Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Resources Limited Regulatory News (LND)

Share Price Information for Landore Resources Limited (LND)

Share Price is delayed by 15 minutes
Get Live Data
1.85    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.30 (17.647%)
Market Cap: £6.87m
LND Live PriceLast checked at - London Stock Exchange

Intraday Landore Resources Limited Share Chart

Progress Report

13 Nov 2006 07:01

Landore Resources Limited13 November 2006 13 November 2006 LANDORE RESOURCES LIMITED ("Landore") JUNIOR LAKE-NICKEL PROJECT PROGRESS REPORT Highlights: • VW Zone: Infill and extension drilling has confirmed the continuity of wide zones of sulphide mineralization, extending over 350 metres in length and up to 200 metres in depth, with assay results consistently returning grades in excess of 1% nickel . The zone is open at both ends and at depth. • Resource: Landore has engaged Engineering and Consulting Company, Scott Wilson Roscoe Postle Associates Inc (Scott Wilson RPA) of Toronto, to carry out an estimate of the mineral resources of the VW Zone. The resource will be documented in a National Instrument 43-101 (NI43-101) compliant report. • B4-7 Zone: Drilling on the historic B4-7 nickel-copper-platinum group elements (Ni-Cu-PGE) deposit, has extended the mineralization to the west with Hole 0406-93 and down dip in the eastern half with Holes 0406-94/95, with assay results returning grades of up to 2.10% nickel and 4.48 % copper in separate intersections. The deposit remains open to the west and down dip in the east. • Metallurgical studies: Composite ore samples submitted for metallurgical testing have returned good recoveries of up to 82% nickel and up to 90 % copper. Commenting on this progress report, Chairman of Landore Resources, BillHumphries, said: "The result of this summer's drilling campaign and metallurgical testing on theVW nickel deposit is very encouraging and has significantly advanced it towardsbecoming a fully proven nickel resource. Accordingly Landore has initiated aresource estimate with the aim of commencing scoping studies on the VW Projectearly in the new year. The exploration work, carried out on Junior Lake to date, continues to supportLandore's belief that this property has the potential to host significantnickel-copper resources." Junior Lake: The Junior Lake properties are located in the province of Ontario, approximately235 kilometres north-northeast of Thunder Bay and are situated within theCaribou-O-Sullivan Greenstone Belt in the Wabigoon Subprovince. During this past summer a diamond drilling campaign, totalling 11,937 metres ofNQ sized core, has been completed on the VW nickel zone, the adjacent B4-7nickel-copper deposit and other exploration targets on the Junior Lakeproperties. VW Zone Drilling: The latest drilling campaign completed on the VW zone, of 34holes for 7,478 metres, infilled the previous drilling, carried out in late2005, to approximately a 50 metre x 50 metre grid and extended the knownmineralization 100 metres to the west. Two of these holes were drilled to obtaincore for metallurgical testing. Mineralized intersections, not previously reported, include: Drill-hole From Width Nickel No Metres Metres % 0406-82 225.7 11.3 0.64 includes 229.8 3.0 1.06 0406-83 134.2 1.0 1.39 0406-86 115.4 2.2 1.65 141.6 7.2 0.41 includes 147.7 1.1 1.15 159.2 13.2 0.78 includes 165.0 5.8 0.98 0406-88 143.7 1.1 1.09 157.4 6.2 0.40 includes 158.9 0.5 1.33 194.2 8.3 0.55 includes 200.4 2.1 0.99 0406-97 96.9 1.5 1.24 120.3 4.5 0.52 0406-98 252.0 6.7 0.97 includes 252.3 0.3 3.91 includes 256.2 2.5 1.68 271.4 7.5 0.65 includes 276.0 2.8 1.11 Note: All holes drilled at 45 degrees inclination. The good results from hole 86 at the eastern extent of the present drilling andfrom hole 98 at the western extent shows the mineralization remains robust andopen in both directions and at depth. Resource Estimate: Landore has engaged Engineering Company, Scott Wilson RPA ofToronto, to carry out an estimate of the mineral resources of the VW Zone. Theresource will be documented in a National Instrument 43-101 (NI43-101) compliantreport. Following receipt of the resource statement (scheduled for early 2007), Landoreintends to initiate a 'Scoping study' for the VW Zone which will include thedetermination of drilling and metallurgical testing required to take the projectto pre feasibility status. The drilling for the next stage is scheduled to commence late March 2007. B4-7 Deposit Drilling: A total of 7 holes, for 1,562 metres of infill andextension drilling, have been completed in this campaign on the historic B4-7Ni-Cu-PGE deposit. Two of these holes were drilled to obtain core for metallurgical testing. The drilling has extended the mineralization to the west with Hole 0406-93 anddown dip in the eastern half with Holes 0406-94 and 0406-95, with assay resultsreturning grades of up to 2.10% nickel and 4.48 % copper. The deposit remainsopen to the west and down dip in the east. Mineralized intersections include: Drill-hole From Width Nickel Copper Platinum Palladium Cobalt No Metres Metres % % g/t g/t % 0406-90 47.4 18.8 0.93 0.59 0.12 0.65 0.12 0406-91 106.5 5.2 0.80 0.18 0.13 0.55 0.06 112.8 0.4 2.71 0406-92 246.3 0.9 1.02 257.6 21.4 0.83 0.50 0.16 0.78 0.07 275.7 1.0 1.05 0406-93 243.2 12.4 0.86 0.47 0.25 0.97 0.06 253.1 0.6 2.10 376.5 5.1 0.64 0.27 0.01 0.36 0.05 0406-94 87.3 4.7 0.37 0.09 0.17 1.58 0.02 141.0 10.0 0.38 0.51 0.26 0.43 0.04 includes 147.9 1.2 1.51 159.3 5.7 0.61 0.55 0.18 0.23 0.08 includes 160.2 0.3 4.48 0406-95 95.6 11.6 0.58 0.37 0.26 0.56 0.05 Note: Holes drilled between 55 and 65 degrees inclination. Metallurgical studies: Preliminary metallurgical testing, carried out oncomposite ore material from the VW Zone deposit, has returned good recoveries ofup to 82% nickel and up to 90 % copper. The next phase of metallurgical work isscheduled to commence in the second quarter of 2007. A composite of ore from the B4-7 Zone deposit has been submitted for preliminarymetallurgical testing for the recovery of Ni-Cu-PGE minerals. Results areexpected early in 2007. Exploration: A total of 16 holes, for 2,897 metres of exploration drilling, hasbeen completed on the Junior Lake properties to test prospective trends alongstrike from the VW Zone, the B4-7 Zone and other favourable targets. Encouraging results were received from the 'Zap' zone with assays returninggrades of up to 0.62% Ni and 0.35% Cu. The 'Zap' zone is adjacent to the highlyprospective Carrot top Horizon discovered in the 2005 program. In addition twoholes drilled 500 metres along strike to the west of the B4-7 depositencountered wide horizons of nickel mineralization. James Garber, (BSc. Hons. Geology, member of APGO) a Director of LandoreResources Ltd and a qualified person as defined in the Canadian NationalInstrument 43-101, has reviewed and verified all scientific or technical miningdisclosure contained in this announcement, which is stated in accordance withthe Canadian Institute of Mining Metallurgy and Petroleum. For more information please contact: Bill Humphries, Chairman Tel: 07734 681262Richard Prickett, Chief Executive Tel: 07775 651421Landore Resources Limited www.landore.com Simon Raggett Tel: 020 7409 3494Strand Partners Limited David Bick Tel: 07831 381201Holborn Public Relations Limited This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
4th Jun 20267:00 amRNS-RCorporate Presentation and Newsletter
3rd Jun 20267:00 amRNSFinal Results for the Year Ended 31 December 2025
7th May 20267:00 amRNSCorporate Update and 2026 Field Programme
5th May 20267:00 amRNSAppointment of Nominated Adviser and Joint Broker
1st May 20267:00 amRNSDirectorate change
31st Mar 20267:06 amRNS-RAwarded OJEP Grant
16th Feb 20267:00 amRNSCompletion of Storm Option Agreement
22nd Jan 20267:30 amRNSRestoration - Landore Resources Limited
22nd Jan 20267:00 amRNSUpdated Mineral Resource Estimates for Junior Lake
21st Jan 20267:00 amRNSUpdate re Suspension of Trading on AIM
2nd Jan 20267:00 amRNSUpdate on Suspension of Trading on AIM
2nd Jan 20267:00 amRNSUpdate on Suspension of Trading on AIM
11th Dec 20253:31 pmRNSTemporary Suspension of Trading on AIM
11th Dec 202512:59 pmRNSSuspension - Landore Resources Limited
3rd Dec 20257:00 amRNSStorm Enters Agreement to Sell Miminiska Project
10th Nov 20257:00 amRNSAmalgamation of Landore Canada and Lamaune
27th Oct 20257:00 amRNS£1,465,000 Equity Fundraise
17th Oct 20254:39 pmRNSExercise of Warrants and Issue of Equity
16th Oct 20257:00 amRNSAppointment of Alexander Shaw to Storm Board
29th Sep 20258:52 amRNSInterim Results
5th Aug 20254:11 pmRNSResult of Annual General Meeting
27th Jun 20256:10 pmRNSFinal Results and Notice of Annual General Meeting
18th Jun 20257:00 amRNSPositive Drill Campaign Results at BAM
6th May 20257:00 amRNSDrilling Campaign at BAM Gold Project Completed
25th Apr 20257:58 amRNSCompletion of BAM Mineral Rights Acquisition
4th Apr 20251:08 pmRNSDirector’s Dealing
26th Mar 20257:00 amRNSAcquisition of Additional BAM Mineral Rights
24th Mar 20257:00 amRNSReceipt of Option Payment from Storm
17th Mar 20257:00 amRNSDrilling Programme Commences on BAM
3rd Mar 20257:00 amRNSDrill Core Sampling Identifies Gold Upside
3rd Mar 20257:00 amRNSExercise of Warrants and Issue of Equity
12th Feb 20257:00 amRNSSampling Programme Identifies New Gold Anomalies
19th Dec 20247:00 amRNSAppointment of Joint Broker
13th Nov 20247:00 amRNSReceipt of Option Payment from Storm
30th Sep 20247:00 amRNSInterim Results to 30 June 2024
16th Sep 20247:00 amRNSBAM Gold Project Update
19th Aug 20247:00 amRNSUpdate on Option Agreement
17th Jul 20247:00 amRNSNotification of Major Holdings
16th Jul 202412:21 pmRNSCORRECTION: Notification of Major Holdings
16th Jul 20247:00 amRNSNotification of Major Holdings
12th Jul 20243:03 pmRNSNotification of Major Holdings
8th Jul 20241:23 pmRNSRESULT OF AGM, DIRECTORATE CHANGE & TVR
3rd Jul 20243:30 pmRNSOPTION AGREEMENT ON MIMINISKA LAKE & KEEZHIK LAKE
24th Jun 202412:30 pmRNSPosting of 2023 Annual Report and Notice of AGM
21st Jun 20242:30 pmRNSHolding(s) in Company
17th Jun 20247:00 amRNSFinal Results and Notice of AGM
12th Jun 20247:00 amRNSFundraise, Proposed CEO Appointment & Board Change
28th May 20247:00 amRNSStorm Option Agreement and Corporate Updates
15th Feb 20247:00 amRNS2023 Soil Sampling Identifies New Gold Trends
8th Feb 20246:09 pmRNSFurther Amendment to Storm Option Agreement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.