Chris Heminway, Exec-Chair at Time To ACT, explains why now is the right time for the Group to IPO. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksOrosur Mining Regulatory News (OMI)

Share Price Information for Orosur Mining (OMI)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 4.80
Bid: 4.70
Ask: 4.90
Change: 0.15 (3.23%)
Spread: 0.20 (4.255%)
Open: 4.65
High: 4.80
Low: 4.65
Prev. Close: 4.65
OMI Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Orosur Mining Inc Announces Drill Results for the Mahoma Project, Uruguay

12 Apr 2012 07:02

Orosur Mining Inc. ("OMI" or "the Company") (TSX VENTURE: OMI) (LSE: OMI), a South American-focused gold producer and explorer, today announces drill results from its 100 per cent owned Mahoma Project in Uruguay. The drilling programme is designed to confirm grades and widths found historically at Mahoma.

Current drilling campaign confirms similar narrow high grade gold results on Veta II as per historical drilling. Drill program to be expanded to target the definition of a NI 43-101 compliant resource during calendar 2012 with the goal of providing the basis for a feasibility study to target annual mine production of 25,000 ounces of gold that could be processed at the San Gregorio mine.

David Fowler, CEO of the Company, stated, "We are pleased with drill results from our first pass drill program at Mahoma as they have confirmed historically identified grades and widths on Veta II. Orosur will now expand its drilling programme with the objective of defining a resource during calendar 2012. It is anticipated that this resource will provide the basis for a feasibility study to produce a total of 25,000 ounces per annum. The study will be based on ore being transported to the San Gregorio mine to minimise capital expenditure and reduce study and permitting time."

The Company has completed 24 drill holes for 1,815 meters from an initial planned drill programme of approximately 3,000 meters, comprising 2,000 metres of RC pre-collars and 1,000 metres of diamond drilling. The drill programme is designed to generally confirm historical drill results for vein I, vein II and vein IIB. This work is expected to be followed by infill drilling to target an initial measured and indicated resource of 250,000 tonnes.

Table 1. Drill-Hole Results for the Mahoma Project, Uruguay

Target Drill Hole No From To Interval Interval g/t Au
VETA II ESTE MHDD001 No significant results
VETA II ESTE MHDD002 No significant results
VETA II ESTE MHDD003 42.30 42.75 0.45 21.86
60.75 61.15 0.40 14.38
VETA II ESTE MHDD004 No significant results
VETA II ESTE MHDD005 85.40 85.70 0.30 56.17
85.70 86.03 0.33 1.40
87.53 88.25 0.72 2.00
VETA II ESTE MHDD006 84.95 85.50 0.55 5.33
86.70 87.20 0.50 2.45
88.30 88.62 0.32 46.60
88.62 88.93 0.31 29.30
88.93 89.43 0.50 1.13
VETA II ESTE MHDD007 82.55 82.95 0.40 7.97
85.55 86.60 1.05 2.83
VETA II ESTE MHDD008 80.45 80.90 0.45 3.47
VETA II ESTE MHDD009 71.30 71.75 0.45 41.05
72.20 72.60 .40 5.67
73.00 73.50 0.50 3.43
73.80 74.20 0.40 100.63
74.60 75.00 0.40 6.10
75.00 75.40 0.40 3.16
81.30 81.80 0.50 3.11
VETA II ESTE MHDD010 83.95 84.35 0.40 5.30
85.85 86.30 0.45 3.46
VETA II ESTE MHDD015 83.90 84.40 0.50 19.57
84.40 85.15 0.75 4.79
86.65 87.15 0.50 12.23
VETA II ESTE MHRC001 28.00 29.00 1.00 10.86
43.00 44.00 1.00 15.20
VETA II ESTE MHRC002 6.00 7.00 1.00 2.10
VETA II ESTE MHRC003 No significant results
VETA II OESTE MHDD022 No significant results
VETA II OESTE MHDD023 No significant results
VETA II OESTE MHDD025 57.80 58.30 0.50 2.67
VETA II OESTE MHRC008 No significant results
VETA II OESTE MHRC009 No significant results
VETA II OESTE MHRC010 42.00 43.00 1.00 4.25
43.00 44.00 1.00 14.13
44.00 45.00 1.00 2.13
VETA IIB MHDD018 No significant results
VETA IIB MHDD019 No significant results
VETA IIB MHRC004 No significant results
VETA IIB MHRC005 No significant results

A drill hole plan map and sections are available on the Company's website.

Diamond drill holes 1 to 10 and 15 and reverse circulation drill holes 1 to 3 were all drilled within the historically defined 600 meter main portion of the II vein. Diamond drill holes 1 and 2 confirm previous drilling that showed no significant mineralisation on the sections and to depths drilled. Short intervals were assayed to understand grade distribution. While many of the intercepts are narrow the current drilling supports the envisaged target of 9-10 g/t Au over a minable width of 1.5 meters.

Drilling on Veta II Oeste and Veta IIB has not confirmed mineralisation identified in a number of historic sections with results less consistent than expected.

Table 2. Drill Hole Location Data, Mahoma Project, Uruguay

Drill Hole No East_GK North_GK RL Azimuth Dip Depth
MHRC003 401915 6219796 91.5 175 -50 40
MHRC002 402064 6219819 88 175 -55 30
MHDD015 402208 6219880 87 175 -65 110
MHDD010 402337 6219899 82 175 -60 96
MHDD009 402360 6219902 81 175 -60 89
MHDD008 402382 6219903 81 175 -60 85
MHDD007 402408 6219908 80 175 -60 91
MHDD006 402436 6219910 80 175 -60 96
MHDD005 402457 6219909 78 175 -60 93
MHDD004 402483 6219911 78 175 -60 81
MHDD003 402507 6219912 77 175 -55 66
MHRC001 402532 6219900 77 175 -60 60
MHDD002 402582 6219923 76 175 -60 110
MHDD001 402631 6219927 75 175 -50 78
MHDD025 401316 6219756 101.5 175 -55 70
MHRC008 401366 6219760 101 175 -60 70
MHDD022 401439 6219787 101 175 -50 76
MHDD023 401464 6219784 100 175 -50 68
MHRC010 401489 6219791 99 175 -50 60
MHRC009 401517 6219773 100 175 -45 70
MHRC005 401741 6219538 97 175 -45 45
MHRC004 401893 6219553 99 185 -55 70
MHDD019 402044 6219550 99 185 -55 80
MHDD018 402116 6219552 98 175 -55 79
1,815

About Mahoma

The Project area contains four principal gold bearing quartz veins that were previously mined via shallow open pits within granodiorite host rocks. The granodiorite stock measures approximately 3 km wide in the Mahoma area and contains additional quartz veins that have not yet been explored. The area is located approximately 130 kilometres from Montevideo and 405 kilometres from the San Gregorio mine in the Florida Greenstone belt.

Four principal veins have been identified; veins I, II, IIB and IV. Vein II is the longest and most consistent that has been historically drilled and mined. It has a drilled strike length of 900 metres and a shallow open pit extends along 450 metres of its strike length. The main portion of Vein II is sub vertical and the average true thickness is around 1.7 metres. A second portion of vein II is approximately 1,200 metres to the east of the main mineralized lens and it has been drilled for over 700 metres of strike with 220 metres showing continuous mineralization. The width of the second vein varies from 0.2 metres to 3.2 metres with an average width of approximately 1.9 metres.

Vein IIB, 300 metres to the south of vein II, is approximately 550 metres in length and exhibits an average width of 1.5 metres. Vein IV is a thicker quartz vein zone than the other zones but also has a lower grade and a shorter strike length of approximately 250 metres. It has been drilled to only 30 metres from the surface. Vein I comprises a series of short and narrow veins with the average width of these veins being 20 centimetres and the largest vein having a strike length of 100 metres.

Only the upper portions of the four drill hole defined veins have previously been mined and there is significant exploration upside potential to define more veins and extend the known veins down dip.

Orosur has held the property since 2009, however, issues with land access had previously prevented exploration. During the second half of 2011 these issues were resolved and exploration is now being conducted.

The Mahoma Project, previously operated by American Resource Corporation, produced 16,419 ounces (73,431 tonnes at 6.98 g/t Au with 91.6 per cent recovery) between 1993 and 1997. A pre-mining non -compliant NI 43-101 probable reserve of 281,000 tonnes at a diluted grade of 9.36 g/t (15 per cent dilution assumed) was estimated by WattsGriffis and McOuat.

Assaying and Qualified Person

Project geologists log and mark the core then technicians cut the individual lengths with a diamond saw, tag the sample bags and secure them with security clips. The samples are then transported to the Company's laboratory facility at San Gregorio. They are dried and crushed to -2mm. A 1,000 gram split of the coarse material is then pulverized to -200 mesh. The rejects remained at the prep facility and the pulps are analyzed for gold by 30g fire assay with an AA/gravimetric finish. In addition, a 214 element ICP analysis is conducted on selective samples. A QA/QC program has been implemented as part of the sampling procedure for the drill program. One standard, one blank or one duplicate are inserted per group of ten samples sent to the laboratory. The information in this news release has been approved by William Lindqvist, the Company's Qualified Person under National Instrument 43-101 standards.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

About Orosur Mining Inc.

Orosur Mining Inc. is a fully integrated gold producer and exploration company focused on identifying and developing gold projects in Latin America. The Company operates the only producing gold mine in Uruguay (San Gregorio), and has assembled an exploration portfolio of high quality assets in Uruguay and Chile. The Company is quoted in Canada (TSX-Venture Exchange: OMI) and London (AIM: OMI).

Orosur Mining IncDavid Fowler, CEOorIgnacio Salazar, + 56 2 9246800CFOinfo@orosur.caorCanaccord Genuity Limited (Nominated Adviser & Broker)Rob Collins, +44 (0) 20 7050 6500orBlythe Weigh Communications (Investor Relations)Tim Blythe, +44 (0) 7816 924626orMatthew Neal, +44 (0) 7917 800011

Copyright Business Wire 2012

Date   Source Headline
23rd Apr 20247:00 amRNSResults for Third Quarter ended February 29, 2024
25th Mar 20247:00 amRNSColombia update
23rd Feb 20247:00 amRNSAdministrative Update & Options Exercise
21st Feb 20248:01 amRNSIssue of new common shares and issue of warrants
15th Feb 20241:56 pmRNSShare Placing
26th Jan 20247:00 amRNSResults for Second Quarter ended November 30 2023
23rd Jan 20247:00 amRNSColombia Update
19th Dec 20234:02 pmRNSAGM Results
28th Nov 20237:00 amRNSLithium JV, Nigeria
20th Nov 20237:00 amRNSNotice of AGM and Investor Q&A Session
30th Oct 20237:00 amRNSResults for First Quarter ended August 31, 2023
20th Oct 20231:11 pmRNSInvestor Webinar
16th Oct 20237:00 amRNSLithium JV, Nigeria
29th Sep 20237:00 amRNSFull Year 2023 Results
5th Jul 20237:00 amRNSOperational Update, Brazil
23rd May 20237:00 amRNSAppointment of New Auditor
9th May 20233:45 pmRNSDirectors Purchase of shares
5th May 20237:00 amRNSInvestor Webinar
4th May 20237:00 amRNSOperational Update
27th Apr 20237:00 amRNSThird Quarter Results for 2022/23
2nd Mar 20237:00 amRNSOperational Update
27th Feb 20234:35 pmRNSPrice Monitoring Extension
27th Feb 20232:05 pmRNSSecond Price Monitoring Extn
27th Feb 20232:00 pmRNSPrice Monitoring Extension
30th Jan 20237:00 amRNSSecond Quarter Results for 2022/23
17th Jan 20237:00 amRNSColombia update
5th Dec 202211:05 amRNSSecond Price Monitoring Extn
5th Dec 202211:00 amRNSPrice Monitoring Extension
2nd Dec 20224:41 pmRNSSecond Price Monitoring Extn
2nd Dec 20224:36 pmRNSPrice Monitoring Extension
2nd Dec 20222:05 pmRNSSecond Price Monitoring Extn
2nd Dec 20222:00 pmRNSPrice Monitoring Extension
2nd Dec 20221:38 pmRNSAGM Results & Notification of Investor Q&A Session
2nd Dec 202211:05 amRNSSecond Price Monitoring Extn
2nd Dec 202211:00 amRNSPrice Monitoring Extension
2nd Dec 20229:05 amRNSSecond Price Monitoring Extn
2nd Dec 20229:00 amRNSPrice Monitoring Extension
2nd Dec 20227:00 amRNSColombia update
3rd Nov 20227:00 amRNSNotice of AGM and Investor Q&A Session
31st Oct 20227:00 amRNSResults for First Quarter ended August 31, 2022
21st Oct 20224:41 pmRNSSecond Price Monitoring Extn
21st Oct 20224:36 pmRNSPrice Monitoring Extension
21st Oct 20222:06 pmRNSSecond Price Monitoring Extn
21st Oct 20222:00 pmRNSPrice Monitoring Extension
21st Oct 202211:05 amRNSSecond Price Monitoring Extn
21st Oct 202211:00 amRNSPrice Monitoring Extension
21st Oct 20229:05 amRNSSecond Price Monitoring Extn
21st Oct 20229:00 amRNSPrice Monitoring Extension
21st Oct 20227:00 amRNSColombia update
29th Sep 20227:00 amRNSFull Year 2022 Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.