Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Resources Limited Regulatory News (LND)

Share Price Information for Landore Resources Limited (LND)

Share Price is delayed by 15 minutes
Get Live Data
1.85    0.00 (0.00%)
Bid:
1.70
Ask:
2.00
Spread: 0.30 (17.647%)
Market Cap: £6.87m
LND Live PriceLast checked at - London Stock Exchange

Intraday Landore Resources Limited Share Chart

Junior Lake Update

14 Mar 2016 07:00

RNS Number : 8973R
Landore Resources Limited
14 March 2016
 

LANDORE RESOURCES LIMITED

(AIM Ticker: LND.L)

  

 

DRILLING INTERSECTS SIGNIFICANT NEW GOLD ZONE

JUNIOR LAKE PROPERTY

 

 

London, United Kingdom - March 14 2016 - Landore Resources Limited (AIM:LND) ("Landore Resources" or "the Company") is pleased to report on gold results from the fall 2015 drilling campaign completed on the Junior Lake Property, Ontario, Canada.

 

Highlights:

 

· Drilling in December 2015 intersected a wide zone of gold mineralisation close to surface including 31.29 metres at 1.12 grams per tonne (g/t) in drill-hole 0415-517. Higher grade intersections within the zone include 3.70 metres 4.21g/t gold in drill-hole 0415-518.

 

· Landore completed a follow up drill program in February 2016 consisting of 5 NQ diamond drill holes for a total of 564 metres (0416-519 to 523) as 50 metres step-outs to the above drill holes, all of which have intersected similar lithological units. Results are pending and will be reported when available.

 

· This new gold zone is located approximately midway along a 2.7 kilometre long, east-west trending, MaxMin geophysical anomaly (MM-7) at the western end of which is located the historical BAM gold zone discovered by Landore in 2003.

MM-7 has not previously been drill tested.

 

Landore completed a drilling campaign in the fall of 2015, consisting of 8 diamond drill holes for a total of 2,223 metres. Six holes were drilled on Landore's B4-7 Deposit with the last two holes, 0415-517/518, drilled to test a geophysical target located 2 kilometres to the east of the B4-7 deposit. Results for the first 6 holes were reported 18 February 2016.

Results for drill holes 0415-517/518 include:

NS Line

Drill-hole

From

Interval*

Au

No

Metres

Metres

g/t

2500E

0415-517

48.00

31.29

1.12

including

48.00

7.00

2.66

including

50.00

1.00

5.64

2500E

0415-518

20.30

30.60

0.82

including

20.30

3.70

4.21

including

22.50

0.50

12.05

including

48.00

1.00

3.20

* Both holes were drilled north at 45 degrees into a lithological package dipping approximately 40 degrees to the south. The actual true thickness of mineralisation is estimated to represent between 90-95% of the intervals shown in the above table.

 

Landore remobilised to site in mid-February to carry out additional sampling on the above holes and to complete a follow up drill program consisting of 5 NQ diamond drill-holes for a total of 564 metres (0416-519 to 523) on lines 2450E, 2500E, and 2550E to test the east, west and down dip extension of the new gold zone.

 

 

All five drill-holes intersected similar lithological units to drill-holes 0415-517/518. Results are pending and will be reported as soon as available.

 

See attached plan "Junior Lake Property - New Gold Zone".http://www.rns-pdf.londonstockexchange.com/rns/8973R_-2016-3-11.pdf

 

Planned Works:

 

New Gold Zone: A trenching and channel sampling program will be carried out along the 2.7 kilometre, east-west trending, MaxMin geophysical anomaly (MM-7) in Q2.

 

Subject to positive results from the winter 2016 drill program, further drilling will be planned to extend the new gold zone down plunge and along strike to the east and west.

 

B4-7 Nickel-copper-cobalt-PGE Deposit: Landore has retained RPA Inc. (RPA) of Toronto, Canada, to conduct a review of the borehole EM (BHEM) geophysical information and drilling results from the recently-completed exploration program on the B4-7 deposit area with the aim of ascertaining the works required to bring the newly identified potential B4-7 mineralisation into the formal resource. The results from this review are expected by the end of Q1.

 

Geotechnical Studies: In December 2015, Landore engaged WSP Canada Inc. for the completion of a geotechnical study to pre-feasibility standards for rock mechanics and open pit slope angles for the proposed B4-7 starter pit.

The full study has been received and is available on Landore's web site www.landore.com 

 

Results of the study has given an inter-ramp angle of 59 degrees. This will allow the pit to be substantially deepened from the original 2013 design capturing far more of the ore whilst retaining the same stripping ratio.

 

Landore is currently seeking quotations for the completion of a pre-feasibility standard pit design. This study will incorporate the afore-mentioned pit design parameters and optimize the existing pit shell.

 

The Junior Lake property:

The Junior Lake property, 100% owned by Landore Resources, is located in the province of Ontario, Canada, approximately 235 kilometres north-northeast of Thunder Bay, and is host to; the B4-7 Nickel-Copper-Cobalt-PGEs resource, the recently-identified Exploration Target and the Alpha Zone. Junior Lake also contains the VW Nickel resource and numerous other highly prospective mineral occurrences including the BAM gold zone.

 

B4-7 Nickel-Copper-Cobalt-PGEs Resource:

 

RESOURCE CLASS

VOLUME

(tonnes)

GRADE

(% NiEq)

Contained Metal (tonnes NiEq)

Indicated

2,695,000

1.24

33,248

 

Exploration Target

1,500,000 to 2,000,000

~1.24

~20,000

 

The report is compliant with the requirements of National Instrument 43-101 (NI 43-101). The resource remains open down plunge at depth and along strike to the west.

 

 

VW Nickel Resource:

 

RESOURCE CLASS

VOLUME

(tonnes)

GRADE

(% NiEq)

Contained Metal (tonnes NiEq)

Indicated

3,730,000

0.49

21,760

Inferred

720,000

0.49

 

The report is to NI 43-101 standards. The deposit remains open down plunge at depth and along strike to the east and to the west.

 

Works completed on the Junior Lake property to date have clearly demonstrated the existence of a geological environment that is favourable for the deposition of magmatic nickel-copper sulphide mineralisation. Based on geological signatures and available geological knowledge, this favourable environment is believed to exist along a strike length of approximately 10 kilometres. At its widest, the favourable rock sequences are in the order of 1,000 to 1,500 metres in thickness.

 

Michele Tuomi, (P.Geo., BSc. Geology), Director/VP Exploration of Landore Resources Canada Inc. and a Qualified Person as defined in the Canadian National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in this announcement.

 

- ENDS -

About Landore Resources

Landore Resources is an exploration company that seeks to grow shareholder value through the acquisition, exploration and development of precious and base metal projects in eastern Canada. The Company is primarily focused on the development of the Junior Lake Nickel Project. Landore Resources has mineral rights to 6 properties in eastern Canada. The Company is headquartered in London, UK, with an exploration office located in Thunder Bay, Ontario, Canada.

 

For more information please contact:

 

Bill Humphries, Chief Executive Officer Tel: 07734 681262

Richard Prickett, Finance Director Tel: 07775 651421

Landore Resources Limited www.landore.com

 

Angela Hallett / James Spinney Tel: 020 7409 3494

Strand Hanson Limited

Nominated Advisor and Broker

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGGUWAWUPQGAG
Date   Source Headline
17th Jul 20193:51 pmRNSAdmission Date for Subscription Shares
3rd Jul 20197:00 amRNSSubscription to raise £250,000
19th Jun 20197:00 amRNSFinal Results
12th Jun 20197:00 amRNSDrilling and Exploration Programme Commences
4th Jun 201912:31 pmRNSDirectors Subscription
31st May 20194:29 pmRNS£1 million Fundraising
4th Mar 20197:00 amRNSNew Corporate Presentation
20th Feb 20197:00 amRNSTechnical Report & Preliminary Economic Assessment
5th Feb 20197:00 amRNSDETAILED METALLURGICAL ASSESSMENT BAM GOLD DEPOSIT
8th Jan 20197:00 amRNSBAM Gold Deposit Mineral Resource Estimate Update
13th Dec 20187:00 amRNSBAM Gold Deposit
11th Dec 20187:00 amRNSChange of Adviser
26th Oct 201810:00 amRNSHolding(s) in Company
25th Oct 20186:00 pmRNSHolding(s) in Company
24th Oct 20187:04 amRNSBAM Gold Deposit Update
24th Sep 20187:00 amRNSProgress Report - Bam Gold Deposit
19th Sep 20187:00 amRNSHalf-year Report
7th Aug 20187:00 amRNSMineral Resource Estimate Update
20th Jul 201811:00 amRNSHolding(s) in Company
19th Jul 201812:00 pmRNSResult of AGM
17th Jul 20187:00 amRNSProgress Report - BAM Gold Deposits
1st Jun 20187:00 amRNSFinal Results
30th May 20187:00 amRNSProgress Report - BAM Gold Deposit
26th Apr 20187:00 amRNSUpdate on BAM East Gold Deposit
11th Apr 20187:00 amRNSMineral Resources Estimates, Junior Lake
10th Apr 20184:45 pmRNSHolding(s) in Company
10th Apr 20184:30 pmRNSHolding(s) in Company
10th Apr 20183:00 pmRNSHolding(s) in Company
3rd Apr 201811:48 amRNSResult of Extraordinary General Meeting
16th Mar 20182:45 pmRNSAppointment of broker
16th Mar 20181:00 pmRNS£3.15 million Fundraising
7th Feb 20187:00 amRNSNew Corporate Presentation
5th Feb 20187:00 amRNSUpdated Mineral Resource Estimate
22nd Dec 20177:00 amRNSAward of Share Options
11th Dec 20177:05 amRNSUpdated Mineral Resource Estimate - BAM East
6th Nov 20177:00 amRNSJunior Lake and Lamaune Update
30th Oct 20172:03 pmRNSHolding(s) in Company
26th Oct 20178:00 amRNSHolding(s) in Company
19th Oct 20177:00 amRNSLandore Resources raises £1 million
11th Oct 201711:47 amRNSResult of Lamaune Special Meeting
9th Oct 20177:00 amRNSUpdate on BAM East Gold Deposit
4th Oct 20177:00 amRNSUpdate on BAM East Gold Project
27th Sep 20177:00 amRNSInterim Results
21st Sep 20174:00 pmRNSHolding(s) in Company
18th Sep 20177:00 amRNSUpdate on BAM East Gold Project
13th Sep 20177:00 amRNSDebt Settlement Agreement with Lamaune Iron Inc.
27th Jul 20177:00 amRNSUpdate on BAM East Gold Project
5th Jul 201711:00 amRNSAward of Share Options
3rd Jul 201712:14 pmRNSResult of AGM
28th Jun 20177:00 amRNSUpdate on BAM East Gold Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.