Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMXP.L Regulatory News (MXP)

  • There is currently no data for MXP

Operational Update

6 Jan 2011 07:00

RNS Number : 9916Y
Max Petroleum PLC
06 January 2011
 



Max Petroleum Plc

(the "Company")

 

Operational Update

 

6 January 2011

 

Max Petroleum Plc, an oil and gas exploration and development company focused on Kazakhstan, is pleased to announce an operational update of its activities in the Blocks A&E Licence area.

 

Confirmation of Uytas Oil Discovery

Initial test results from the Cretaceous reservoir in the UTS-1 discovery well indicate a 55 metre oil column with 31 metres of net oil pay. Perforations at depths ranging from 120 to 128 metres and 155 to 158 metres produced 26 degree API gravity crude oil on pump at indicative rates of approximately 24 barrels of oil per day during a brief clean-up period. The duration of the test was limited due to government regulations and the well will be placed on a 90-day long term production test after all necessary government approvals are obtained in the next few weeks.

Based on a probable oil/water contact at 161 metres as indicated by revised petrophysical analysis and current mapping, the potential oil in place for the Cretaceous reservoir is estimated to be between 85 and 135 million barrels of oil. While other Cretaceous fields in the Pre-Caspian Basin from similar depths report recovery factors between 20% to 30% of original oil in place, long-term testing and pressure analysis of the discovery well, combined with confirmation drilling and a new seismic survey specifically focused on these shallow reservoirs will be needed to more accurately define recoverable oil reserves. Enhanced recovery techniques, such as water flooding, may also be needed to improve recovery from such shallow depths with low reservoir pressure.

 

Additional intervals in the Triassic and Jurassic are currently being tested. A full update will be made as soon as the testing is complete, which is expected in the next several weeks. The Company plans to drill three confirmation wells in the first quarter of 2011 and has tendered for a ZJ-20 shallow rig to drill the wells. The Company also intends to acquire a high-fold 3D seismic survey over the Uytas structure specifically designed to image the shallow reservoirs in the field as soon as practicable.

 

TPP Extension for the Zhana Makat Field

 

Government approval has been received to extend the trial production project ("TPP") for the Zhana Makat Field for six months to 1 July, 2011. The TPP extension allows the Company to drill two additional Triassic wells in the field, which the Company intends to drill in the first quarter of 2011. The Company has filed an application to convert Zhana Makat to full field development status, which will allow the Company to develop and produce the field for up to 25 years under the terms of the Blocks A&E Licence.

 

Drilling

 

 

The ZJ-30 drilling rig is expected to spud the ALTW-1 exploration well on the West Altykol prospect and the ZJ-40 rig is expected to spud the ASK-1 well on the Asanketken prospect before 1 February 2011, after additional drilling equipment required to drill the wells is received on location. West Altykol is a Triassic prospect with a 4-way closure and Asanketken is a high potential, salt flank Triassic prospect.

 

 

Enquiries:

 

Max Petroleum Plc

 

 

Michael Young

President and Chief Financial Officer

Tel: +44 (0)20 7355 9590

 

Peter Moss

Vice President

Corporate Development and Investor Relations

 

Merlin PR

 

Tom Randell / Anca Spiridon

Tel: +44 (0)207 726 8400

WH Ireland Ltd

 

Daniel Bate

Tel: +44 (0)161 832 2174

 

Macquarie Capital Advisers

Paul Connolly / Ben Oakley

Tel: +44 (0)203 037 2000

 

Richard Hook, Chief Operating Officer of Max Petroleum, is the qualified person that has reviewed and approved the technical information contained in this announcement. Mr. Hook is a member of the Houston Geological Society and holds both Masters and Bachelors of Science degrees in geology.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBELLBFFFLBBQ
Date   Source Headline
14th Sep 20067:01 amRNSFirst Well Success
8th Sep 20064:22 pmRNS2006 Results Announcement
1st Sep 200610:17 amRNSShareholder Notification
25th Aug 20064:22 pmRNSEGM Statement
24th Aug 20065:45 pmRNSNotifiable Interest
8th Aug 20063:17 pmRNSNotifiable Interest
7th Aug 20063:51 pmRNSNotifiable Interest
3rd Aug 20067:00 amRNSAppointment of CFO
2nd Aug 20063:59 pmRNSUpsizing of Convertible Bond
2nd Aug 20067:13 amRNSConvertible Bond Offering
1st Aug 20061:18 pmRNSExercise of Options
28th Jul 20064:44 pmRNSNotifiable Interest
20th Jul 20065:17 pmRNSNotifiable Interest
20th Jul 20064:31 pmRNSOperational Update
29th Jun 200611:21 amRNSExercise of Options
28th Jun 20069:13 amRNSExercise of Options
22nd Jun 20064:33 pmRNSShallow Drilling Programme
22nd Jun 20063:35 pmRNSShallow Drilling Results
19th Jun 20064:53 pmRNSNotifiable Interest
12th Jun 20067:01 amRNSAppointment of NOMAD
9th Jun 20061:03 pmRNSExercise of Options
8th Jun 20068:58 amRNSNotifiable Interest
2nd Jun 200612:41 pmRNSNotifiable Interest
31st May 20061:20 pmRNSNotifiable Interest
25th May 20067:23 amRNSAppointment of Broker
23rd May 20067:03 amRNSNotifiable Interest
22nd May 20063:04 pmRNSOperational Update
12th May 20066:23 pmRNSShareholding/Options Exercise
27th Apr 200611:44 amRNSShareholding in Company
26th Apr 20064:33 pmRNSShareholding in Company
20th Apr 20069:00 amRNSOperations Update
11th Apr 20066:24 pmRNSHolding(s) in Company-Replace
11th Apr 20064:47 pmRNSHolding(s) in Company
31st Mar 20068:45 amRNSInterim Results
27th Mar 200611:04 amRNSBoard Appointment
27th Mar 20069:05 amRNSAppointments
21st Feb 20067:03 amRNSOperations Update
31st Jan 20067:01 amRNSOperations Report
26th Jan 20066:25 pmRNSClarification
24th Jan 20065:27 pmRNSChange of Registered Address
23rd Jan 20063:53 pmRNSShareholding in the Company
16th Jan 20067:01 amRNSCompletion of Registration
12th Jan 20061:35 pmRNSAcquisition
28th Dec 200510:52 amRNSInstitutional Placing
22nd Dec 200510:19 amRNSMedia Reports
16th Dec 20052:56 pmRNSAppointment of Joint Brokers
6th Dec 20052:11 pmRNSAcquisition
4th Nov 200512:55 pmRNSSeismic Programme
3rd Nov 20055:41 pmRNSDual Listing in Frankfurt
27th Oct 20052:48 pmRNSContract Rights registration

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.