We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksOracle Power Regulatory News (ORCP)

Share Price Information for Oracle Power (ORCP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.032
Bid: 0.03
Ask: 0.034
Change: 0.0068 (26.98%)
Spread: 0.004 (13.333%)
Open: 0.0275
High: 0.0325
Low: 0.0275
Prev. Close: 0.0252
ORCP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

ESIA Study: Renewable Power Production Facility

19 Feb 2024 07:00

RNS Number : 5211D
Oracle Power PLC
19 February 2024
 

19 February 2024

Oracle Power PLC 

("Oracle" or the "Company") 

 

Commencement of ESIA Study for Renewable Power Production Facility

? 

Oracle Power PLC (AIM: ORCP), an international project developer, together with its joint venture company, Oracle Energy Limited ("Oracle Energy"), a developer of green energy projects, is pleased to announce the commencement of the Environmental & Social Impact Assessment (ESIA) for the Renewable Power plant on its project land site in Jhimpir, in the Sindh Province of Pakistan.  Oracle Energy has appointed SGS Pakistan ("SGS") a leading inspection, verification, testing, and certification company, to conduct the ESIA Study.

 

The ESIA will cover a comprehensive study for 1.3GW of renewable power encompassing a 800MW solar project, a 500MW wind project, and a 450MWh battery energy storage system in accordance with the environmental regulations outlined by Sindh Environmental Protection Agency and based on international guidelines provided by International Finance Corporation, Asian Development Bank, other Development Finance Institutions, and commercial lenders.

 

The ESIA methodology involves collection of baseline primary and secondary environmental data, and determination of sensitivities for prediction and evaluation of impacts. This study will consider the renewable power aspect, with subsequent phases focusing on the chemical and transmission components. SGS will also carry out a comprehensive wildlife survey on the extensive land site.

 

The ESIA report will encompass a review of all applicable environmental national legislations and international guidelines. Furthermore, public consultation and engagement with key stakeholders, assessment of impact on land, land-based infrastructure, local settlements and a rigorous wildlife survey will be completed. A detailed environmental management plan and performance monitoring plan for the construction and operational phase will be prepared. In due course the final ESIA report will be presented to the Sindh Environmental Protection Agency (Sindh EPA), and aligning with Pakistan EPA, a Non-Objection Certificate will be sought.

 

Naheed Memon, CEO of Oracle, commented:

"The commencement of the ESIA Study, in order to obtain clearance from national environmental agency and endorsement from international stakeholders, marks a very important milestone in the development pathway of our green energy project. It also demonstrates our commitment to swift project development as we continue to align and engage with prospective lenders and investors. As a company, we are committed to adhering to the highest environmental and social standards as we advance the development of our green energy project." 

 

 

-ENDS-

 

For further information on Oracle Power PLC, visit the Company's website www.oraclepower.co.uk or contact:

 

Oracle Power PLC

Naheed Memon - CEO +44 (0) 203 580 4314

 

Strand Hanson Limited (Nominated Adviser & Joint Broker)

Rory Murphy, Matthew Chandler, Rob Patrick +44 (0) 20 7409 3494

 

Global Investment Strategy UK Limited (Joint Broker) +44 (0) 20 7048 9432

Samantha Esqulant

 

St Brides Partners Limited (Financial PR) +44 (0) 20 7236 1177

Susie Geliher / Isabel de Salis

 

 

About SGS Pakistan (Pvt.) Ltd

SGS is a global, integrated service provider. It offers access to a comprehensive range of technical capabilities. SGS's professionals have the knowledge and experience to provide full support, operational strength and troubleshoot clients' problems. This is illustrated daily by facilities all over the world. SGS Pakistan is a subsidiary of Société Générale de Surveillance (SGS) with its headquarters in Geneva, Switzerland. The core activities of the SGS Group include consultancy, inspection and monitoring services to diverse industries such as petroleum, construction, agriculture, consumer goods and industrial equipment, as well as to governmental, State and international institutions. These services help to ensure contract compliance and ensure the speed and efficiency of transactions, the safety and reliability of plant and equipment, and the respect of delivery and production schedules.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCFLFLRFVITLIS
Date   Source Headline
25th Apr 20247:00 amRNS1.3GW renewable power plant ESIA report submitted
17th Apr 20247:00 amRNSESIA Report Completed
16th Apr 20247:00 amRNSQ1 2024 Update and Shareholder Q&A
11th Apr 20247:00 amRNSCompletion of Geotechnical Study & ER Survey
9th Apr 20247:00 amRNSOption to Acquire Copper & Silver Project
27th Feb 20247:00 amRNSGeotechnical & Electrical Resistivity Survey
19th Feb 20247:00 amRNSESIA Study: Renewable Power Production Facility
6th Feb 20247:00 amRNSCompleted FS for Green Hydrogen & Ammonia Project
29th Jan 20247:00 amRNSNorthern Zone Project POW Approved
15th Jan 20247:00 amRNSQ4 Update and Shareholder Q&A
11th Jan 20247:00 amRNSNorthern Zone Project Development Update
12th Dec 20237:00 amRNS+100m Wide Gold Intercepts at Northern Zone
22nd Nov 202311:16 amRNSHolding(s) in Company
1st Nov 20235:16 pmRNSHolding(s) in Company
23rd Oct 20231:46 pmRNSResult of GM & Completion Capital Reorganisation
20th Oct 20237:00 amRNSQ3 Update and Shareholder Q&A
10th Oct 20237:00 amRNSNew Corporate Presentation
5th Oct 20233:33 pmRNSPosting of Notice of General Meeting
4th Oct 20237:00 amRNSPlacing, Capital Reorganisation and Notice of GM
25th Sep 20237:00 amRNSInterim Results for the 6 months to 30 June 2023
12th Sep 20237:00 amRNSCompletion of Green Hydrogen Feasibility Study
21st Aug 20237:00 amRNSNorthern Zone: Completion of Diamond Drilling
28th Jul 20237:00 amRNSQ2 Update and Shareholder Q&A Session
26th Jul 20233:05 pmRNSResults of AGM
18th Jul 20237:00 amRNSGreen Hydrogen Project Topography Survey Completed
29th Jun 20237:00 amRNSAudited Results for the year ended 31 Dec 2022
26th Jun 20237:00 amRNSMoU with Global Green Growth Institute
22nd Jun 20237:00 amRNS£363,000 Fundraising & Appointment of Joint Broker
5th Jun 20237:00 amRNSOfftake MoU with PetroChina for Green Hydrogen
30th May 20237:00 amRNSUpdate on Green Hydrogen Project Development
16th May 20237:00 amRNSMOU for 1.32 GW coal power plant – Thar Block VI
9th May 20237:00 amRNSFarm-out of Northern Zone Gold Project
27th Apr 20237:00 amRNSQ1 Update and Corporate Strategy
19th Apr 20237:00 amRNSCo-operation with PowerChina for 1GW Solar Project
17th Apr 20233:42 pmRNSDirector Share Purchase Plan Update
20th Mar 20237:00 amRNSAward and Registration of Land Lease
14th Mar 20237:00 amRNSOracle Energy Signs MoU on Fuel Cell Development
7th Mar 20239:00 amRNSPrice Monitoring Extension
7th Mar 20237:00 amRNSDirector Share Purchases
7th Mar 20237:00 amRNSStrategic MoU for Green Hydrogen Project with CET
24th Feb 20237:00 amRNSOracle Power joins Dii Desert Energy Organization
9th Feb 20237:00 amRNSDirector Share Purchases
6th Feb 20232:05 pmRNSSecond Price Monitoring Extn
6th Feb 20232:00 pmRNSPrice Monitoring Extension
6th Feb 20237:00 amRNS£500,000 placing to support Green Hydrogen Project
6th Feb 20237:00 amRNSGreen Hydrogen Project Offtake MoU
31st Jan 20237:00 amRNSQ4 Update and Shareholder Q&A Session
17th Jan 20237:00 amRNSDirector Share Purchases
13th Jan 20234:46 pmRNSFormer Director’s Shareholding
19th Dec 20227:00 amRNSLand Survey Commences on Green Hydrogen Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.