Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. Viewhere

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNyota Minerals Regulatory News (NYO)

  • There is currently no data for NYO

Nickel Project Update

30 Jul 2007 07:27

Dwyka Resources Limited30 July 2007 Dwyka Resources Limited ('Dwyka' or the 'Company') MUREMERA NICKEL PROJECT UPDATE Highlights - Detailed logging and sampling of UNDP core confirms presence of both nickeland copper mineralization - Petrographic analysis found that pentlandite and chalcopyrite (the minerals ofNi and Cu respectively) are present in most cases - Signing of 5,000 metre diamond drilling contract - VTEM geophysical survey commencing shortly The directors of Dwyka Resources Limited ("Dwyka or the 'Company'") are pleasedto provide an update of progress at the Company's Muremera Nickel Project ("theProject") in Burundi. Dwyka holds a 100% interest in the Muremera NickelProject through its wholly owned subsidiary, Danyland Limited ("Danyland"). The Muremera Exploration Permit is located in north-eastern Burundi and is onthe border with Tanzania where it lies adjacent to the Kabanga Nickel Project ("Kabanga") currently being developed by Xstrata Plc and Barrick Gold Limited.Kabanga currently has an inferred resource of 36mt @2.8% Ni (Xstrata NewsRelease: Toronto, February 15, 2007). The Muremera project area was previouslyexplored by the United Nations Development Programme ("UNDP") which foundseveral geophysical anomalies in Burundi along strike from Kabanga. Detailed logging and sampling of the UNDP core has now been undertaken. Twelvedrillholes were logged, sampled and petrographically analysed. Geostatisticalanalyses revealed a high correlation coefficient between the UNDP results andthe new results allowing for the combined use of the two data sets ingeochemical studies of the deposit. The petrographic analysis has found thatpentlandite and chalcopyrite (the minerals of Ni and Cu respectively) arepresent in most cases, though often fine grained. The directors of Dwykabelieve that based on these early observations there exist similarities betweenKabanga and Muremera. A 5,000 metre diamond drilling contract has been signed with Major DrillingTanzania for the Muremera Nickel project. The drilling is aimed at furtherdefining anomalies identified through previous core drilling and geophysicalwork and the analysis outlined above, and is expected to start mid August 2007. Construction of a 20 man camp at Muremera has begun and will be completed before drilling commences. The initial 5,000 metres of diamond drilling will becompleted with an UDR 200D drill rig with hole depths ranging from 500 to 1,000metres. An estimated 1,000 samples will be sent to Johannesburg, South Africafor assaying. The diamond drilling forms part of Phase 1 of the Muremera exploration programmewhich also includes an extensive VTEM geophysical survey expected to commenceSeptember 2007. Phase 1 includes airborne geophysical survey, follow up groundgeophysical survey and drilling of selected targets. The Geotech VTEM surveywill be the first VTEM with B-field survey flown in Africa. Background As previously announced, an agreement was signed between Dwyka and BHP BillitonWorld Exploration Inc "BHP Billiton" on 26th February, whereby BHP Billiton willfund up to US$5.2 million of future exploration on the Muremera project for notmore than 50% of the equity in Danyland. The first hurdle is for BHP Billiton tospend US$1.2 million to acquire a 10% equity interest in Danyland. The technical exploration and mining information contained in the aboveannouncement has been reviewed and approved by Ed Nealon, who has sufficientexperience which is relevant to the style of mineralisation and type of depositunder consideration and to the activity which he is qualified as a CompetentPerson as defined in the 2004 Edition of the 'Australasian Code for Reporting ofExploration Results, Mineral Resources and Ore Reserves'. Mr Nealon is a DwykaResources Limited Director and meets the criteria of a qualified person underthe AIM guidance note for mining, oil and gas companies. Ed Nealon consents to the inclusion in this announcement of such information inthe form and context in which it appears. For further information please contact: In South AfricaTerry McConnachieDwyka Resources Limited(+27 11) 803 721 In AustraliaMelissa SturgessDwyka Resources Limited(+618) 9324 2955 In United KingdomRichard BrownAmbrian Partners Limited(+44) 20 7776 6417 Charlie Geller/Leesa PetersConduit PR(+44) 20 7429 6604 or (+44) 7970 067 320 or visit http://www.dwyresources.com This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
29th Oct 20088:46 amRNSDwyka to Focus on Muremera Nickel Project and Rese
27th Oct 20087:09 amRNSMuremera Project Intersects Nickel in Second Phase
23rd Oct 20088:18 amRNSNotice of AGM
15th Oct 20088:27 amRNSHolding(s) in Company
17th Sep 20088:04 amRNSHolding(s) in Company
10th Sep 20087:23 amRNSDrilling at Daguma off to a P
20th Aug 20087:32 amRNSDaguma Engineering Pre-Feasib
13th Aug 20087:35 amRNSDrilling Commences at Daguma
7th Aug 20089:10 amRNSHolding(s) in Company
6th Aug 200810:02 amRNSKimCor Diamonds plc
4th Aug 200810:52 amRNSHolding(s) in Company
29th Jul 20089:58 amRNSQuarterly Report 30 June 2008
18th Jul 200810:04 amRNSDrilling and Prefeasibility t
17th Jul 20087:21 amRNSExercise of Dagum Coal Projec
9th Jul 200810:32 amRNSExtension of Stage 1 of the S
7th Jul 20088:30 amRNSHolding(s) in Company
4th Jul 20088:01 amRNSHolding(s) in Company
1st Jul 20087:10 amRNSDrilling Programme to Commenc
30th Jun 20089:10 amRNSResult of General Meeting
26th Jun 20087:32 amRNSMuremera Nickel Project Proce
16th Jun 20087:00 amRNSChange of Registered Address
12th Jun 20087:00 amRNSKimCor Update
30th May 200812:25 pmRNSNotice of Meeting
29th May 20081:30 pmRNSDaguma Coal Project - Review
28th May 20087:00 amRNSSuccessful Capital Raising of
27th May 200810:38 amRNSRe London Presentation
20th May 20087:00 amRNSServices Agreement
7th May 20087:22 amRNSPhilippines Coal Project
30th Apr 20089:33 amRNSQuarterly Report
24th Apr 20087:07 amRNSMuremera Nickel Project
21st Apr 20082:01 pmRNSDrilling Report
1st Apr 20087:00 amRNSHolding(s) in Company
14th Mar 20088:56 amRNSHalf Year Report End 311207
11th Mar 20087:00 amRNSHolding(s) in Company
29th Feb 20087:00 amRNSHolding(s) in Company
31st Jan 20087:20 amRNSQuarterly Report 31 Dec 07
21st Jan 20087:00 amRNSHolding(s) in Company
17th Jan 20087:08 amRNSProgress Muremera Nickel Proj
13th Dec 20078:10 amRNSCommencement of Drilling
11th Dec 20077:00 amRNSIssue of Shares
3rd Dec 20077:49 amRNSExploration Results
5th Nov 20077:00 amRNSHolding(s) in Company
2nd Nov 20077:00 amRNSIssue of Options
31st Oct 20077:01 amRNSQuarterly Report 30 Sept 07
30th Oct 20077:00 amRNSResignation of Director
30th Oct 20077:00 amRNSNotice of AGM
29th Oct 20077:00 amRNSHolding(s) in Company
20th Sep 20071:11 pmRNSResult of EGM
11th Sep 20077:00 amRNSCorporate Presentation
29th Aug 20071:04 pmRNSCorrection to NoM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.