Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Resources Limited Regulatory News (LND)

Share Price Information for Landore Resources Limited (LND)

Share Price is delayed by 15 minutes
Get Live Data
1.85    0.00 (0.00%)
Bid:
1.70
Ask:
2.00
Spread: 0.30 (17.647%)
Market Cap: £6.87m
LND Live PriceLast checked at - London Stock Exchange

Intraday Landore Resources Limited Share Chart

Junior Lake Update

14 Mar 2016 07:00

RNS Number : 8973R
Landore Resources Limited
14 March 2016
Β 

LANDORE RESOURCES LIMITED

(AIM Ticker: LND.L)

Β Β 

Β 

DRILLING INTERSECTS SIGNIFICANT NEW GOLD ZONE

JUNIOR LAKE PROPERTY

Β 

Β 

London, United Kingdom - March 14 2016 - Landore Resources Limited (AIM:LND) ("Landore Resources" or "the Company") is pleased to report on gold results from the fall 2015 drilling campaign completed on the Junior Lake Property, Ontario, Canada.

Β 

Highlights:

Β 

Β· Drilling in December 2015 intersected a wide zone of gold mineralisation close to surface including 31.29 metres at 1.12 grams per tonne (g/t) in drill-hole 0415-517. Higher grade intersections within the zone include 3.70 metres 4.21g/t gold in drill-hole 0415-518.

Β 

Β· Landore completed a follow up drill program in February 2016 consisting of 5 NQ diamond drill holes for a total of 564 metres (0416-519 to 523) as 50 metres step-outs to the above drill holes, all of which have intersected similar lithological units. Results are pending and will be reported when available.

Β 

Β· This new gold zone is located approximately midway along a 2.7 kilometre long, east-west trending, MaxMin geophysical anomaly (MM-7) at the western end of which is located the historical BAM gold zone discovered by Landore in 2003.

MM-7 has not previously been drill tested.

Β 

Landore completed a drilling campaign in the fall of 2015, consisting of 8 diamond drill holes for a total of 2,223 metres. Six holes were drilled on Landore's B4-7 Deposit with the last two holes, 0415-517/518, drilled to test a geophysical target located 2 kilometres to the east of the B4-7 deposit. Results for the first 6 holes were reported 18 February 2016.

Results for drill holes 0415-517/518 include:

NS Line

Drill-hole

From

Interval*

Au

No

Metres

Metres

g/t

2500E

0415-517

48.00

31.29

1.12

including

48.00

7.00

2.66

including

50.00

1.00

5.64

2500E

0415-518

20.30

30.60

0.82

including

20.30

3.70

4.21

including

22.50

0.50

12.05

including

48.00

1.00

3.20

*Β Both holes were drilled north at 45 degrees into a lithological package dipping approximately 40 degrees to the south. The actual true thickness of mineralisation is estimated to represent between 90-95% of the intervals shown in the above table.

Β 

Landore remobilised to site in mid-February to carry out additional sampling on the above holes and to complete a follow up drill program consisting of 5 NQ diamond drill-holes for a total of 564 metres (0416-519 to 523) on lines 2450E, 2500E, and 2550E to test the east, west and down dip extension of the new gold zone.

Β 

Β 

All five drill-holes intersected similar lithological units to drill-holes 0415-517/518. Results are pending and will be reported as soon as available.

Β 

See attached plan "Junior Lake Property - New Gold Zone".http://www.rns-pdf.londonstockexchange.com/rns/8973R_-2016-3-11.pdf

Β 

Planned Works:

Β 

New Gold Zone: A trenching and channel sampling program will be carried out along the 2.7 kilometre, east-west trending, MaxMin geophysical anomaly (MM-7) in Q2.

Β 

Subject to positive results from the winter 2016 drill program, further drilling will be planned to extend the new gold zone down plunge and along strike to the east and west.

Β 

B4-7 Nickel-copper-cobalt-PGE Deposit: Landore has retained RPA Inc. (RPA) of Toronto, Canada, to conduct a review of the borehole EM (BHEM) geophysical information and drilling results from the recently-completed exploration program on the B4-7 deposit area with the aim of ascertaining the works required to bring the newly identified potential B4-7 mineralisation into the formal resource. The results from this review are expected by the end of Q1.

Β 

Geotechnical Studies: In December 2015, Landore engaged WSP Canada Inc. for the completion of a geotechnical study to pre-feasibility standards for rock mechanics and open pit slope angles for the proposed B4-7 starter pit.

The full study has been received and is available on Landore's web site www.landore.comΒ 

Β 

Results of the study has given an inter-ramp angle of 59 degrees. This will allow the pit to be substantially deepened from the original 2013 design capturing far more of the ore whilst retaining the same stripping ratio.

Β 

Landore is currently seeking quotations for the completion of a pre-feasibility standard pit design. This study will incorporate the afore-mentioned pit design parameters and optimize the existing pit shell.

Β 

The Junior Lake property:

The Junior Lake property, 100% owned by Landore Resources, is located in the province of Ontario, Canada, approximately 235 kilometres north-northeast of Thunder Bay, and is host to; the B4-7 Nickel-Copper-Cobalt-PGEs resource, the recently-identified Exploration Target and the Alpha Zone. Junior Lake also contains the VW Nickel resource and numerous other highly prospective mineral occurrences including the BAM gold zone.

Β 

B4-7 Nickel-Copper-Cobalt-PGEs Resource:

Β 

RESOURCE CLASS

VOLUME

(tonnes)

GRADE

(% NiEq)

Contained Metal (tonnes NiEq)

Indicated

2,695,000

1.24

33,248

Β 

Exploration Target

1,500,000 to 2,000,000

~1.24

~20,000

Β 

The report is compliant with the requirements of National Instrument 43-101 (NI 43-101). The resource remains open down plunge at depth and along strike to the west.

Β 

Β 

VW Nickel Resource:

Β 

RESOURCE CLASS

VOLUME

(tonnes)

GRADE

(% NiEq)

Contained Metal (tonnes NiEq)

Indicated

3,730,000

0.49

21,760

Inferred

720,000

0.49

Β 

The report is to NI 43-101 standards. The deposit remains open down plunge at depth and along strike to the east and to the west.

Β 

Works completed on the Junior Lake property to date have clearly demonstrated the existence of a geological environment that is favourable for the deposition of magmatic nickel-copper sulphide mineralisation. Based on geological signatures and available geological knowledge, this favourable environment is believed to exist along a strike length of approximately 10 kilometres. At its widest, the favourable rock sequences are in the order of 1,000 to 1,500 metres in thickness.

Β 

Michele Tuomi, (P.Geo., BSc. Geology), Director/VP Exploration of Landore Resources Canada Inc. and a Qualified Person as defined in the Canadian National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in this announcement.

Β 

- ENDS -

About Landore Resources

Landore Resources is an exploration company that seeks to grow shareholder value through the acquisition, exploration and development of precious and base metal projects in eastern Canada. The Company is primarily focused on the development of the Junior Lake Nickel Project. Landore Resources has mineral rights to 6 properties in eastern Canada. The Company is headquartered in London, UK, with an exploration office located in Thunder Bay, Ontario, Canada.

Β 

For more information please contact:

Β 

Bill Humphries, Chief Executive Officer Tel: 07734 681262

Richard Prickett, Finance Director Tel: 07775 651421

Landore Resources Limited www.landore.com

Β 

Angela Hallett / James Spinney Tel: 020 7409 3494

Strand Hanson Limited

Nominated Advisor and Broker

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
MSCGGUWAWUPQGAG
Date   Source Headline
23rd May 20085:00 pmRNSDirector/PDMR Shareholding
14th May 20083:28 pmRNSResult of AGM
14th May 20087:01 amRNSAGM Statement
14th May 20087:00 amRNSDeposit-Resource Statement
30th Apr 20087:00 amRNSDrilling Report
17th Apr 20087:00 amRNSFinal Results
8th Apr 20087:01 amRNSPlacing
4th Apr 200810:25 amRNSExercise of Warrants
26th Mar 20087:00 amRNSResource Upgrade Statement
25th Mar 20081:00 pmRNSDrilling Update
11th Feb 20088:50 amRNSHolding(s) in Company
23rd Jan 20087:00 amRNSExercise and Grant of Options
10th Jan 200810:22 amRNSDirector/PDMR Shareholding
8th Jan 200812:28 pmRNSDirector/PDMR Shareholding
8th Jan 20087:00 amRNSDrilling Report
12th Dec 20079:16 amRNSHolding(s) in Company
29th Nov 20077:00 amRNSDrilling Results
3rd Oct 20078:06 amRNSProgress Report
7th Sep 20078:55 amRNSGrant of Options
4th Sep 200710:04 amRNSExercise of Options
4th Sep 20077:01 amRNSInterim Results
17th Aug 20074:44 pmRNSAIM Rule 26
31st Jul 20077:00 amRNSProgress Report
11th Jul 20077:00 amRNSProgress Report
25th Jun 20073:29 pmRNSDirector/PDMR Shareholding
5th Jun 20076:14 pmRNSHolding(s) in Company
5th Jun 20077:01 amRNSDrilling Update
1st May 200712:15 pmRNSResult of AGM
1st May 20077:01 amRNSProgress Report
17th Apr 200710:00 amRNSPlacing
3rd Apr 20075:25 pmRNSFinal Results
3rd Apr 20077:01 amRNSDrilling Report
19th Feb 20077:01 amRNSResource Statement
12th Dec 20065:15 pmRNSVoting Rights & Share Capital
16th Nov 200612:54 pmRNSPlacing
13th Nov 20067:01 amRNSProgress Report
25th Oct 200611:36 amRNSDirector/PDMR Shareholding
16th Oct 20067:00 amRNSDrilling Report
20th Sep 20064:13 pmRNSGrant of Options
15th Sep 20067:00 amRNSInterim Results
12th Sep 20067:00 amRNS2nd Interim Drilling Report
22nd Jun 20067:00 amRNSInterim Drilling Report
30th May 200610:36 amRNSDirector/PDMR Shareholding
9th May 20067:00 amRNSProgress Report
10th Apr 20067:01 amRNSFinal Results
7th Mar 20067:00 amRNSDrilling Report
7th Feb 20067:00 amRNSProgress Report
23rd Jan 20063:50 pmRNSHolding(s) in Company
8th Dec 20057:00 amRNSDrilling Update
24th Nov 20057:01 amRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.