Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNyota Minerals Regulatory News (NYO)

  • There is currently no data for NYO

Nickel Project Update

30 Jul 2007 07:27

Dwyka Resources Limited30 July 2007 Dwyka Resources Limited ('Dwyka' or the 'Company') MUREMERA NICKEL PROJECT UPDATE Highlights - Detailed logging and sampling of UNDP core confirms presence of both nickeland copper mineralization - Petrographic analysis found that pentlandite and chalcopyrite (the minerals ofNi and Cu respectively) are present in most cases - Signing of 5,000 metre diamond drilling contract - VTEM geophysical survey commencing shortly The directors of Dwyka Resources Limited ("Dwyka or the 'Company'") are pleasedto provide an update of progress at the Company's Muremera Nickel Project ("theProject") in Burundi. Dwyka holds a 100% interest in the Muremera NickelProject through its wholly owned subsidiary, Danyland Limited ("Danyland"). The Muremera Exploration Permit is located in north-eastern Burundi and is onthe border with Tanzania where it lies adjacent to the Kabanga Nickel Project ("Kabanga") currently being developed by Xstrata Plc and Barrick Gold Limited.Kabanga currently has an inferred resource of 36mt @2.8% Ni (Xstrata NewsRelease: Toronto, February 15, 2007). The Muremera project area was previouslyexplored by the United Nations Development Programme ("UNDP") which foundseveral geophysical anomalies in Burundi along strike from Kabanga. Detailed logging and sampling of the UNDP core has now been undertaken. Twelvedrillholes were logged, sampled and petrographically analysed. Geostatisticalanalyses revealed a high correlation coefficient between the UNDP results andthe new results allowing for the combined use of the two data sets ingeochemical studies of the deposit. The petrographic analysis has found thatpentlandite and chalcopyrite (the minerals of Ni and Cu respectively) arepresent in most cases, though often fine grained. The directors of Dwykabelieve that based on these early observations there exist similarities betweenKabanga and Muremera. A 5,000 metre diamond drilling contract has been signed with Major DrillingTanzania for the Muremera Nickel project. The drilling is aimed at furtherdefining anomalies identified through previous core drilling and geophysicalwork and the analysis outlined above, and is expected to start mid August 2007. Construction of a 20 man camp at Muremera has begun and will be completed before drilling commences. The initial 5,000 metres of diamond drilling will becompleted with an UDR 200D drill rig with hole depths ranging from 500 to 1,000metres. An estimated 1,000 samples will be sent to Johannesburg, South Africafor assaying. The diamond drilling forms part of Phase 1 of the Muremera exploration programmewhich also includes an extensive VTEM geophysical survey expected to commenceSeptember 2007. Phase 1 includes airborne geophysical survey, follow up groundgeophysical survey and drilling of selected targets. The Geotech VTEM surveywill be the first VTEM with B-field survey flown in Africa. Background As previously announced, an agreement was signed between Dwyka and BHP BillitonWorld Exploration Inc "BHP Billiton" on 26th February, whereby BHP Billiton willfund up to US$5.2 million of future exploration on the Muremera project for notmore than 50% of the equity in Danyland. The first hurdle is for BHP Billiton tospend US$1.2 million to acquire a 10% equity interest in Danyland. The technical exploration and mining information contained in the aboveannouncement has been reviewed and approved by Ed Nealon, who has sufficientexperience which is relevant to the style of mineralisation and type of depositunder consideration and to the activity which he is qualified as a CompetentPerson as defined in the 2004 Edition of the 'Australasian Code for Reporting ofExploration Results, Mineral Resources and Ore Reserves'. Mr Nealon is a DwykaResources Limited Director and meets the criteria of a qualified person underthe AIM guidance note for mining, oil and gas companies. Ed Nealon consents to the inclusion in this announcement of such information inthe form and context in which it appears. For further information please contact: In South AfricaTerry McConnachieDwyka Resources Limited(+27 11) 803 721 In AustraliaMelissa SturgessDwyka Resources Limited(+618) 9324 2955 In United KingdomRichard BrownAmbrian Partners Limited(+44) 20 7776 6417 Charlie Geller/Leesa PetersConduit PR(+44) 20 7429 6604 or (+44) 7970 067 320 or visit http://www.dwyresources.com This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
16th Oct 200612:56 pmRNS1st Quarter Results
5th Oct 20067:00 amRNSChange of Adviser
2nd Oct 20067:02 amRNSFinal Results
28th Jul 200610:02 amRNSASX Quarterly Report
27th Jul 20063:37 pmRNSChange of Adviser
26th Jul 200610:46 amRNSBEE Restructure
29th Jun 20069:06 amRNSFunding - Bosele exploration
27th Jun 200611:32 amRNSUpdate on operations
22nd May 20069:03 amRNSResults at India
4th May 20069:03 amRNSRe Joint Venture
27th Apr 20068:56 amRNS3rd Quarter Results
20th Apr 20067:00 amRNSIssue of options
12th Apr 20068:47 amRNSIssue of shares
16th Mar 20064:17 pmRNSInterim Results
13th Mar 20068:54 amRNSIndia update
8th Mar 20068:51 amRNSSale of diamonds
28th Feb 20068:53 amRNSChange of address
21st Feb 20063:15 pmRNSIssue of shares
14th Feb 20068:32 amRNSBosele update
7th Feb 20067:00 amRNSDeal on offices
6th Feb 20067:00 amRNSDiscovery at Project Bosele
31st Jan 20067:00 amRNS2nd quarter results
24th Jan 20069:38 amRNSTailings plant update
22nd Dec 20059:07 amRNSIssue of shares
21st Dec 20057:00 amRNSIssue of shares
30th Nov 20058:10 amRNSResult of AGM
21st Nov 20059:14 amRNSDirectorate Change
4th Nov 20057:00 amRNSPlacing
31st Oct 20058:51 amRNSSale of diamonds
28th Oct 20057:00 amRNS1st Quarter Results
27th Oct 20057:00 amRNSDeal with De Beers
24th Oct 200511:12 amRNSNotice of AGM
17th Oct 20059:20 amRNSRecommencement of ops
30th Sep 20058:24 amRNSFinal Results
21st Sep 20058:56 amRNSDiamond processing commences
30th Aug 200510:00 amRNSMine Update
25th Jul 20057:00 amRNS4th quarter results
22nd Jul 20057:00 amRNSTailings Treatment Update
21st Jul 20057:00 amRNSDiamond Sale
9th Jun 200510:16 amRNSDirectorate Change
31st May 20059:04 amRNSDe Beers Tailings Project
28th Apr 20058:52 amRNS3rd Quarter Results
18th Apr 20059:02 amRNSAcquisition
13th Apr 20058:51 amRNSShare and Option Plans
23rd Mar 20058:49 amRNSSale of Diamond
17th Mar 20058:30 amRNSSale of parcel of diamonds
16th Mar 20058:37 amRNSHalf yearly report
9th Feb 20059:36 amRNSAdditional Listing
31st Jan 20057:00 amRNS2nd Quarter Results
12th Jan 20052:58 pmRNSAdditional Listing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.