Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPetro Matad Regulatory News (MATD)

Share Price Information for Petro Matad (MATD)

Share Price is delayed by 15 minutes
Get Live Data
1.175    0.00 (0.00%)
Bid:
1.15
Ask:
1.20
Spread: 0.05 (4.348%)
Market Cap: £21.61m
MATD Live PriceLast checked at - London Stock Exchange

Intraday Petro Matad Share Chart

Operational Update - DT9

30 Aug 2011 07:00

RNS Number : 1971N
Petro Matad Limited
30 August 2011
 



 

 

Petro Matad Limited ("Petro Matad" or the "Company")

Operational Update - DT-9 testing

 

Petro Matad provides an update on its operations at its Davsan Tolgoi Project, part of the Company's Production Sharing Contract (PSC) on Block XX in eastern Mongolia.

 

The testing programme on the Company's DT-9 well has been completed, with only water being produced from the most promising interval of the well in a valid test of reservoir fluids. The water produced is approximately five times fresher than that normally observed in the Tsagaantsav Formation, and it is believed that this phenomenon led to the incorrect estimation of net pay from the pre-test wireline logs which were announced by the Company on 22 August.

 

The DT-9 well reached its total depth of 1,766m on 16 August. The well encountered live oil shows at the top of the Lower Tsagaantsav and wireline logs identified a principal calculated pay zone between 1,639 and 1,651m depth that was accompanied by oil stain in samples and slightly elevated gas readings.

 

At that time, high apparent hydrocarbon saturations were calculated from the DT-9 wireline logs using a reservoir water salinity of 8,550 ppm NaCl equivalent. This salinity is consistent with measured salinity of the Tsagaantsav waters that were recovered from initial testing of DT-1. That benchmark is also within the 4,700 - 14,000 ppm range of wireline log salinities for the Davsan Tolgoi area, as calculated in-house and corroborated by two independent petrophysical consultants. Water salinities reported in 2005 by SOCO International from Block XIX Tsagaantsav reservoirs are also within that range. The actual formation waters recovered from DT-9 were approximately 1,700 ppm NaCl equivalent. This unprecedented fresh water occurrence in the local Tsagaantsav reservoir is currently considered to be the likely cause of the error in the original estimate of net pay from the pre-test wireline logs.

 

Unlike DT-1 water recoveries, as detailed in a contemporaneous News Release, the DT-9 waters represent a valid test of formation waters that were recovered at a rate of 200 barrels per day from a 14 hour swab test across from a zone of good bonding and zone isolation on the cement bond log. Water production from the DT-1 test is compromised by non-Tsagaantsav sources due to mechanical complications of the cementing job, as reported in the Company's other News Release of this time.

 

Geological and 3D seismic reviews confirm that DT-9 well was drilled on a small fold closure that was superimposed on a larger hanging wall fault trap that is isolated from other Shoroo Prospect drilling targets and from the other DT well series drilled to date. The live oil shows from 1,597-1,601m in DT-9 indicates that the fold closure at the top of the Lower Tsagaantsav objective formed a small but effective trap. However, the reservoir quality of this interval did not merit testing.

 

In contrast, the deeper, thicker, and more porous 1,639-1,651m test interval in DT-9 relied on a hanging wall fault seal of the Tsagaantsav against highly fractured footwall basement rocks across a large displacement fault. DT-9 is the first well the Company has drilled to test this trap style. Block XIX analyses demonstrate that waters from fractured basement rocks are exceedingly fresh. Thus the conclusion at this stage is that footwall basement fractures are the likely source of the waters tested in DT-9. Accordingly, when assessing future drilling locations higher risk will be assigned to any that rely on hanging wall traps against footwall basement rocks.

 

Petro Matad CEO Doug McGay said "While very disappointing, DT-9 was in both a separate structure and a different reservoir than previously drilled locations on Davsan Tolgoi. Thus the test failure is not seen as an adverse judgement on the overall Davsan Tolgoi complex.

 

"The inaccurate results of the petrophysical calculations of the net pay zone as originally announced are regrettable but understandable, given the factor of the presence of unprecedented fresh water."

 

"The Company views the DT-9 results a part of our growing understanding of the Davsan Tolgoi complex, in which we maintain faith as a viable exploration and appraisal project."

 

 

Technical information in this news release has been reviewed by the Company's Exploration Manager, Dr James Coogan. Dr Coogan is a petroleum geologist with 30 years of experience in North American and international exploration and development. He is a member of the American Association of Petroleum Geologists and the Geological Society of America.

 

About Petro Matad Limited

 

Petro Matad is the parent company of a group focussed on oil exploration, as well as future development and production in Mongolia. The Group holds the sole operatorship of three Production Sharing Contracts with the Government of Mongolia. The principal asset is the PSC for Block XX, a petroleum block of 10,340km² in the far eastern part of the country. The two other Blocks, IV and V are located in central Mongolia and jointly cover 71,040km².

 

Petro Matad Limited is incorporated in the Isle of Man under company number 1483V. Its registered office is at Victory House, Prospect Hill, Douglas, Isle of Man, IM1 1EQ.

 

 

Further information:

 

Petro Matad Limited

Douglas J. McGay - CEO

+976 11 331099

 

Westhouse Securities Limited

Richard Baty/Petre Norton

+44 (0)20 7601 6100

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLEASPEDDSFEEF
Date   Source Headline
28th May 202612:00 pmRNSResult of AGM
28th May 20267:00 amRNSOperational Update
15th May 20267:00 amRNSNotice of AGM Logistics
30th Apr 20267:00 amRNSNotice of AGM
18th Feb 20267:00 amRNSPetro Matad Operational Update
13th Jan 20267:00 amRNSBoard Changes
12th Dec 20257:00 amRNSOperational Update
10th Dec 20257:00 amRNS-RInvestor Presentation
5th Nov 20257:00 amRNSOperational Update
9th Oct 20257:00 amRNSOperational Update
29th Sep 20257:05 amRNSInterim results for six months ended 30 June 2025
29th Sep 20257:00 amRNSH1 Production Operations and Well Testing Update
24th Sep 20257:00 amRNSOperational Update
26th Aug 20257:00 amRNSOperational Update
30th Jul 20257:00 amRNSOperational Update
23rd Jul 202512:00 pmRNS-RInvestor Presentation
16th Jul 20257:00 amRNSResult of Retail Offer
11th Jul 20257:05 amRNSRetail Offer
11th Jul 20257:00 amRNSResults of Placing and Subscription
10th Jul 20254:35 pmRNSProposed Capital Raising
26th Jun 20254:58 pmRNSFinal results year ended 31 Dec 2024 - Replacement
26th Jun 20257:00 amRNSFinal results for year ended 31 December 2024
18th Jun 20257:00 amRNSProduction Revenue Received
30th May 20257:00 amRNSOperational Update
28th Apr 20257:00 amRNSSignature of Oil Sales Agreement
13th Mar 202510:40 amRNSResult of AGM
13th Mar 20257:00 amRNSOperational Update
28th Feb 20257:00 amRNSNotice of AGM Logistics
14th Feb 20257:00 amRNSNotice of AGM
5th Feb 20257:00 amRNSCertification of Block XX Exploitation Area
16th Jan 20257:00 amRNSOperational Update
14th Nov 20247:00 amRNSOperational Update
25th Oct 20247:00 amRNSProduction startup at Heron-1
22nd Oct 20247:00 amRNSPlanned production startup at Heron-1
7th Oct 20247:00 amRNSOperational Update
1st Oct 20247:07 amRNSHeron-2 drilling results
23rd Sep 20247:00 amRNSSpud of Gobi Bear-1 exploration well
19th Sep 20247:02 amRNSInterim results for six months ended 30 June 2024
19th Sep 20247:00 amRNSHeron-1 operational update
9th Sep 20247:00 amRNSOperational Update – Spud of Heron-2
22nd Aug 20247:00 amRNSOperational Update
23rd Jul 20247:00 amRNSCommencement of Heron-1 Completion Operations
10th Jul 20247:00 amRNSInvestor Presentation & Forward Work Programme
1st Jul 20247:00 amRNSResult of Retail Offer
28th Jun 20247:00 amRNSIssue of equity
26th Jun 20247:00 amRNSRetail Offer
26th Jun 20247:00 amRNSResults of Capital Raise
25th Jun 20244:40 pmRNSProposed fundraise to raise up to USD$8.5 million
19th Jun 20247:00 amRNSFinal results for year ended 31 December 2023
29th May 202411:32 amRNSOperational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.