Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPetro Matad Regulatory News (MATD)

Share Price Information for Petro Matad (MATD)

Share Price is delayed by 15 minutes
Get Live Data
1.125    0.00 (0.00%)
Bid:
1.10
Ask:
1.15
Spread: 0.05 (4.545%)
Market Cap: £20.91m
MATD Live PriceLast checked at - London Stock Exchange

Intraday Petro Matad Share Chart

Operational Update - DT9

30 Aug 2011 07:00

RNS Number : 1971N
Petro Matad Limited
30 August 2011
 



 

 

Petro Matad Limited ("Petro Matad" or the "Company")

Operational Update - DT-9 testing

 

Petro Matad provides an update on its operations at its Davsan Tolgoi Project, part of the Company's Production Sharing Contract (PSC) on Block XX in eastern Mongolia.

 

The testing programme on the Company's DT-9 well has been completed, with only water being produced from the most promising interval of the well in a valid test of reservoir fluids. The water produced is approximately five times fresher than that normally observed in the Tsagaantsav Formation, and it is believed that this phenomenon led to the incorrect estimation of net pay from the pre-test wireline logs which were announced by the Company on 22 August.

 

The DT-9 well reached its total depth of 1,766m on 16 August. The well encountered live oil shows at the top of the Lower Tsagaantsav and wireline logs identified a principal calculated pay zone between 1,639 and 1,651m depth that was accompanied by oil stain in samples and slightly elevated gas readings.

 

At that time, high apparent hydrocarbon saturations were calculated from the DT-9 wireline logs using a reservoir water salinity of 8,550 ppm NaCl equivalent. This salinity is consistent with measured salinity of the Tsagaantsav waters that were recovered from initial testing of DT-1. That benchmark is also within the 4,700 - 14,000 ppm range of wireline log salinities for the Davsan Tolgoi area, as calculated in-house and corroborated by two independent petrophysical consultants. Water salinities reported in 2005 by SOCO International from Block XIX Tsagaantsav reservoirs are also within that range. The actual formation waters recovered from DT-9 were approximately 1,700 ppm NaCl equivalent. This unprecedented fresh water occurrence in the local Tsagaantsav reservoir is currently considered to be the likely cause of the error in the original estimate of net pay from the pre-test wireline logs.

 

Unlike DT-1 water recoveries, as detailed in a contemporaneous News Release, the DT-9 waters represent a valid test of formation waters that were recovered at a rate of 200 barrels per day from a 14 hour swab test across from a zone of good bonding and zone isolation on the cement bond log. Water production from the DT-1 test is compromised by non-Tsagaantsav sources due to mechanical complications of the cementing job, as reported in the Company's other News Release of this time.

 

Geological and 3D seismic reviews confirm that DT-9 well was drilled on a small fold closure that was superimposed on a larger hanging wall fault trap that is isolated from other Shoroo Prospect drilling targets and from the other DT well series drilled to date. The live oil shows from 1,597-1,601m in DT-9 indicates that the fold closure at the top of the Lower Tsagaantsav objective formed a small but effective trap. However, the reservoir quality of this interval did not merit testing.

 

In contrast, the deeper, thicker, and more porous 1,639-1,651m test interval in DT-9 relied on a hanging wall fault seal of the Tsagaantsav against highly fractured footwall basement rocks across a large displacement fault. DT-9 is the first well the Company has drilled to test this trap style. Block XIX analyses demonstrate that waters from fractured basement rocks are exceedingly fresh. Thus the conclusion at this stage is that footwall basement fractures are the likely source of the waters tested in DT-9. Accordingly, when assessing future drilling locations higher risk will be assigned to any that rely on hanging wall traps against footwall basement rocks.

 

Petro Matad CEO Doug McGay said "While very disappointing, DT-9 was in both a separate structure and a different reservoir than previously drilled locations on Davsan Tolgoi. Thus the test failure is not seen as an adverse judgement on the overall Davsan Tolgoi complex.

 

"The inaccurate results of the petrophysical calculations of the net pay zone as originally announced are regrettable but understandable, given the factor of the presence of unprecedented fresh water."

 

"The Company views the DT-9 results a part of our growing understanding of the Davsan Tolgoi complex, in which we maintain faith as a viable exploration and appraisal project."

 

 

Technical information in this news release has been reviewed by the Company's Exploration Manager, Dr James Coogan. Dr Coogan is a petroleum geologist with 30 years of experience in North American and international exploration and development. He is a member of the American Association of Petroleum Geologists and the Geological Society of America.

 

About Petro Matad Limited

 

Petro Matad is the parent company of a group focussed on oil exploration, as well as future development and production in Mongolia. The Group holds the sole operatorship of three Production Sharing Contracts with the Government of Mongolia. The principal asset is the PSC for Block XX, a petroleum block of 10,340km² in the far eastern part of the country. The two other Blocks, IV and V are located in central Mongolia and jointly cover 71,040km².

 

Petro Matad Limited is incorporated in the Isle of Man under company number 1483V. Its registered office is at Victory House, Prospect Hill, Douglas, Isle of Man, IM1 1EQ.

 

 

Further information:

 

Petro Matad Limited

Douglas J. McGay - CEO

+976 11 331099

 

Westhouse Securities Limited

Richard Baty/Petre Norton

+44 (0)20 7601 6100

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLEASPEDDSFEEF
Date   Source Headline
1st Dec 20177:01 amRNSTermination of Bergen financing facility
22nd Nov 20177:00 amRNSFurther re Directorate
21st Nov 20177:00 amRNSSinopec Drilling Rig Contract Amendment
14th Nov 20177:00 amRNSGAP Investment Forum and New Investor Presentation
25th Oct 20177:00 amRNSAppointment of CEO
24th Oct 20177:20 amRNSOperational update - 3D seismic campaign
4th Oct 20177:00 amRNSSeismic Acquisition Campaign
19th Sep 20177:52 amRNSOperational Update and Board Change
11th Sep 20175:00 pmRNSHolding(s) in Company
11th Sep 20177:00 amRNSDirectorate Change
1st Sep 20172:29 pmRNSIssue of Equity
1st Sep 20178:52 amRNSHalf-year Report
22nd Aug 20179:01 amRNSHolding(s) in Company
15th Aug 20177:00 amRNSUpdate re. Financing Agreement
14th Aug 20177:00 amRNSHolding(s) in Company
25th Jul 20174:50 pmRNSTransactions by Director
20th Jul 20174:43 pmRNSHolding(s) in Company
18th Jul 20179:49 amRNSIssue of Equity
10th Jul 20177:00 amRNSCorporate Presentation
5th Jul 20177:00 amRNSDrilling Rig Contract and Drilling Targets
29th Jun 20178:05 amRNSFinal Results
21st Jun 20178:15 amRNSHolding(s) in Company
15th Jun 20177:08 amRNSBlock IV and V PSC Extensions
13th Jun 201711:36 amRNSIssue of Equity
31st May 20179:19 amRNSDrilling Contract Award
8th May 20177:00 amRNSFinancing Agreement with Bergen
21st Apr 20178:58 amRNSPSC extension, updates on rig contract and farmout
4th Apr 20171:09 pmRNSDrilling rig and services tender update
24th Mar 201711:13 amRNSDirector/PDMR Shareholding and Total Voting Rights
10th Mar 20178:17 amRNSDirectorate change, tender & farmout update
1st Feb 20178:29 amRNSCompletion of Reassignment
27th Jan 20178:20 amRNSRelease of Rig Tender and Company Update
18th Jan 20178:19 amRNSSigning of Protocols of Reassignment
12th Jan 20172:04 pmRNSStmnt re Share Price Movement
10th Jan 20177:00 amRNSUpdate re payment from Shell
15th Dec 20168:52 amRNSGovernment Approval of Reassignment of Interest
9th Dec 201611:55 amRNSShare Price Movement and Result of AGM
16th Nov 20168:07 amRNSPETEX conference and Update
10th Nov 20163:03 pmRNSNotice of AGM
3rd Nov 20167:00 amRNSOperational Update
26th Aug 20167:00 amRNSInterim results
11th Aug 201612:43 pmRNSFinancial Update
5th Aug 20169:30 amRNSFinancial Update
30th Jun 20163:56 pmRNSFinal results for year ended 31 December 2015
30th Jun 20163:55 pmRNSFinancial and Operational Update
26th May 20168:52 amRNSHolding(s) in Company
19th May 20169:12 amRNSHolding(s) in Company
29th Apr 201612:17 pmRNSPartner Exit from Blocks IV and V in Mongolia
5th Feb 20169:57 amRNSResult of AGM
3rd Feb 20168:57 amRNSOperational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.