Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNyota Minerals Regulatory News (NYO)

  • There is currently no data for NYO

Nickel Project Update

30 Jul 2007 07:27

Dwyka Resources Limited30 July 2007 Dwyka Resources Limited ('Dwyka' or the 'Company') MUREMERA NICKEL PROJECT UPDATE Highlights - Detailed logging and sampling of UNDP core confirms presence of both nickeland copper mineralization - Petrographic analysis found that pentlandite and chalcopyrite (the minerals ofNi and Cu respectively) are present in most cases - Signing of 5,000 metre diamond drilling contract - VTEM geophysical survey commencing shortly The directors of Dwyka Resources Limited ("Dwyka or the 'Company'") are pleasedto provide an update of progress at the Company's Muremera Nickel Project ("theProject") in Burundi. Dwyka holds a 100% interest in the Muremera NickelProject through its wholly owned subsidiary, Danyland Limited ("Danyland"). The Muremera Exploration Permit is located in north-eastern Burundi and is onthe border with Tanzania where it lies adjacent to the Kabanga Nickel Project ("Kabanga") currently being developed by Xstrata Plc and Barrick Gold Limited.Kabanga currently has an inferred resource of 36mt @2.8% Ni (Xstrata NewsRelease: Toronto, February 15, 2007). The Muremera project area was previouslyexplored by the United Nations Development Programme ("UNDP") which foundseveral geophysical anomalies in Burundi along strike from Kabanga. Detailed logging and sampling of the UNDP core has now been undertaken. Twelvedrillholes were logged, sampled and petrographically analysed. Geostatisticalanalyses revealed a high correlation coefficient between the UNDP results andthe new results allowing for the combined use of the two data sets ingeochemical studies of the deposit. The petrographic analysis has found thatpentlandite and chalcopyrite (the minerals of Ni and Cu respectively) arepresent in most cases, though often fine grained. The directors of Dwykabelieve that based on these early observations there exist similarities betweenKabanga and Muremera. A 5,000 metre diamond drilling contract has been signed with Major DrillingTanzania for the Muremera Nickel project. The drilling is aimed at furtherdefining anomalies identified through previous core drilling and geophysicalwork and the analysis outlined above, and is expected to start mid August 2007. Construction of a 20 man camp at Muremera has begun and will be completed before drilling commences. The initial 5,000 metres of diamond drilling will becompleted with an UDR 200D drill rig with hole depths ranging from 500 to 1,000metres. An estimated 1,000 samples will be sent to Johannesburg, South Africafor assaying. The diamond drilling forms part of Phase 1 of the Muremera exploration programmewhich also includes an extensive VTEM geophysical survey expected to commenceSeptember 2007. Phase 1 includes airborne geophysical survey, follow up groundgeophysical survey and drilling of selected targets. The Geotech VTEM surveywill be the first VTEM with B-field survey flown in Africa. Background As previously announced, an agreement was signed between Dwyka and BHP BillitonWorld Exploration Inc "BHP Billiton" on 26th February, whereby BHP Billiton willfund up to US$5.2 million of future exploration on the Muremera project for notmore than 50% of the equity in Danyland. The first hurdle is for BHP Billiton tospend US$1.2 million to acquire a 10% equity interest in Danyland. The technical exploration and mining information contained in the aboveannouncement has been reviewed and approved by Ed Nealon, who has sufficientexperience which is relevant to the style of mineralisation and type of depositunder consideration and to the activity which he is qualified as a CompetentPerson as defined in the 2004 Edition of the 'Australasian Code for Reporting ofExploration Results, Mineral Resources and Ore Reserves'. Mr Nealon is a DwykaResources Limited Director and meets the criteria of a qualified person underthe AIM guidance note for mining, oil and gas companies. Ed Nealon consents to the inclusion in this announcement of such information inthe form and context in which it appears. For further information please contact: In South AfricaTerry McConnachieDwyka Resources Limited(+27 11) 803 721 In AustraliaMelissa SturgessDwyka Resources Limited(+618) 9324 2955 In United KingdomRichard BrownAmbrian Partners Limited(+44) 20 7776 6417 Charlie Geller/Leesa PetersConduit PR(+44) 20 7429 6604 or (+44) 7970 067 320 or visit http://www.dwyresources.com This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
1st May 20137:00 amRNSNew Presentation and Strategic Review Update
29th Apr 20137:30 amRNSQuarterly Report
25th Apr 20137:01 amRNSPresenting at Master Investor investment show
23rd Apr 20134:40 pmRNSSecond Price Monitoring Extn
23rd Apr 20134:35 pmRNSPrice Monitoring Extension
9th Apr 20134:40 pmRNSSecond Price Monitoring Extn
9th Apr 20134:35 pmRNSPrice Monitoring Extension
8th Apr 201310:45 amRNSCompletion of Tranche 2 Placement
4th Apr 20133:45 pmRNSHolding in Company
4th Apr 201311:31 amRNSCLOSING OF SHARE PURCHASE PLAN
4th Apr 201311:30 amRNSResults of GM
28th Mar 20137:02 amRNSPresentation at Proactive Investors Forum
27th Mar 20138:45 amRNSChange of Director Interest
19th Mar 20138:45 amRNSRetirement of Directors
14th Mar 201311:45 amRNSHalf Year Results
6th Mar 20139:10 amRNSSPP Documentation
6th Mar 20139:02 amRNSHolding(s) in Company (Replacement)
5th Mar 20139:31 amRNSNOTICE OF MEETING OF SHAREHOLDERS
1st Mar 20139:00 amRNSHolding(s) in Company
28th Feb 20139:35 amRNSCompletion of Tranche 1 Placement
28th Feb 20139:30 amRNSHolding in Company
21st Feb 20138:16 amRNSPlacing of £4.0 million and Share Purchase Plan
31st Jan 201311:30 amRNSDecember Quarterly Report
21st Jan 20137:00 amRNSPositive Feeder Zone Drill Update & Trading Update
17th Jan 20137:00 amRNSEthiopian Ministry Confirms DFS Compliance
6th Dec 20127:00 amRNSDFS Demonstrates Potential for 105,000oz pa
3rd Dec 20127:00 amRNSFurther high-grade gold mineralisation identified
16th Nov 20127:00 amRNSResults of Annual General Meeting
31st Oct 201212:35 pmRNSQuarterly Report to 30/09/12 (Replacement)
31st Oct 201210:20 amRNSQuarterly Report period ended 30 September 2012
24th Oct 20124:35 pmRNSPrice Monitoring Extension
15th Oct 20127:00 amRNSNotice of AGM
9th Oct 20127:00 amRNSMineral Resource Update
28th Sep 20123:45 pmRNSFinal Results
28th Aug 20127:00 amRNSTulu Kapi Project Update
2nd Aug 201211:03 amRNSHolding(s) in Company
31st Jul 201211:40 amRNSQuarterly Report for the period ended 30 June 2012
27th Jul 20127:00 amRNSHolding in Company
12th Jul 20128:41 amRNSIFC Subscription Completed - Section 708A Notice
6th Jul 20121:44 pmRNSSubmission to the Ministry of Mines
25th Jun 20127:00 amRNSExploration Drilling Update
21st Jun 20127:00 amRNSAppointment of Non-Executive Director
21st Jun 20127:00 amRNSIFC Subscription to raise GBP1.3m
11th Jun 20127:06 amRNSDFS and Exploration Update
6th Jun 20129:12 amRNSHoldings in Company
16th May 20124:40 pmRNSSecond Price Monitoring Extn
16th May 20124:36 pmRNSPrice Monitoring Extension
8th May 20128:59 amRNSHoldings in Company
4th May 20122:48 pmRNSHoldings in Company
30th Apr 20127:00 amRNSQuarterly Report 31 March 2012

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.