Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksOrosur Mining Regulatory News (OMI)

Share Price Information for Orosur Mining (OMI)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 4.30
Bid: 4.20
Ask: 4.40
Change: 0.10 (2.38%)
Spread: 0.20 (4.762%)
Open: 4.20
High: 4.30
Low: 4.20
Prev. Close: 4.20
OMI Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Filing of NI 43-101 Technical Report on Colombian Anzá Project

10 Jan 2019 15:59

Orosur Mining Inc. (“Orosur” or “the Company”) (TSX: OMI) (AIM: OMI) has filed a technical report prepared by Andes GMS SPA in accordance with National Instrument 43-101 Standards for Mineral Projects ("NI 43-101") on the Anzá gold exploration project (“Anzá”) in Colombia (the "Report"). To view the full report, please visit www.orosur.ca/operations/technical-reports.

Anzá is an advanced exploration project and the Report includes a review of the regional geology, local geology, types and degree of the mineralization, exploration history, metallurgical testing and drilling results and represents an update from the technical report prepared in May 2010 by Bargmann & Platten of Snowden Mining Industry Consultants.

OVERVIEW

Total project area of 105 km² (10,615 hectares) located 50km west of Medellin, Colombia with access via predominantly paved roads with a shorter gravel road leading immediately into the project area. The site has existing infrastructure including water, power, roads and a camp. 100% owned with no option fees or commitments, and includes existing environmental and mining permits relating to two gypsum mines located on the property and mined since 1991 by a thrid party. Located on the eastern side of the Cordillera Occidental of Colombia in the Metallogenic Belt of the Middle Cauca, which mainly hosts two types of gold mineralization: a porphyry style and/or an epithermal type with a strong relationship with the Cauca-Romeral fault zone, which constitutes a suture zone associated with the collision of the Choco Volcanic Arc. The most important gold mining districts of the country are located in this region. Magnetometry, induced polarization, radiometry, soil and rock sampling surveys have all been completed leading to the identification of 5 initial targets within the property: APTA, Charrascala, Guaimarala, Jesuitas and La Cejita. APTA has been drilled and initial drilling has been conducted at Charrascala. Initial metallurgical and rock density test work completed in mid-2016 provided average gold recoveries ranging from 95.9% – 96.1% utilising a combination of gravity concentration, flotation and cyanidation processing, which is comparable to the metallurgical recoveries of the development projects and producing mines in the region. Historic diamond drilling of 17,409m consisting of 53 holes was completed during 2011 to 2012 by Waymar Resources, a company and assets acquired by Orosur in mid-2014. This drilling confirmed that gold and sulphide mineralization are associated with a structurally controlled hydrothermal system (fault and breccia zones). Drilling also identified three units as carriers of gold mineralization: silicified matrix- supported breccia with pyrite / sphalerite / chalcopyrite disseminated in the matrix and veins; fault zones with similar sulphides; and laminated mudstone or tuff cut by quartz-sulphide veins. Notable interscepts from the 2011 to 2012 drill campaign include:
Hole From To Intercept Au Ag Zn
# m m m g/t g/t %
MAP‐11 213.0 219.0 6.0 18.26 1.95 0.35
including 217.5 219.0 1.5 72.30 6.90 0.93
MAP‐20 145.0 186.0 41.0 3.85 1.39 1.25
including 171.3 177.0 5.7 19.84 3.94 1.66
MAP‐21 224.0 242.0 18.0 14.14 2.05 2.83
including 225.0 229.4 4.4 45.62 5.47 10.59
252.0 253.0 1.0 10.85 1.80 0.67
MAP‐29 183.0 194.9 11.9 10.57 2.40 1.61
including 185.0 187.0 2.1 40.25 4.85 4.64
MAP‐33 157.1 179.5 22.4 10.42 1.87 1.56
including 165.0 170.8 5.8 29.49 3.37 2.81
MAP‐36 198.6 227.5 28.9 3.88 1.68 0.43
including 205.5 217.5 12.0 8.83 2.65 0.59
MAP‐38 123.4 124.5 1.1 15.40 3.60 1.94
172.0 212.5 40.5 14.09 3.82 1.95
including 179.5 186.0 6.5 70.99 6.34 0.12
including 184.6 186.0 1.4 176.00 15.20 0.39
including 202.0 205.4 3.4 20.89 9.71 4.75
MAP‐43 65.5 68.6 3.1 7.66 73.04 0.68
167.5 231.5 64.0 1.88 1.88 0.70
including 209.0 214.0 5.0 9.07 3.40 0.70
MAP‐47 105.0 118.3 13.3 2.24 316.25 1.00
including 106.0 110.5 4.5 4.69 768.89 2.34
MAP‐48 181.0 195.7 14.7 40.37 9.30 3.41
including 185.5 195.7 10.2 58.03 13.16 4.85
including 187.6 189.5 1.9 219.00 29.50 6.55
Orosur commenced its own diamond drilling programme in late 2017 Orosur completed 18 diamond drill holes totalling 6,314m at the APTA target, improving and validating the geological model. Drilling extended the mineralized zone a further 95m down dip, to a total depth of 400m. Drilling to date has encountered a number of notable intercepts over 20 g/t Au, including:
Hole From To Intercept Au Ag Zn
# m m m g/t g/t %
MAP_11 217.5 219.0 1.5 72.30 6.90 0.93
MAP_20 172.3 175.5 3.2 22.28 4.55 1.98
Including 172.3 174.0 1.7 32.60 5.50 1.82
MAP_21 225.0 231.6 6.6 35.24 5.00 6.97
Including 226.3 228.0 1.7 61.40 8.20 4.03
Including 228.0 229.4 1.4 51.50 5.10 1.80
MAP_28 220.5 221.7 1.2 29.20 8.10 0.58
MAP_29 185.0 187.0 2.0 40.25 4.85 4.64
Including 186.0 187.0 1.0 54.20 6.00 3.03
MAP_33 166.5 170.8 4.3 37.09 3.99 2.93
Including 167.5 169.0 1.5 79.90 7.70 3.15
MAP_36 213.2 214.5 1.3 23.00 4.40 0.63
MAP_38 179.5 186.0 6.5 70.99 6.34 0.12
Including 181.0 182.5 1.5 99.90 7.50 0.03
Including 184.6 186.0 1.4 176.00 15.20 0.39
202.0 205.4 3.4 20.89 9.71 4.75
Including 203.5 204.5 1.0 28.30 12.50 5.85
MAP_48 187.6 194.0 6.4 91.62 20.28 7.52
Including 187.6 189.5 1.9 219.00 29.50 6.55
Including 190.5 191.5 1.0 89.10 15.20 16.25
MAP_51 201.6 203.3 1.7 37.00 5.40 13.80
303.5 305.0 1.5 22.90 8.40 6.06
MAP_054 145.7 148.9 3.2 24.92 1.40 2.40
Including 145.7 146.7 1.0 37.96 1.30 0.70
MAP_062 237.7 238.50 0.80 25.84 7.40 0.07
MAP_070 183.0 184.0 1.0 23.66 3.60 0.04
257.0 259.0 2.0 22.04 4.65 4.23
Including 257.0 258.0 1.0 28.93 5.30 3.59
As part of this programme 5 holes, comprising 3,045m of diamond drilling, were completed at Charrascala, which tested the strong gold soil geochemical anomalies along an 800m north-south corridor. Drilling results included intersections of 3.43 g/t Au and 30.60 g/t Ag over 1.5m, and 2.62 g/t Au and 14.30 g/t Ag over 0.90m; Exploration Agreement in place with Newmont Mining announced in late 2018.

Qualified Person

The Report has been prepared by or under the supervision of independent geologist Mauricio Rubio (AusIMM), a Qualified Person under NI 43-101.

Andes GMS SPA have conducted a site visit allowing it to audit the Company’s field procedures, sample handling and preparation techniques, analytical procedures, results and Quality Assessment / Quality Control (“QAQC”) systems (check assaying) that it implements. Andes confirms that Orosur has undertaken its exploration programmes using industry best practices.

About Orosur Mining Inc.

Orosur Mining Inc. (TSX: OMI; AIM: OMI) is a precious metals developer and explorer focused on identifying and advancing gold projects in South America. The Company operates in Colombia and Uruguay.

For further information, please contact:

Orosur Mining Inc

Ignacio Salazar, Chief Executive Officer

Ryan Cohen, VP Corporate Development & Interim CFO

info@orosur.ca

Tel: +1 (778) 373-0100

Cantor Fitzgerald Europe – Nomad & Joint Broker

David Porter/Keith Dowsing

Tel: +44 (0) 20 7894 7000

Numis Securities Limited – Joint Broker

John Prior / James Black / Paul Gillam

Tel: +44 (0) 20 7260 1000

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation ("MAR"). Upon the publication of this announcement via Regulatory Information Service, this inside information is now considered to be in the public domain. If you have any queries on this, then please contact Ryan Cohen, VP Corporate Development and Interim CFO of the Company (responsible for arranging release of this announcement on behalf of the Company) on: +1 (778) 373-0100.

View source version on businesswire.com: https://www.businesswire.com/news/home/20190110005487/en/

Copyright Business Wire 2019

Date   Source Headline
3rd Apr 20177:00 amBUSOrosur Mining Inc. - Q3 2017 Results & Operations Update; YTD: $4.1M Profit, $8.7M Cash From Operations & First Quarter of New San Gregorio West UG Mine Production
2nd Mar 20177:00 amBUSOrosur Mining Inc. – PDAC Conference
3rd Feb 20178:34 amBUSOrosur Mining Inc. – Employees Exercise Options
19th Jan 201710:00 amBUSOrosur Mining Inc. – Vancouver Resource Investment Conference
19th Jan 20177:00 amBUSOrosur Mining Inc. - Colombia Anzá Gold Project Exploration Update
16th Jan 20177:36 amBUSOrosur Mining Inc. H1 2017 Results: $3.7M Profit, $7.0M Cash From Operations and New San Gregorio UG Mine Put into Production
1st Dec 20167:00 amBUSOrosur Mining Inc: Board & Management Update & Shares/Options Issuance
31st Oct 20165:07 pmBUSOrosur Mining Inc. – Employees Exercise Options
21st Oct 20167:00 amBUSOrosur Mining Inc. - Results of Annual General Meeting
17th Oct 20167:00 amBUSOrosur Mining Inc. - Q1 2017 Results: Net Profit US$2.8M & Cash Operating Costs US$693/oz
12th Oct 20167:00 amBUSOrosur Mining Inc. –  Exploration & Development Update for Uruguay and Colombia
26th Sep 20164:54 pmBUSOrosur Mining Inc. – Notice of Annual and Special Meeting
1st Sep 20167:00 amBUSOrosur Mining Inc: Share Issuance and Stock Option Grant
26th Aug 20167:00 amBUSOrosur Mining Inc. – Employees Exercise Option
23rd Aug 20167:00 amBUSOrosur Mining Inc. – Director Dealing
16th Aug 20167:00 amBUSOrosur Mining Inc. – Results for the Fiscal Year Ended May 31, 2016 - Cash Flow From Operations $7.6mm, Net Cash Position Increased by $0.7mm
10th Aug 20167:00 amBUSOrosur Mining Inc. - Notice of Results for the Full Year Ended May 31, 2016
6th Jul 201611:05 amRNSSecond Price Monitoring Extn
6th Jul 201611:00 amRNSPrice Monitoring Extension
1st Jun 20166:12 pmBUSOrosur Mining Inc: Shares Issuance and Stock Option Grant
14th Apr 20167:00 amBUSOrosur Mining Inc. - Fiscal Q3 2016 Results & Operating Update
3rd Mar 20164:29 pmBUSOrosur Mining Inc: Shares Issuance and Stock Option Grant
21st Jan 20167:00 amBUSOrosur Mining Inc: Shares Issueance and Annual Stock Option Grant
14th Jan 20167:00 amBUSOrosur Mining Inc. - Fiscal Q2 2016 Results & Operating Update
11th Jan 20164:40 pmRNSSecond Price Monitoring Extn
11th Jan 20164:35 pmRNSPrice Monitoring Extension
15th Dec 20157:00 amBUSOrosur Mining Inc: Addition of Significant Shareholder
15th Dec 20157:00 amBUSOrosur Mining Inc: Q2 Operations Update
1st Dec 20157:00 amBUSSignificant Additional Cost Savings Expected from Management Reorganisation and Streamlining
18th Nov 20156:08 pmBUSResult of Annual General Meeting
22nd Oct 20157:00 amBUSOrosur Mining: Notice of Annual and Special Meeting
15th Oct 20157:00 amBUSOrosur Mining: Fiscal Q1 2016 Results
14th Sep 20157:00 amBUSOrosur Q1 2016 Operational Update
20th Aug 20157:00 amBUSOrosur Mining Inc. Reports Results for the 12 Month Period Ended 31 May 2015
15th Jun 20157:00 amBUSOrosur Full Year & Q4 Operational Update
8th Jun 20157:00 amBUSOrosur Signs Anillo Option Agreement
21st May 20157:00 amBUSDirector’s Dealing – Orosur CEO Purchases Additional 200,000 Shares
13th May 20157:00 amBUSOrosur Mining: San Gregorio Deeps Underground Project - Resource Estimate & Update
14th Apr 20157:00 amBUSOrosur Mining Q3 2015 Results: US$3.0 Million Cash Flow from Operations and Exploration Update
11th Mar 20157:00 amBUSQ3 2015 Operational Update – 13,760 oz Gold Produced at US$876/oz Cash Costs
14th Jan 20157:00 amBUSOrosur Mining: Fiscal Q2 2015 Financial Results and Operational Update
19th Dec 20147:00 amBUSOrosur Q2 2015 Operating Results
11th Dec 20147:00 amBUSGrant of Stock Options to Directors
3rd Dec 20147:00 amBUSChief Financial Officer & Company Secretary Appointment
19th Nov 20147:00 amBUSOrosur Signs Anillo Option LOI for Non-Dilutive Funding of Up to US$3.5 Million
12th Nov 201412:48 pmBUSResult of Annual General Meeting
5th Nov 20147:00 amBUSOrosur Mining Inc.: Anillo Farm-in with Codelco Extended
15th Oct 20147:00 amBUSFiscal Q1 2015 Results – US$3.5 M Cash Flow from Operations
6th Oct 20147:00 amBUSDirectorate Change
6th Oct 20147:00 amBUSOrosur Mining Inc.: Directorate Change

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.