The latest Investing Matters Podcast episode featuring financial educator and author Jared Dillian has been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksOrosur Mining Regulatory News (OMI)

Share Price Information for Orosur Mining (OMI)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 4.65
Bid: 4.60
Ask: 4.70
Change: 0.00 (0.00%)
Spread: 0.10 (2.174%)
Open: 4.65
High: 4.80
Low: 4.60
Prev. Close: 4.65
OMI Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Orosur Mining Inc. announces results for updated resource estimate of Arenal Deeps of 2.05Mt @ 3.68g/t (using a 1.5g/t cutoff)

2 Mar 2010 07:00

Orosur Mining Inc. ("OMI" or the "Company") is pleased to announce completion of the updated Arenal Deeps resource estimate. The resource was modeled and estimated by Mine Development Associates and is considered to be NI 43-101 compliant. A summary table is presented here and more information can be found on the company web site. The 1.5 Au g/t cutoff is highlighted as the current anticipated economic cutoff based on a prefeasibility study produced by Golders & Associates dated 24 September 2009.

Measured Indicated
Cutoff Tonnes Grade Gold Cutoff Tonnes Grade Gold
(g Au/t) Ounces (g Au/t) Ounces
0.5 3,089,000 1.57 155,000 0.5 5,987,000 1.45 280,000
1.0 1,416,000 2.59 118,000 1.0 2,587,000 2.44 203,000
1.5 846,000 3.52 96,000 1.5 1,297,000 3.68 153,000
2.0 586,000 4.33 82,000 2.0 908,000 4.52 132,000
Measured and Indicated Inferred
0.5 9,076,000 1.49 435,000 0.5 162,000 2.01 10,000
1.0 4,002,000 2.49 321,000 1.0 99,000 2.84 9,000
1.5 2,143,000 3.61 249,000 1.5 63,000 3.77 8,000
2.0 1,494,000 4.43 213,000 2.0 44,000 4.65 7,000
Note: as of end of July 2009 topography

Arenal Deeps is the down plunge continuation of the Arenal deposit that was mined as an open pit between October 2004 and April 2009 and produced 388,000 ounces of gold at an average grade of 2.16 Au g/t using a 0.5g/t cut off grade.

The Arenal Deeps exploration and resource definition drilling programs completed 108 RC and diamond drill holes for 34,454 meters during 2008 and 2009. 62% of the holes were diamond and 38% RC and RC pre-collars. The drill programs were based on 25m spaced N-S sections and an attempt was made to keep the drill hole spacing to less than 50m along section resulting in a drill density of approximately 25m x 50m. The deposit is fault-bounded to the west but considered to be still open along strike to the east and down plunge to the SE.

As announced on 25 February 2010 AMEC has been appointed to complete a feasibility study and have already visited the San Gregorio Mine site to commence this work which is expected to be completed in the third calendar quarter of 2010.

David Fowler, Chief Executive Officer commented: "We are pleased with the updated resource estimate for Arenal Deeps and that it has resulted in an increase in measured and indicated grade, from 2.21 Au g/t in the previous resource estimate to 3.61 Au g/t in this estimate assuming a 1.5 Au g/t cutoff. While tonnes are lower than the previous resource estimate overall ounces have increased and the increase in grade will improve project economics. The OMI technical team at San Gregorio did a great job on delivering the model on time and the results are better than expected."

Qualified Person's Statement

The information presented in this press release has been reviewed by Devin den Boer, PGeo, OMI Exploration Manager and is considered to be in compliance with NI 43-101 reporting guidelines. Mr. den Boer has a Bachelor of Science (Geological Sciences) Degree from the University of British Columbia, is a registered member of APEGBC and has over 13 years of international experience in minerals exploration.

Forward Looking Statements

All statements, other than statements of historical fact, contained or incorporated by reference in this news release, including any information as to the future financial or operating performance of the Company, constitute "forward-looking statements" within the meaning of certain securities laws, including the "safe harbour" provisions of the Securities Act (Ontario) and the United States Private Securities Litigation Reform Act of 1995 and are based on expectations estimates and projections as of the date of this news release. There can be no assurance that such statements will prove to be accurate, such statements are subject to significant risks and uncertainties, and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements include, without limitation success of exploration activities; permitting time lines; the failure of plant; equipment or processes to operate as anticipated; accidents; labour disputes; requirements for additional capital title disputes or claims and limitations on insurance coverage. The Company disclaims any intention or obligation to update or revise any forward looking statements whether as a result of new information, future events and such forward-looking statements, except to the extent required by applicable law.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

About Orosur Mining Inc.

Orosur Mining Inc. is a fully integrated gold producer and exploration company focused on identifying and developing gold projects in Latin America. The Company operates the only producing gold mine in Uruguay (San Gregorio), and has assembled an exploration portfolio of high quality assets in Uruguay and Chile. The Company is quoted in Canada (TSX-Venture Exchange: OMI) and London (AIM: OMI).

For further information, please contact:

Orosur Mining Inc David Fowler, CEO:Ignacio Salazar, CFO + 598 2 6016354; info@orosur.ca

Matrix Corporate Capital LLP (Nominated Adviser & Broker) Louis Castro, +44 (0) 203 206 7209Tim Graham, +44 (0) 203 206 7206

In North America Forbes West 416-203-2200 forbes@sherbournegroup.ca

Copyright Business Wire 2010

Date   Source Headline
23rd Apr 20247:00 amRNSResults for Third Quarter ended February 29, 2024
25th Mar 20247:00 amRNSColombia update
23rd Feb 20247:00 amRNSAdministrative Update & Options Exercise
21st Feb 20248:01 amRNSIssue of new common shares and issue of warrants
15th Feb 20241:56 pmRNSShare Placing
26th Jan 20247:00 amRNSResults for Second Quarter ended November 30 2023
23rd Jan 20247:00 amRNSColombia Update
19th Dec 20234:02 pmRNSAGM Results
28th Nov 20237:00 amRNSLithium JV, Nigeria
20th Nov 20237:00 amRNSNotice of AGM and Investor Q&A Session
30th Oct 20237:00 amRNSResults for First Quarter ended August 31, 2023
20th Oct 20231:11 pmRNSInvestor Webinar
16th Oct 20237:00 amRNSLithium JV, Nigeria
29th Sep 20237:00 amRNSFull Year 2023 Results
5th Jul 20237:00 amRNSOperational Update, Brazil
23rd May 20237:00 amRNSAppointment of New Auditor
9th May 20233:45 pmRNSDirectors Purchase of shares
5th May 20237:00 amRNSInvestor Webinar
4th May 20237:00 amRNSOperational Update
27th Apr 20237:00 amRNSThird Quarter Results for 2022/23
2nd Mar 20237:00 amRNSOperational Update
27th Feb 20234:35 pmRNSPrice Monitoring Extension
27th Feb 20232:05 pmRNSSecond Price Monitoring Extn
27th Feb 20232:00 pmRNSPrice Monitoring Extension
30th Jan 20237:00 amRNSSecond Quarter Results for 2022/23
17th Jan 20237:00 amRNSColombia update
5th Dec 202211:05 amRNSSecond Price Monitoring Extn
5th Dec 202211:00 amRNSPrice Monitoring Extension
2nd Dec 20224:41 pmRNSSecond Price Monitoring Extn
2nd Dec 20224:36 pmRNSPrice Monitoring Extension
2nd Dec 20222:05 pmRNSSecond Price Monitoring Extn
2nd Dec 20222:00 pmRNSPrice Monitoring Extension
2nd Dec 20221:38 pmRNSAGM Results & Notification of Investor Q&A Session
2nd Dec 202211:05 amRNSSecond Price Monitoring Extn
2nd Dec 202211:00 amRNSPrice Monitoring Extension
2nd Dec 20229:05 amRNSSecond Price Monitoring Extn
2nd Dec 20229:00 amRNSPrice Monitoring Extension
2nd Dec 20227:00 amRNSColombia update
3rd Nov 20227:00 amRNSNotice of AGM and Investor Q&A Session
31st Oct 20227:00 amRNSResults for First Quarter ended August 31, 2022
21st Oct 20224:41 pmRNSSecond Price Monitoring Extn
21st Oct 20224:36 pmRNSPrice Monitoring Extension
21st Oct 20222:06 pmRNSSecond Price Monitoring Extn
21st Oct 20222:00 pmRNSPrice Monitoring Extension
21st Oct 202211:05 amRNSSecond Price Monitoring Extn
21st Oct 202211:00 amRNSPrice Monitoring Extension
21st Oct 20229:05 amRNSSecond Price Monitoring Extn
21st Oct 20229:00 amRNSPrice Monitoring Extension
21st Oct 20227:00 amRNSColombia update
29th Sep 20227:00 amRNSFull Year 2022 Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.