Stefan Bernstein explains how the EU/Greenland critical raw materials partnership benefits GreenRoc. Watch the full video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMetals Exploration Regulatory News (MTL)

Share Price Information for Metals Exploration (MTL)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 4.50
Bid: 4.40
Ask: 4.60
Change: 0.00 (0.00%)
Spread: 0.20 (4.545%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 4.50
MTL Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Quarterly Update To 31 March 2019

24 Apr 2019 07:00

RNS Number : 8406W
Metals Exploration PLC
24 April 2019
 

METALS EXPLORATION PLC

 

QUARTERLY UPDATE TO 31 MARCH 2019

 

Metals Exploration plc (AIM: MTL) ("Metals Exploration", the "Company" or the "Group"), the natural resources exploration and development company with assets in the Pacific Rim region, today provides a quarterly update on matters relating to the operations of its Runruno gold project ("Runruno" or the "Project") in the Philippines.

 

Mining Operations

· Mining for the quarter of 2.93Mt with total ore mined of 573Kt.

· 14,892 oz of gold poured during the quarter.

· Key maintenance programmes have yet to commence due to working capital constraints, however, orders have been placed to begin mobile equipment rebuilds in Q2 2019.

· Average mine gold grade was 1.54 grams/tonne against a budget of 1.70 grams/tonne, reflecting the historical dilution rate of approximately 25% against a scheduled dilution of 15%.

 

Processing Operations

· Overall plant availability and gold recoveries remain a critical issue, with both measures well below the original feasibility studies.

· Gold recoveries averaged 66% in Q1, against the feasibility forecast of 90%. As a result total poured ounces of gold were below budget at 14,892.

· In addition to low gold recoveries highlighted above, maintenance issues were the key influence on production throughputs with more than two weeks lost due to ruptures in the tailings pipeline and low water availability.

· The gravity circuit has been recalibrated with 37% gold recoveries being achieved during the quarter.

· BIOX operated at 65% of design capacity during the quarter.

· Oxidation rates are still below design for the quarter, at 78%.

 

Finance and corporate

· 15,293 ounces of gold were sold during the quarter at an average realised gold price of US$1,309 per ounce.

· Discussions with the Group's lenders are ongoing to restructure the Group's overall debt position.

· A standstill from making principal and interest payments is currently in place until 2 May 2019.

· Cash at bank at 31 March 2019 was US$3.34 million.

· Darren Bowden appointed as the CEO and Executive Director on the 3 January 2019.

· Guy Walker appointed as an interim Chairman and Mike Langoulant as interim CFO.

· Restructure of Processing Plant Management and appointment of Xiaofeng Zheng as General Manager - Technical.

· Andrew Crawford appointed as Plant Manager.

· Ian Holzberger and Eduard Simovici resigned as directors, while Andrew Rogers stepped down as CFO.

 

 

 

Production and Finance Summary

 

Runruno Project Report

Quarter

YTD

March YTD ($USD)

Actual

Actual

PHYSICALS

Units

Q1 2019

3 Months

Mining

Ore Mined

tonnes

573,300

573,300

Waste Mined

tonnes

2,358,474

2,358,474

Total Mined

tonnes

2,931,775

2,931,775

Au Grade Mined

g/tonne

1.54

1.54

Strip Ratio

4.11

4.11

Processing

 

Ore Milled

tonnes

413,606

413,606

 

Au Grade

g/tonne

1.70

1.70

 

S2 Grade

%

1.12

1.12

 

Au Milled

ounces

22,585

22,585

 

Recovery

%

66.66

66.66

 

Au Recovered

ounces

15,637

15,637

 

Au Poured

ounces

14,892

14,892

 

Sales

 

Au Sold

ounces

15,293

15,293

 

Au Price

$US/oz

1,309

1,309

 

FINANCIALS

 

Revenue

 

Gold Sales

(000's)

19,996

19,996

 

Operating Costs - Summary

 

Mining

(000's)

5,986

5,986

 

Processing

(000's)

6,041

6,041

 

G&A

(000's)

1,955

1,955

 

Total Operating Costs

13,982

13,982

 

Excise Duty

(000's)

800

800

 

Other Philippine costs

(000's)

952

952

 

Total Direct Production Costs

(000's)

15,734

15,734

 

Net Income

(000's)

4,263

4,263

 

Total Capital Costs

(000's)

753

753

 

Total non-cash costs

(000's)

8,036

8,036

 

Free Cashflow

($'000)

3,510

3,510

 

Cash Cost / oz Sold - C1

US$/oz

961

961

 

Cash Cost / oz Sold - AISC at Philippine level

US$/oz

1,125

1,125

 

 

 

Mining Operations

 

Although mining performed better throughout the quarter, achieving production of 2.93Mt, actual mine dilution rates continue to be significantly higher than forecast. The average mine gold grade was 1.54 grams/tonne against a budget of 1.70 grams/tonne. The higher average dilution is reflective of the historical mining results and is expected to continue. These increased mine dilution rates of 25% have been adopted in the Company's new internal forecasts, so that the plant feed grades and forward production can be more accurately budgeted.

 

Critical maintenance has been deferred due to working capital constraints. However, these activities will commence in Q2 2019, with a programme of major component rebuilds for mobile equipment. This will reduce equipment availability in the short term.

 

Reconciliation of the overall resource grade versus actual production remains at 96% of ounces recovered although at a higher than previously planned dilution rate as noted above. However, during Q1 2019, there has been an overall reducing trend in resource recovery in Stage 2 of the mine plan with an overall resource recovery of 80% in Stage 2. It is unclear if this is a reflection of the current mining position in the mine plan sequence or the confidence associated with drill spacing. A programme of infill resource and mine plan drilling has been designed and budget allocated to seek to improve the short-term model confidence in mine plan Stages 1, 1.5 and 2.

 

Process Plant

 

Process plant operations have focused on the recovery shortfalls in both the flotation and carbon in leach (CIL) circuits. Technical surveys have been conducted in milling, flotation and CIL which have provided a better understanding of the shortfalls and design issues associated with each of the circuits. It is clear that the flotation circuit is under-designed for the current throughput, with a design ore retention time of 35 minutes against the currently estimated retention requirement of approximately 2 hours. The milling circuit operations will be enhanced by the commissioning of the variable speed drive on the SAG mill during Q2. The CIL circuit has good kinetics and the directors believe that the design capacity is sufficient to meet throughput needs, however, oxidation rates in BIOX® need to reach design if the circuit is to ever achieve the targeted 96% recovery.

 

There remains an unaccounted discrepancy between calculated metallurgical recovery and gold poured of between 15% and 20%, which the Company is working diligently to understand. This requires a better understanding of the metallurgical balance, more robust sampling practices and better integrated metering and measuring systems throughout the plant.

 

The BIOX® circuit remained relatively stable during the quarter, operating at 65% of design. Throughput rates of over 80% of contained sulphur units in the BIOX® ore feed against sulphur design units were consistently achieved during Q1 2019 and a steady state of 80% of design was achieved for a two-week period.

 

The key processing issue affecting the process plant during the first quarter 2019, was foaming in BIOX®, which also then affected all downstream processes and recoveries. As throughput rates of contained sulphur introduced into BIOX® were increased the foaming worsened. The directors believe that the incremental energy in the BIOX® reactors causes the increased foam and operations are being adjusted to address this issue. This energy-related reaction is being adjusted and technical experts from the BIOX® licencing company will be onsite in Q2 2019 to assist with this issue.

 

Plant availability was seriously impacted over the period by a number of failures in the tailings pipeline, which led to approximately 300 hours of plant downtime. These failures have been repaired but detailed inspections are being urgently carried out across the pipeline and a number of critical areas have been identified for immediate repair or rotation. Notwithstanding, downtime due to tailings pipeline failures has continued into Q2 2019. Also a lack of suitable water to feed into the processing unit was also a contributing factor to lost plant availability. Although this issue remains, access to alternative suitable process water sources are being implemented.

 

 

Review of Processing, New Business Plan and Management Changes

 

In conjunction with the appointment of Darren Bowden as CEO, the Company has begun a restructuring of the Processing Plant Management Team as part of a wider 'Business Plan Review' for Runruno. The initial phase of the review is expected to be completed in June 2019.

 

Xiaofeng Zheng has joined the Company recently as VP Technical. Xiaofeng has a PhD degree in flotation from Julius Kruttschnitt Mineral Research Centre (JKMRC), University of Queensland, Australia, and has published over 20 papers in conference proceedings and international journals. In addition, Andrew Crawford has been appointed the Plant Manager at Runruno. Andrew has 27 years mineral processing experience and holds a Bachelor of Engineering (Honours) and Metallurgical Engineering from the Royal Melbourne Institute of Technology. The new team also includes a BIOX® specialist Nicolas Holder who holds a degree in Microbiology and previously worked for BioMin, the developer of the BIOX® technology, and a new Operations Manager, Craig Jacobson.

 

The Company's Mine Operations team has commenced a mine design consultation with Xenith Consulting to complete a review of the mine geotechnical, mine design, backfill strategy, mine plan and equipment requirements. The update to the mine design will incorporate a review of the current east wall design and the overall pit void optimisation. The objective of this work is to provide Mine Operations with a better designed and sequenced mine plan, integrated with an optimised backfill strategy.

 

The key focus of the plant upgrade and design requirements revolve around ore variability and flotation capacity. The plant was designed for a highly refractory gold ore, which is considered to only make up around 40% of the ore body. The other 60% of the ore body is highly variable, with less of an association between gold and refractory sulphide. This means that the current flotation capacity, designed for 35 minutes of ore flotation retention is inadequate. This issue can be dealt with in two ways, either to upgrade the flotation line, to include more retention capacity, or extract a higher gold component in the milling circuit. Both options, flotation and flash flotation, are currently being studied alongside the associated capital expenditure.

 

Residual Storage Impoundment ("RSI")

 

The RDL (Residue Line) experience major disruptions during the latter part of the quarter and had a significant effect on production as noted above.

 

RWL (Return Water Line) functioned well, despite a shortage of water, due to the start of the hot summer season, with low water levels in the upstream creek. As a result, the Company has been working on a means of supplementing the upstream water source supply. Accordingly, during the quarter, the Company has installed the RWL to enable the RSI water to be returned back into the process plant.

Construction of the next raise of the RSI continues and the upper embankment was raised up to the level that allows for the installation of a bituminous liner in Q2 2019.

 

Occupational Health & Safety

 

Runruno accumulated a total of 795,531 safe man hours and as of March 2019, the overall man hours is 7,237,505 without Lost Time Incident (LTI).

 

There was a continuous drop in incidence rate for the period covered, with the average incidence rate for Q1 2019 being 4.36 per month. System failures were the leading cause of incidents, which accounted for 25% of incidents, leading to first aid (21% of incidents) and near miss/property damaged (19% of incidents).

 

Environment and Compliance

 

The mine has been compliant with no outstanding issues. Compliance matters are fully embraced by the Runruno workforce and never taken for granted.

 

Community & Government Relations

 

Productive relations with both the community and the government continue. However the Company is in consultation with the government in relation to the impending need to remove illegal miners, their infrastructure and dwellings from those areas scheduled to be mined as part of Mine Plan Stages 3 and 4. Resettlement activities are expected to commence in Q3 of 2019.

 

Director Changes

 

Mr Darren Bowden accepted the position of Director and Chief Executive Officer of the Company on 3 January 2019. On 24 January 2019, the Company announced that Mr Ian Holzberger had stepped down from Chairman of the board of directors and was replaced temporarily by Mr Guy Walker. Andrew Stancliffe was appointed as a non-executive director on 5 February 2019, replacing Eduard Simovici. Further, Mike Langoulant replaced Andrew Rogers as CFO on 28 February 2019, and Ian Farrelly replaced Liam Ruddy as Company Secretary on 15 February 2019.

 

Finance (Unaudited)

· 15,293 ounces of gold was sold during the quarter, at an average realised gold price of US$1,309 per ounce;

· Interest payments of US$969,500 were made to the senior lenders in the quarter;

· A capital payment of US$500,000 was made to the senior lenders in the quarter;

· A standstill agreement has been entered into with both the Group's Senior and Mezzanine Lenders. Under this standstill agreement, the Group is not required to make interest or principal payments to either the Senior or Mezzanine Lenders until 2 May 2019. The aim of this standstill is to provide time for all parties to consider debt restructuring options;

· Total interest-bearing liabilities as at 31 March 2019 were US$114.1 million; and

· Cash at bank at 31 March was US$3.34 million.

 

 

- END -

 

Mr Darren Bowden, a director of the Company, a Member of the Australasian Institute of Mining and Metallurgy and who has been involved in the mining industry for more than 25 years, has compiled, read and approved the technical disclosure in this regulatory announcement.

 

 

Forward Looking Statements

Statements relating to the estimated or expected future production, operating results, cash flows and costs and financial condition of Metals Explorations, planned work at the Company's projects and the expected results of such work are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by words such as the following: expects, plans, anticipates, forecasts, believes, intends, estimates, projects, assumes, potential and similar expressions. Forward-looking statements also include reference to events or conditions that will, would, may, could or should occur. Information concerning exploration results and mineral reserve and resource estimates may also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed.

 

These forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable at the time they are made, are inherently subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from logistical, technical or other factors; the possibility that results of work will not fulfil projections/expectations and realize the perceived potential of the Company's projects; uncertainties involved in the interpretation of drilling results and other tests and the estimation of gold reserves and resources; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of environmental issues at the Company's projects; the possibility of cost overruns or unanticipated expenses in work programs; the need to obtain permits and comply with environmental laws and regulations and other government requirements; fluctuations in the price of gold and other risks and uncertainties.

 

For further information please visit or contact www.metalsexploration.com

 

Darren Bowden (Chief Executive Officer)

+57 310 230 1620

Michael Langoulant (Interim CFO)

+44 (0) 7899 249990 

 

Nominated & Financial Adviser and Broker: STRAND HANSON LIMITED

James Spinney, James Dance, Eric Allan

+44 (0) 207 409 3494

Public Relations: TAVISTOCK

Barnaby Hayward, Jos Simson

+44 (0) 207 920 3150

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDSEAFLDFUSESL
Date   Source Headline
27th Mar 20247:00 amRNSUpdate on Debt Facilities
18th Mar 20247:00 amRNSAppointment of Chairman
5th Feb 202412:01 pmRNSInvestor Presentation
24th Jan 20247:00 amRNSQuarterly Update to 31 December 2023
12th Jan 20247:00 amRNSAcquisition of Prospective Philippine Exploration
14th Dec 20232:00 pmRNSExercise of Options and Total Voting Rights
11th Dec 20237:00 amRNSReceipt of Awards
1st Dec 20237:00 amRNSAppointment of New Auditor
17th Oct 20237:00 amRNSQuarterly Update To 30 September 2023
27th Sep 20237:00 amRNSInterim Results
18th Sep 20237:00 amRNSDirector Resignation
20th Jul 20237:00 amRNSQuarterly Update to 30 June 2023
19th Jun 20234:45 pmRNSResult of AGM
22nd May 20234:30 pmRNSPosting of Annual Report and Notice of AGM
16th May 20237:00 amRNSFinal Results for the Year Ended 31 December 2022
9th May 202310:51 amRNSMine Site Incident
28th Apr 20237:00 amRNSQuarterly update to 31 March 2023
31st Jan 202311:05 amRNSSecond Price Monitoring Extn
31st Jan 202311:00 amRNSPrice Monitoring Extension
31st Jan 20237:00 amRNSQuarterly Update to 31 December 2022
9th Nov 20227:00 amRNSReceipt of Presidential Award
14th Oct 20227:00 amRNSQuarterly Update to 30 September 2022
14th Sep 20227:00 amRNSInterim Results
29th Jul 20228:56 amRNSReduction of Capital Effective
21st Jul 20227:00 amRNSUpdate on Reduction of Capital
20th Jul 20227:00 amRNSQuarterly Update to 30 June 2022
17th Jun 20223:26 pmRNSResult of AGM
16th May 20227:01 amRNSProposed Capital Reorganisation & Notice of AGM
16th May 20227:00 amRNSFinal Results for the Year Ended 31 December 2021
5th May 20227:00 amRNSAppointment of Non-Executive Director
25th Apr 20227:00 amRNSQuarterly update to 31 March 2022
14th Feb 20227:00 amRNSUpdated Mineral Resource and Ore Reserve Estimate
11th Feb 20227:00 amRNSInvestor Presentation
21st Jan 20227:00 amRNSQuarterly update to 31 December 2021
18th Oct 20217:00 amRNSQuarterly Update to 30 September 2021
20th Sep 20217:00 amRNSInterim Results for Six Months Ended 30 June 2021
1st Sep 20217:00 amRNSDirectorate Changes
27th Jul 202111:05 amRNSSecond Price Monitoring Extn
27th Jul 202111:00 amRNSPrice Monitoring Extension
27th Jul 20217:00 amRNSQUARTERLY UPDATE TO 30 JUNE 2021
1st Jul 20214:51 pmRNSHolding(s) in Company
30th Jun 20214:44 pmRNSResult of AGM
17th Jun 20212:00 pmRNSAnnual General Meeting Arrangements
7th Jun 202112:46 pmRNSPosting of Annual Report and Notice of AGM
25th May 20217:00 amRNSInvestor Presentation
21st May 20217:00 amRNSFinal Results for the year ended 31 December 2020
18th May 20217:00 amRNSUpdated Website, Presentation & Broker Research
17th May 20212:06 pmRNSSecond Price Monitoring Extn
17th May 20212:00 pmRNSPrice Monitoring Extension
22nd Apr 20217:00 amRNSAppointment of Non-Executive Directors

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.