Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksOrosur Mining Regulatory News (OMI)

Share Price Information for Orosur Mining (OMI)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 4.30
Bid: 4.20
Ask: 4.40
Change: 0.10 (2.38%)
Spread: 0.20 (4.762%)
Open: 4.20
High: 4.30
Low: 4.20
Prev. Close: 4.20
OMI Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Filing of NI 43-101 Technical Report on Colombian Anzá Project

10 Jan 2019 15:59

Orosur Mining Inc. (“Orosur” or “the Company”) (TSX: OMI) (AIM: OMI) has filed a technical report prepared by Andes GMS SPA in accordance with National Instrument 43-101 Standards for Mineral Projects ("NI 43-101") on the Anzá gold exploration project (“Anzá”) in Colombia (the "Report"). To view the full report, please visit www.orosur.ca/operations/technical-reports.

Anzá is an advanced exploration project and the Report includes a review of the regional geology, local geology, types and degree of the mineralization, exploration history, metallurgical testing and drilling results and represents an update from the technical report prepared in May 2010 by Bargmann & Platten of Snowden Mining Industry Consultants.

OVERVIEW

Total project area of 105 km² (10,615 hectares) located 50km west of Medellin, Colombia with access via predominantly paved roads with a shorter gravel road leading immediately into the project area. The site has existing infrastructure including water, power, roads and a camp. 100% owned with no option fees or commitments, and includes existing environmental and mining permits relating to two gypsum mines located on the property and mined since 1991 by a thrid party. Located on the eastern side of the Cordillera Occidental of Colombia in the Metallogenic Belt of the Middle Cauca, which mainly hosts two types of gold mineralization: a porphyry style and/or an epithermal type with a strong relationship with the Cauca-Romeral fault zone, which constitutes a suture zone associated with the collision of the Choco Volcanic Arc. The most important gold mining districts of the country are located in this region. Magnetometry, induced polarization, radiometry, soil and rock sampling surveys have all been completed leading to the identification of 5 initial targets within the property: APTA, Charrascala, Guaimarala, Jesuitas and La Cejita. APTA has been drilled and initial drilling has been conducted at Charrascala. Initial metallurgical and rock density test work completed in mid-2016 provided average gold recoveries ranging from 95.9% – 96.1% utilising a combination of gravity concentration, flotation and cyanidation processing, which is comparable to the metallurgical recoveries of the development projects and producing mines in the region. Historic diamond drilling of 17,409m consisting of 53 holes was completed during 2011 to 2012 by Waymar Resources, a company and assets acquired by Orosur in mid-2014. This drilling confirmed that gold and sulphide mineralization are associated with a structurally controlled hydrothermal system (fault and breccia zones). Drilling also identified three units as carriers of gold mineralization: silicified matrix- supported breccia with pyrite / sphalerite / chalcopyrite disseminated in the matrix and veins; fault zones with similar sulphides; and laminated mudstone or tuff cut by quartz-sulphide veins. Notable interscepts from the 2011 to 2012 drill campaign include:
Hole From To Intercept Au Ag Zn
# m m m g/t g/t %
MAP‐11 213.0 219.0 6.0 18.26 1.95 0.35
including 217.5 219.0 1.5 72.30 6.90 0.93
MAP‐20 145.0 186.0 41.0 3.85 1.39 1.25
including 171.3 177.0 5.7 19.84 3.94 1.66
MAP‐21 224.0 242.0 18.0 14.14 2.05 2.83
including 225.0 229.4 4.4 45.62 5.47 10.59
252.0 253.0 1.0 10.85 1.80 0.67
MAP‐29 183.0 194.9 11.9 10.57 2.40 1.61
including 185.0 187.0 2.1 40.25 4.85 4.64
MAP‐33 157.1 179.5 22.4 10.42 1.87 1.56
including 165.0 170.8 5.8 29.49 3.37 2.81
MAP‐36 198.6 227.5 28.9 3.88 1.68 0.43
including 205.5 217.5 12.0 8.83 2.65 0.59
MAP‐38 123.4 124.5 1.1 15.40 3.60 1.94
172.0 212.5 40.5 14.09 3.82 1.95
including 179.5 186.0 6.5 70.99 6.34 0.12
including 184.6 186.0 1.4 176.00 15.20 0.39
including 202.0 205.4 3.4 20.89 9.71 4.75
MAP‐43 65.5 68.6 3.1 7.66 73.04 0.68
167.5 231.5 64.0 1.88 1.88 0.70
including 209.0 214.0 5.0 9.07 3.40 0.70
MAP‐47 105.0 118.3 13.3 2.24 316.25 1.00
including 106.0 110.5 4.5 4.69 768.89 2.34
MAP‐48 181.0 195.7 14.7 40.37 9.30 3.41
including 185.5 195.7 10.2 58.03 13.16 4.85
including 187.6 189.5 1.9 219.00 29.50 6.55
Orosur commenced its own diamond drilling programme in late 2017 Orosur completed 18 diamond drill holes totalling 6,314m at the APTA target, improving and validating the geological model. Drilling extended the mineralized zone a further 95m down dip, to a total depth of 400m. Drilling to date has encountered a number of notable intercepts over 20 g/t Au, including:
Hole From To Intercept Au Ag Zn
# m m m g/t g/t %
MAP_11 217.5 219.0 1.5 72.30 6.90 0.93
MAP_20 172.3 175.5 3.2 22.28 4.55 1.98
Including 172.3 174.0 1.7 32.60 5.50 1.82
MAP_21 225.0 231.6 6.6 35.24 5.00 6.97
Including 226.3 228.0 1.7 61.40 8.20 4.03
Including 228.0 229.4 1.4 51.50 5.10 1.80
MAP_28 220.5 221.7 1.2 29.20 8.10 0.58
MAP_29 185.0 187.0 2.0 40.25 4.85 4.64
Including 186.0 187.0 1.0 54.20 6.00 3.03
MAP_33 166.5 170.8 4.3 37.09 3.99 2.93
Including 167.5 169.0 1.5 79.90 7.70 3.15
MAP_36 213.2 214.5 1.3 23.00 4.40 0.63
MAP_38 179.5 186.0 6.5 70.99 6.34 0.12
Including 181.0 182.5 1.5 99.90 7.50 0.03
Including 184.6 186.0 1.4 176.00 15.20 0.39
202.0 205.4 3.4 20.89 9.71 4.75
Including 203.5 204.5 1.0 28.30 12.50 5.85
MAP_48 187.6 194.0 6.4 91.62 20.28 7.52
Including 187.6 189.5 1.9 219.00 29.50 6.55
Including 190.5 191.5 1.0 89.10 15.20 16.25
MAP_51 201.6 203.3 1.7 37.00 5.40 13.80
303.5 305.0 1.5 22.90 8.40 6.06
MAP_054 145.7 148.9 3.2 24.92 1.40 2.40
Including 145.7 146.7 1.0 37.96 1.30 0.70
MAP_062 237.7 238.50 0.80 25.84 7.40 0.07
MAP_070 183.0 184.0 1.0 23.66 3.60 0.04
257.0 259.0 2.0 22.04 4.65 4.23
Including 257.0 258.0 1.0 28.93 5.30 3.59
As part of this programme 5 holes, comprising 3,045m of diamond drilling, were completed at Charrascala, which tested the strong gold soil geochemical anomalies along an 800m north-south corridor. Drilling results included intersections of 3.43 g/t Au and 30.60 g/t Ag over 1.5m, and 2.62 g/t Au and 14.30 g/t Ag over 0.90m; Exploration Agreement in place with Newmont Mining announced in late 2018.

Qualified Person

The Report has been prepared by or under the supervision of independent geologist Mauricio Rubio (AusIMM), a Qualified Person under NI 43-101.

Andes GMS SPA have conducted a site visit allowing it to audit the Company’s field procedures, sample handling and preparation techniques, analytical procedures, results and Quality Assessment / Quality Control (“QAQC”) systems (check assaying) that it implements. Andes confirms that Orosur has undertaken its exploration programmes using industry best practices.

About Orosur Mining Inc.

Orosur Mining Inc. (TSX: OMI; AIM: OMI) is a precious metals developer and explorer focused on identifying and advancing gold projects in South America. The Company operates in Colombia and Uruguay.

For further information, please contact:

Orosur Mining Inc

Ignacio Salazar, Chief Executive Officer

Ryan Cohen, VP Corporate Development & Interim CFO

info@orosur.ca

Tel: +1 (778) 373-0100

Cantor Fitzgerald Europe – Nomad & Joint Broker

David Porter/Keith Dowsing

Tel: +44 (0) 20 7894 7000

Numis Securities Limited – Joint Broker

John Prior / James Black / Paul Gillam

Tel: +44 (0) 20 7260 1000

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation ("MAR"). Upon the publication of this announcement via Regulatory Information Service, this inside information is now considered to be in the public domain. If you have any queries on this, then please contact Ryan Cohen, VP Corporate Development and Interim CFO of the Company (responsible for arranging release of this announcement on behalf of the Company) on: +1 (778) 373-0100.

View source version on businesswire.com: https://www.businesswire.com/news/home/20190110005487/en/

Copyright Business Wire 2019

Date   Source Headline
11th Oct 20127:00 amBUSOrosur Mining Inc. Announces Appointment of Non Executive Director
24th Sep 20127:00 amBUSOrosur Mining Inc. : Issue of Ordinary Shares upon Exercise of Stock Options
17th Sep 20127:00 amBUSOrosur Mining Inc.: Issue of Ordinary Shares upon Exercise of Stock Options
10th Sep 20127:00 amBUSOrosur Mining Inc. Upcoming Announcement on Strategy
15th Aug 20127:00 amBUSOrosur Mining Inc. Announces Results for the Full year Ended May 31, 2012
15th Aug 20127:00 amBUSOrosur Mining Inc. Announces Exploration and Development Update
6th Aug 20127:00 amBUSOrosur Mining Inc. Announces Change of Board Composition
1st Aug 20123:16 pmBUSOrosur Mining Inc. Announces Change of Adviser
10th Jul 20127:00 amBUSOrosur Mining Inc Announces Grant of Operation Permit for the New Tailings Storage Facility
9th Jul 20127:00 amBUSOrosur Mining Inc Announces Appointment of Walter Muehlebach as General Manager Exploration
14th Jun 20127:05 amBUSOrosur Mining Inc Announces Production Update for the fourth quarter and Fiscal Year ended May 31, 2012 and production guidance for the Fiscal Year ended May 31, 2013
14th Jun 20127:00 amBUSOrosur Mining Inc Announces New Staff Appointments at San Gregorio
6th Jun 20127:00 amBUSOrosur Mining Inc. Issue of Ordinary Shares upon Exercise of Stock Options
1st Jun 20127:03 amBUSOrosur Mining Inc. appoints Seymour Pierce as Joint Broker
1st Jun 20127:00 amBUSOrosur Mining Inc. Announces Updated Results of the Preliminary Economic Assessment on Pantanillo Norte
18th May 20127:00 amBUSOrosur Mining Inc. Issue of Ordinary Shares upon Exercise of Stock Options
14th May 20127:00 amBUSOrosur Mining Inc. to Commence Trading on the Toronto Stock Exchange (TSX)
13th Apr 20127:00 amBUSOrosur Mining Inc. Announces Results for the Third Quarter and Nine Months Ended February 29, 2012
12th Apr 20127:02 amBUSOrosur Mining Inc Announces Drill Results for the Mahoma Project, Uruguay
12th Apr 20127:00 amBUSOrosur Mining Inc. Announces 2012 Third Quarter Conference Call and Web Cast
6th Mar 20123:15 pmBUSOrosur Mining update on Chile
6th Mar 20127:00 amBUSOrosur Mining Inc Announces Grant of Permits to fully Exploit Ore from its Underground Project, Arenal Deeps
5th Mar 20127:00 amBUSExploration Update
17th Jan 20127:00 amBUSChange of Chairman
12th Jan 20127:02 amBUSOrosur Mining Inc. Announces Results of the Preliminary Economic Assessment on Pantanillo Norte Project in Chile
12th Jan 20127:00 amBUSOrosur Mining Inc. Announces Results for the Second Quarter Ended November 30, 2011
11th Jan 20127:00 amBUSOrosur Mining Inc. Announces 2012 Second Quarter and Half Year Conference Call and Web Cast
9th Nov 20117:00 amBUSOrosur Mining Inc. Receives Water Exploration Permit for Pantanillo Project in Chile
4th Nov 20114:28 pmBUSIssue of Shares upon Exercise of Stock Options
19th Oct 201111:36 amBUSResult of AGM
17th Oct 20114:35 pmRNSPrice Monitoring Extension
13th Oct 20117:00 amBUSOrosur Mining Inc. Announces Results for the First Quarter Ended August 31, 2011
23rd Sep 20117:00 amBUSOrosur Mining Inc. Posting of Annual Report
14th Sep 20117:00 amBUSOrosur Mining Inc Announces Appointment of Non-Executive Director
30th Aug 20117:00 amBUSOrosur Mining Inc Announces Definitive Acquisition Signed for Talca
18th Aug 20117:00 amBUSOrosur Mining Inc. Announces Results for the Full year Ended May 31, 2011
17th Aug 20117:00 amBUSOrosur Mining Inc. Announces 2011 Fourth Quarter and Full Year Earnings Conference Call and Web Cast 11:00 AM Eastern and 16:00 UK time, Thursday August 18, 2011
22nd Jun 20117:00 amBUSOrosur Mining Inc. Completes Private Placement
10th Jun 20117:49 amRNSPlacing of US$13.5 million
20th May 20115:19 pmBUSIssue of Equity
14th Apr 20117:00 amBUSOrosur Mining Inc. Announces Results for the Third Quarter and Nine Months Ended February 28, 2011
13th Apr 20117:00 amBUSOrosur Mining Inc. Announces 2011 Third Quarter Earnings Conference Call and Web Cast
1st Apr 20117:00 amBUSOrosur Mining Inc. Issue of Ordinary Shares upon Exercise of Stock Options
24th Mar 20117:00 amBUSOrosur Mining Inc. announces Gladiator earns its first 20% Interest in Orosur´s Iron Ore Prospects in Uruguay
21st Mar 20117:00 amBUSOrosur Mining Inc Announces First Blasting at Arenal Deeps following Grant of Permits to Commence Development
18th Mar 20117:00 amBUSOrosur Mining Inc. Secures US$5.5 million Debt Facility with HSBC for Arenal Deeps
14th Feb 201110:33 amBUSDrilling Report
13th Jan 20117:00 amBUSOrosur Mining Inc. Announces Positive Results for the Second Quarter Ended November 30, 2010.
12th Jan 20113:08 pmBUSNotice of Q2 Results Conference Call and Webcast
11th Jan 20115:21 pmBUSIssue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.