We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksOracle Power Regulatory News (ORCP)

Share Price Information for Oracle Power (ORCP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.032
Bid: 0.03
Ask: 0.034
Change: 0.0068 (26.98%)
Spread: 0.004 (13.333%)
Open: 0.0275
High: 0.0325
Low: 0.0275
Prev. Close: 0.0252
ORCP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Geotechnical & Electrical Resistivity Survey

27 Feb 2024 07:00

RNS Number : 4992E
Oracle Power PLC
27 February 2024
 

27 February 2024

Oracle Power PLC 

("Oracle" or the "Company") 

 

Commencement of Geotechnical Study & Electrical Resistivity Survey for Renewable Power Production Facility

? 

Oracle Power PLC (AIM: ORCP), an international project developer, together with its joint venture company, Oracle Energy Limited ("Oracle Energy"), a developer of green energy projects, are pleased to announce commencement of the requisite Geotechnical Study and Electrical Resistivity Survey (ERS) in respect of the planned Renewable Power plant on the project site in Jhimpir, in the Sindh Province of Pakistan.  Oracle Energy has appointed F&M (Pvt.) Limited ("F&M"), a reputable provider of engineering, testing, and verification services, to conduct the Geotechnical Study and ERS.

 

The Geotechnical Study will encompass soil investigation and deploy rotary drilling to obtain disturbed and undisturbed samples, as well as core drilling to assess rock formations on the site. The study will record rock quality designations and core recovery values. Field tests will include a standard penetration test and a cone penetration test followed by thorough laboratory testing. A comprehensive engineering report will be delivered, encompassing the field and laboratory data, soil and rock stratigraphy, bearing capacity, settlement and recommendations.

 

The Electrical Resistivity Survey will determine lithology, porosity and permeability from boreholes drilled. By determining these conditions through ERS technology, developers can seek to optimise site planning and infrastructure design to account for subsurface conditions. Furthermore, the resistivity survey report will serve to inform water management strategies, flood risk assessment and environmental impact mitigation. The integrated approach of parallel soil investigation and an ERS will provide vital data and valuable insights for informed decision-making in the engineering, design and construction planning phase of the project. 

 

Naheed Memon, CEO of Oracle, commented:

"The commencement of these important studies is testament to our commitment to responsible project development. We remain aligned with national and international standards as we seek to advance relationships with potential investors and lenders and move closer to the Front-End Engineering Design (FEED) phase, thereby solidifying our path towards a comprehensive and sustainable project blueprint. The combined insights from soil investigation and an electrical resistivity survey will ensure the structural integrity and safety of the project and significantly contribute to sustainable development, efficient resource management and environmental stewardship."

 

  

-ENDS-

 

For further information on Oracle Power PLC, visit the Company's website at www.oraclepower.co.uk or contact:

 

Oracle Power PLC

Naheed Memon - CEO +44 (0) 203 580 4314

 

Strand Hanson Limited (Nominated Adviser & Joint Broker)

Rory Murphy, Matthew Chandler, Rob Patrick +44 (0) 20 7409 3494

 

Global Investment Strategy UK Limited (Joint Broker)  +44 (0) 20 7048 9432

Samantha Esqulant

 

St Brides Partners Limited (Financial PR)  +44 (0) 20 7236 1177

Susie Geliher / Isabel de Salis

 

 

About F&M (Pvt.) Ltd

Founded in 2017, F&M Inspections (Pvt.) Ltd. has become a leading provider of engineering, testing, and certification services. Offering NDT, API, building stability assessments, material testing, chemical & water testing, GAP analysis, ISO training, risk assessments, and national/international certification support, their experienced team adheres to international standards while delivering client-centric solutions for industries such as construction, oil & gas and manufacturing. With a commitment to following international codes and standards, quality, and integrity, they assist industries across Pakistan in achieving their goals.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCUNRNRSWUUUAR
Date   Source Headline
25th Apr 20247:00 amRNS1.3GW renewable power plant ESIA report submitted
17th Apr 20247:00 amRNSESIA Report Completed
16th Apr 20247:00 amRNSQ1 2024 Update and Shareholder Q&A
11th Apr 20247:00 amRNSCompletion of Geotechnical Study & ER Survey
9th Apr 20247:00 amRNSOption to Acquire Copper & Silver Project
27th Feb 20247:00 amRNSGeotechnical & Electrical Resistivity Survey
19th Feb 20247:00 amRNSESIA Study: Renewable Power Production Facility
6th Feb 20247:00 amRNSCompleted FS for Green Hydrogen & Ammonia Project
29th Jan 20247:00 amRNSNorthern Zone Project POW Approved
15th Jan 20247:00 amRNSQ4 Update and Shareholder Q&A
11th Jan 20247:00 amRNSNorthern Zone Project Development Update
12th Dec 20237:00 amRNS+100m Wide Gold Intercepts at Northern Zone
22nd Nov 202311:16 amRNSHolding(s) in Company
1st Nov 20235:16 pmRNSHolding(s) in Company
23rd Oct 20231:46 pmRNSResult of GM & Completion Capital Reorganisation
20th Oct 20237:00 amRNSQ3 Update and Shareholder Q&A
10th Oct 20237:00 amRNSNew Corporate Presentation
5th Oct 20233:33 pmRNSPosting of Notice of General Meeting
4th Oct 20237:00 amRNSPlacing, Capital Reorganisation and Notice of GM
25th Sep 20237:00 amRNSInterim Results for the 6 months to 30 June 2023
12th Sep 20237:00 amRNSCompletion of Green Hydrogen Feasibility Study
21st Aug 20237:00 amRNSNorthern Zone: Completion of Diamond Drilling
28th Jul 20237:00 amRNSQ2 Update and Shareholder Q&A Session
26th Jul 20233:05 pmRNSResults of AGM
18th Jul 20237:00 amRNSGreen Hydrogen Project Topography Survey Completed
29th Jun 20237:00 amRNSAudited Results for the year ended 31 Dec 2022
26th Jun 20237:00 amRNSMoU with Global Green Growth Institute
22nd Jun 20237:00 amRNS£363,000 Fundraising & Appointment of Joint Broker
5th Jun 20237:00 amRNSOfftake MoU with PetroChina for Green Hydrogen
30th May 20237:00 amRNSUpdate on Green Hydrogen Project Development
16th May 20237:00 amRNSMOU for 1.32 GW coal power plant – Thar Block VI
9th May 20237:00 amRNSFarm-out of Northern Zone Gold Project
27th Apr 20237:00 amRNSQ1 Update and Corporate Strategy
19th Apr 20237:00 amRNSCo-operation with PowerChina for 1GW Solar Project
17th Apr 20233:42 pmRNSDirector Share Purchase Plan Update
20th Mar 20237:00 amRNSAward and Registration of Land Lease
14th Mar 20237:00 amRNSOracle Energy Signs MoU on Fuel Cell Development
7th Mar 20239:00 amRNSPrice Monitoring Extension
7th Mar 20237:00 amRNSDirector Share Purchases
7th Mar 20237:00 amRNSStrategic MoU for Green Hydrogen Project with CET
24th Feb 20237:00 amRNSOracle Power joins Dii Desert Energy Organization
9th Feb 20237:00 amRNSDirector Share Purchases
6th Feb 20232:05 pmRNSSecond Price Monitoring Extn
6th Feb 20232:00 pmRNSPrice Monitoring Extension
6th Feb 20237:00 amRNS£500,000 placing to support Green Hydrogen Project
6th Feb 20237:00 amRNSGreen Hydrogen Project Offtake MoU
31st Jan 20237:00 amRNSQ4 Update and Shareholder Q&A Session
17th Jan 20237:00 amRNSDirector Share Purchases
13th Jan 20234:46 pmRNSFormer Director’s Shareholding
19th Dec 20227:00 amRNSLand Survey Commences on Green Hydrogen Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.