. This comprehensive analysis reinforces Oracle's commitment to ensuring reliable power dispersal and maximizing the project's impact on the national energy grid.

 

 CEO of Oracle, Naheed Memon, commented"We are delighted to announce the initiation of the Interconnection Study for our renewable power plant in Jhimpir. This Study will complete our feasibility study package for the Power Plant and will be instrumental in propelling us into the FEED stage. Additionally, it will help to lay the groundwork for future confirmation of potential off-take and financing arrangements. Through strategic partnerships and meticulous planning, we aim to optimize the integration of renewable energy sources into the national grid, contributing to the country's energy security and environmental sustainability."

 

*ENDS*

 

For further information on Oracle Power PLC, visit the Company's website at http://www.oraclepower.co.uk or contact:

 

Oracle Power PLC

Naheed Memon - CEO +44 (0) 203 580 4314

 

Strand Hanson Limited (Nominated Adviser & Joint Broker)

Rory Murphy, Matthew Chandler, Rob Patrick +44 (0) 20 7409 3494

Global Investment Strategy UK Limited (Joint Broker)

Samantha Esqulant +44 (0) 20 7048 9432

 

St Brides Partners Limited (Financial PR)

Susie Geliher, Isabel de Salis +44 (0) 20 7236 1177

 

 

About PPI

Power Planners International (Pvt.) Ltd is a reputable entity, registered with the Pakistan Engineering Council and accredited with registrations in England and Wales, Saudi Electricity Company (SEC), and the Alternative Energy Development Board. PPI is a group of professionals who possess highly specialized skills, vast and profound experience, and expertise of the advanced and latest state of the art software prevailing in the contemporary power system industry. Having long background of power system analysis and planning in WAPDA and other electric utilities, they fully understand the scope of the required study and are capable of delivering it efficiently and promptly.

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCQKABBDBKBQPK
Date   Source Headline
7th May 20247:00 amRNSGrid Study for Renewable Power Plant
25th Apr 20247:00 amRNS1.3GW renewable power plant ESIA report submitted
17th Apr 20247:00 amRNSESIA Report Completed
16th Apr 20247:00 amRNSQ1 2024 Update and Shareholder Q&A
11th Apr 20247:00 amRNSCompletion of Geotechnical Study & ER Survey
9th Apr 20247:00 amRNSOption to Acquire Copper & Silver Project
27th Feb 20247:00 amRNSGeotechnical & Electrical Resistivity Survey
19th Feb 20247:00 amRNSESIA Study: Renewable Power Production Facility
6th Feb 20247:00 amRNSCompleted FS for Green Hydrogen & Ammonia Project
29th Jan 20247:00 amRNSNorthern Zone Project POW Approved
15th Jan 20247:00 amRNSQ4 Update and Shareholder Q&A
11th Jan 20247:00 amRNSNorthern Zone Project Development Update
12th Dec 20237:00 amRNS+100m Wide Gold Intercepts at Northern Zone
22nd Nov 202311:16 amRNSHolding(s) in Company
1st Nov 20235:16 pmRNSHolding(s) in Company
23rd Oct 20231:46 pmRNSResult of GM & Completion Capital Reorganisation
20th Oct 20237:00 amRNSQ3 Update and Shareholder Q&A
10th Oct 20237:00 amRNSNew Corporate Presentation
5th Oct 20233:33 pmRNSPosting of Notice of General Meeting
4th Oct 20237:00 amRNSPlacing, Capital Reorganisation and Notice of GM
25th Sep 20237:00 amRNSInterim Results for the 6 months to 30 June 2023
12th Sep 20237:00 amRNSCompletion of Green Hydrogen Feasibility Study
21st Aug 20237:00 amRNSNorthern Zone: Completion of Diamond Drilling
28th Jul 20237:00 amRNSQ2 Update and Shareholder Q&A Session
26th Jul 20233:05 pmRNSResults of AGM
18th Jul 20237:00 amRNSGreen Hydrogen Project Topography Survey Completed
29th Jun 20237:00 amRNSAudited Results for the year ended 31 Dec 2022
26th Jun 20237:00 amRNSMoU with Global Green Growth Institute
22nd Jun 20237:00 amRNS£363,000 Fundraising & Appointment of Joint Broker
5th Jun 20237:00 amRNSOfftake MoU with PetroChina for Green Hydrogen
30th May 20237:00 amRNSUpdate on Green Hydrogen Project Development
16th May 20237:00 amRNSMOU for 1.32 GW coal power plant – Thar Block VI
9th May 20237:00 amRNSFarm-out of Northern Zone Gold Project
27th Apr 20237:00 amRNSQ1 Update and Corporate Strategy
19th Apr 20237:00 amRNSCo-operation with PowerChina for 1GW Solar Project
17th Apr 20233:42 pmRNSDirector Share Purchase Plan Update
20th Mar 20237:00 amRNSAward and Registration of Land Lease
14th Mar 20237:00 amRNSOracle Energy Signs MoU on Fuel Cell Development
7th Mar 20239:00 amRNSPrice Monitoring Extension
7th Mar 20237:00 amRNSDirector Share Purchases
7th Mar 20237:00 amRNSStrategic MoU for Green Hydrogen Project with CET
24th Feb 20237:00 amRNSOracle Power joins Dii Desert Energy Organization
9th Feb 20237:00 amRNSDirector Share Purchases
6th Feb 20232:05 pmRNSSecond Price Monitoring Extn
6th Feb 20232:00 pmRNSPrice Monitoring Extension
6th Feb 20237:00 amRNSGreen Hydrogen Project Offtake MoU
6th Feb 20237:00 amRNS£500,000 placing to support Green Hydrogen Project
31st Jan 20237:00 amRNSQ4 Update and Shareholder Q&A Session
17th Jan 20237:00 amRNSDirector Share Purchases
13th Jan 20234:46 pmRNSFormer Director’s Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.