Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksOrosur Mining Regulatory News (OMI)

Share Price Information for Orosur Mining (OMI)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 4.30
Bid: 4.20
Ask: 4.40
Change: 0.10 (2.38%)
Spread: 0.20 (4.762%)
Open: 4.20
High: 4.30
Low: 4.20
Prev. Close: 4.20
OMI Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Filing of NI 43-101 Technical Report on Colombian Anzá Project

10 Jan 2019 15:59

Orosur Mining Inc. (“Orosur” or “the Company”) (TSX: OMI) (AIM: OMI) has filed a technical report prepared by Andes GMS SPA in accordance with National Instrument 43-101 Standards for Mineral Projects ("NI 43-101") on the Anzá gold exploration project (“Anzá”) in Colombia (the "Report"). To view the full report, please visit www.orosur.ca/operations/technical-reports.

Anzá is an advanced exploration project and the Report includes a review of the regional geology, local geology, types and degree of the mineralization, exploration history, metallurgical testing and drilling results and represents an update from the technical report prepared in May 2010 by Bargmann & Platten of Snowden Mining Industry Consultants.

OVERVIEW

Total project area of 105 km² (10,615 hectares) located 50km west of Medellin, Colombia with access via predominantly paved roads with a shorter gravel road leading immediately into the project area. The site has existing infrastructure including water, power, roads and a camp. 100% owned with no option fees or commitments, and includes existing environmental and mining permits relating to two gypsum mines located on the property and mined since 1991 by a thrid party. Located on the eastern side of the Cordillera Occidental of Colombia in the Metallogenic Belt of the Middle Cauca, which mainly hosts two types of gold mineralization: a porphyry style and/or an epithermal type with a strong relationship with the Cauca-Romeral fault zone, which constitutes a suture zone associated with the collision of the Choco Volcanic Arc. The most important gold mining districts of the country are located in this region. Magnetometry, induced polarization, radiometry, soil and rock sampling surveys have all been completed leading to the identification of 5 initial targets within the property: APTA, Charrascala, Guaimarala, Jesuitas and La Cejita. APTA has been drilled and initial drilling has been conducted at Charrascala. Initial metallurgical and rock density test work completed in mid-2016 provided average gold recoveries ranging from 95.9% – 96.1% utilising a combination of gravity concentration, flotation and cyanidation processing, which is comparable to the metallurgical recoveries of the development projects and producing mines in the region. Historic diamond drilling of 17,409m consisting of 53 holes was completed during 2011 to 2012 by Waymar Resources, a company and assets acquired by Orosur in mid-2014. This drilling confirmed that gold and sulphide mineralization are associated with a structurally controlled hydrothermal system (fault and breccia zones). Drilling also identified three units as carriers of gold mineralization: silicified matrix- supported breccia with pyrite / sphalerite / chalcopyrite disseminated in the matrix and veins; fault zones with similar sulphides; and laminated mudstone or tuff cut by quartz-sulphide veins. Notable interscepts from the 2011 to 2012 drill campaign include:
Hole From To Intercept Au Ag Zn
# m m m g/t g/t %
MAP‐11 213.0 219.0 6.0 18.26 1.95 0.35
including 217.5 219.0 1.5 72.30 6.90 0.93
MAP‐20 145.0 186.0 41.0 3.85 1.39 1.25
including 171.3 177.0 5.7 19.84 3.94 1.66
MAP‐21 224.0 242.0 18.0 14.14 2.05 2.83
including 225.0 229.4 4.4 45.62 5.47 10.59
252.0 253.0 1.0 10.85 1.80 0.67
MAP‐29 183.0 194.9 11.9 10.57 2.40 1.61
including 185.0 187.0 2.1 40.25 4.85 4.64
MAP‐33 157.1 179.5 22.4 10.42 1.87 1.56
including 165.0 170.8 5.8 29.49 3.37 2.81
MAP‐36 198.6 227.5 28.9 3.88 1.68 0.43
including 205.5 217.5 12.0 8.83 2.65 0.59
MAP‐38 123.4 124.5 1.1 15.40 3.60 1.94
172.0 212.5 40.5 14.09 3.82 1.95
including 179.5 186.0 6.5 70.99 6.34 0.12
including 184.6 186.0 1.4 176.00 15.20 0.39
including 202.0 205.4 3.4 20.89 9.71 4.75
MAP‐43 65.5 68.6 3.1 7.66 73.04 0.68
167.5 231.5 64.0 1.88 1.88 0.70
including 209.0 214.0 5.0 9.07 3.40 0.70
MAP‐47 105.0 118.3 13.3 2.24 316.25 1.00
including 106.0 110.5 4.5 4.69 768.89 2.34
MAP‐48 181.0 195.7 14.7 40.37 9.30 3.41
including 185.5 195.7 10.2 58.03 13.16 4.85
including 187.6 189.5 1.9 219.00 29.50 6.55
Orosur commenced its own diamond drilling programme in late 2017 Orosur completed 18 diamond drill holes totalling 6,314m at the APTA target, improving and validating the geological model. Drilling extended the mineralized zone a further 95m down dip, to a total depth of 400m. Drilling to date has encountered a number of notable intercepts over 20 g/t Au, including:
Hole From To Intercept Au Ag Zn
# m m m g/t g/t %
MAP_11 217.5 219.0 1.5 72.30 6.90 0.93
MAP_20 172.3 175.5 3.2 22.28 4.55 1.98
Including 172.3 174.0 1.7 32.60 5.50 1.82
MAP_21 225.0 231.6 6.6 35.24 5.00 6.97
Including 226.3 228.0 1.7 61.40 8.20 4.03
Including 228.0 229.4 1.4 51.50 5.10 1.80
MAP_28 220.5 221.7 1.2 29.20 8.10 0.58
MAP_29 185.0 187.0 2.0 40.25 4.85 4.64
Including 186.0 187.0 1.0 54.20 6.00 3.03
MAP_33 166.5 170.8 4.3 37.09 3.99 2.93
Including 167.5 169.0 1.5 79.90 7.70 3.15
MAP_36 213.2 214.5 1.3 23.00 4.40 0.63
MAP_38 179.5 186.0 6.5 70.99 6.34 0.12
Including 181.0 182.5 1.5 99.90 7.50 0.03
Including 184.6 186.0 1.4 176.00 15.20 0.39
202.0 205.4 3.4 20.89 9.71 4.75
Including 203.5 204.5 1.0 28.30 12.50 5.85
MAP_48 187.6 194.0 6.4 91.62 20.28 7.52
Including 187.6 189.5 1.9 219.00 29.50 6.55
Including 190.5 191.5 1.0 89.10 15.20 16.25
MAP_51 201.6 203.3 1.7 37.00 5.40 13.80
303.5 305.0 1.5 22.90 8.40 6.06
MAP_054 145.7 148.9 3.2 24.92 1.40 2.40
Including 145.7 146.7 1.0 37.96 1.30 0.70
MAP_062 237.7 238.50 0.80 25.84 7.40 0.07
MAP_070 183.0 184.0 1.0 23.66 3.60 0.04
257.0 259.0 2.0 22.04 4.65 4.23
Including 257.0 258.0 1.0 28.93 5.30 3.59
As part of this programme 5 holes, comprising 3,045m of diamond drilling, were completed at Charrascala, which tested the strong gold soil geochemical anomalies along an 800m north-south corridor. Drilling results included intersections of 3.43 g/t Au and 30.60 g/t Ag over 1.5m, and 2.62 g/t Au and 14.30 g/t Ag over 0.90m; Exploration Agreement in place with Newmont Mining announced in late 2018.

Qualified Person

The Report has been prepared by or under the supervision of independent geologist Mauricio Rubio (AusIMM), a Qualified Person under NI 43-101.

Andes GMS SPA have conducted a site visit allowing it to audit the Company’s field procedures, sample handling and preparation techniques, analytical procedures, results and Quality Assessment / Quality Control (“QAQC”) systems (check assaying) that it implements. Andes confirms that Orosur has undertaken its exploration programmes using industry best practices.

About Orosur Mining Inc.

Orosur Mining Inc. (TSX: OMI; AIM: OMI) is a precious metals developer and explorer focused on identifying and advancing gold projects in South America. The Company operates in Colombia and Uruguay.

For further information, please contact:

Orosur Mining Inc

Ignacio Salazar, Chief Executive Officer

Ryan Cohen, VP Corporate Development & Interim CFO

info@orosur.ca

Tel: +1 (778) 373-0100

Cantor Fitzgerald Europe – Nomad & Joint Broker

David Porter/Keith Dowsing

Tel: +44 (0) 20 7894 7000

Numis Securities Limited – Joint Broker

John Prior / James Black / Paul Gillam

Tel: +44 (0) 20 7260 1000

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation ("MAR"). Upon the publication of this announcement via Regulatory Information Service, this inside information is now considered to be in the public domain. If you have any queries on this, then please contact Ryan Cohen, VP Corporate Development and Interim CFO of the Company (responsible for arranging release of this announcement on behalf of the Company) on: +1 (778) 373-0100.

View source version on businesswire.com: https://www.businesswire.com/news/home/20190110005487/en/

Copyright Business Wire 2019

Date   Source Headline
21st Dec 20107:00 amBUSOrosur Awards Development Contract to Redpath Following Board Approval for Arenal Deeps in Uruguay
16th Dec 20107:00 amBUSOrosur Mining Inc.: Issue of Ordinary Shares upon Exercise of Stock Options
14th Dec 20107:00 amBUSOrosur Mining Inc. Stock Options Grant
14th Dec 20107:00 amBUSOrosur Mining Inc Announces Appointment of Non Executive Director
2nd Dec 20107:00 amBUSOrosur Mining Inc Announces Continued Positive Drill Results from Follow up Drilling at the Vaca Muerta Project, Uruguay
10th Nov 20101:10 pmBUSOfficer's Dealing
8th Nov 20101:40 pmBUSOrosur Mining Inc. Issue of Ordinary Shares upon Exercise of Stock Options
28th Oct 20107:00 amBUSOrosur Mining Inc. Director's Dealing and Issue of Ordinary Shares upon Exercise of Stock Options
22nd Oct 20107:00 amBUSOrosur Mining Inc. Director's Dealing and Issue of Ordinary Shares upon Exercise of Stock Options
14th Oct 20102:00 pmBUSStock Options Grant
13th Oct 20107:00 amBUSOrosur Mining Inc. Annual and Special Meeting Results
12th Oct 20107:00 amBUSOrosur Mining Inc. Announces Results and corporate update for the First Quarter Ended August 31, 2010
5th Oct 20107:00 amBUSOrosur Mining Inc Announces Positive Drill Results for the Vaca Muerta Project, Uruguay
30th Sep 20102:12 pmBUSPosting of Annual Report
9th Sep 20103:55 pmBUSOrosur Mining Inc.: Directors Dealing
7th Sep 20109:15 amBUSOrosur Mining Inc Announces Results of the Feasibility Study For Arenal Deeps in Uruguay
3rd Sep 20107:00 amBUSOrosur Mining Inc. Announces 2010 Fourth Quarter and Full Year Earnings and Investor Update Conference Call and Web Cast
1st Sep 20107:00 amBUSOrosur Mining Inc Announces Maiden NI 43-101 Mineral Resource of 1.05 Moz Gold at Pantanillo Norte
31st Aug 20107:00 amBUSOrosur Mining Inc Announces appointment of Chief Operating Officer
12th Aug 20102:35 pmBUSFinal Results
4th Aug 20102:25 pmBUSRe Agreement
7th Jul 20107:00 amBUSRe Agreement
14th Jun 20104:33 pmBUSOrosur Mining Inc.: Director's Dealing
10th Jun 20107:00 amBUSOrosur Mining Inc.: Southern Uruguay Project Farm Out
8th Jun 20107:00 amBUSOrosur Mining Inc.: Gold Production for 2010 Financial Year
2nd Jun 20107:00 amBUSOrosur Mining Inc.: Stock Options Granted
17th May 20103:32 pmBUSDrilling Report
4th May 20107:00 amBUSOrosur Mining Inc.: Iron Ore, Manganese Ore and Base Metals Farm Out
22nd Apr 20102:10 pmBUSDirector/PDMR Shareholding
15th Apr 20107:00 amBUSOrosur Mining Inc. Announces Results for the Third Quarter and Nine Months Ended February 28, 2010 and Pantanillo Drilling Results
13th Apr 20104:58 pmBUSQ3 Results Conference Call & Webcast
7th Apr 20102:35 pmBUSIssue of Equity
10th Mar 20106:30 pmBUSOrosur Mining Inc. Stock Options Granted
2nd Mar 20107:00 amBUSOrosur Mining Inc. announces results for updated resource estimate of Arenal Deeps of 2.05Mt @ 3.68g/t (using a 1.5g/t cutoff)
25th Feb 201012:25 pmBUSDrilling Update
4th Feb 20104:38 pmBUSOrosur Mining - New Website address
15th Jan 201012:53 pmBUSDirector/PDMR Shareholding
14th Jan 20107:00 amBUSOrosur Mining Inc. Announces Results for the Second Quarter and First Half of Fiscal Year 2010
13th Jan 201012:23 pmBUSNotice of Q2 Results Release and Conference Call
11th Jan 201012:20 pmBUSOption Agreement re Iron, Manganese and Base Metals
7th Jan 20104:34 pmBUSCompletion of Plan of Arrangement - Change of Company Name
31st Dec 200911:25 amBUSCourt Approval of Plan of Arrangement
15th Dec 20097:03 amBUSDrilling Report
15th Dec 20097:00 amBUSUruguay Mineral Exploration Inc. Announces Q2 Gold Production and Reorganisation
16th Nov 20092:13 pmBUSResignation of VP Exploration
9th Nov 20097:00 amBUSUruguay Mineral Exploration and Fortune Valley Announce Proposed Business Combination
2nd Nov 20097:00 amBUSUruguay Mineral Exploration Inc.: Reschedule of Definitive Agreement with Fortune Valley
14th Oct 20091:21 pmBUSStock Options Grant
14th Oct 20097:00 amBUSUruguay Mineral Exploration Inc.: Result of Annual General Meeting and Reschedule of Definitive Agreement with Fortune Valley
14th Oct 20097:00 amBUSUruguay Mineral Exploration Inc.: Appointment of Chairman

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.