Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Resources Limited Regulatory News (LND)

Share Price Information for Landore Resources Limited (LND)

Share Price is delayed by 15 minutes
Get Live Data
1.85    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.30 (17.647%)
Market Cap: £6.87m
LND Live PriceLast checked at - London Stock Exchange

Intraday Landore Resources Limited Share Chart

Drilling Report

8 Jan 2008 07:00

Landore Resources Limited08 January 2008 LANDORE RESOURCES LIMITED (AIM Ticker: LND.L) DRILLING RESULTS AND PROGRESS REPORT JUNIOR LAKE-NICKEL PROJECT B4-7 DEPOSIT HIGHLIGHTS • Infill drilling on the historic B4-7 nickel-copper-cobalt-platinum group elements (Ni-Cu-Co-PGE) deposit, located just 3 kilometres from the VW Nickel Deposit, has confirmed the continuity of the mineralization. The deposit remains open down plunge to the West. • Drilling intersected wide zones (up to 10 metres true width) of nickel mineralization, with assay results frequently returning grades in excess of 1% nickel together with substantial credits of copper, assaying up to 1.65%, and cobalt assaying up to 0.33%. Mineralized intersections include: +----------+--------+-------+--------+--------+--------+---------+-------+ |Drill-hole| From | Width | Nickel | Copper |Platinum|Palladium|Cobalt | +----------+--------+-------+--------+--------+--------+---------+-------+ | No | Metres |Metres | % | % | g/t | g/t | % | +----------+--------+-------+--------+--------+--------+---------+-------+ | 0407-163 | 146.9| 14.7| 0.79| 0.49| 0.161| 0.778| 0.09| +----------+--------+-------+--------+--------+--------+---------+-------+ |Including | 146.9| 1.1| 0.61| 0.33| 0.108| 0.310| 0.33| +----------+--------+-------+--------+--------+--------+---------+-------+ |Including | 148.0| 5.0| 1.03| 0.52| 0.129| 0.875| 0.07| +----------+--------+-------+--------+--------+--------+---------+-------+ |Including | 161.0| 0.6| 0.33| 1.65| 0.040| 0.233| 0.32| +----------+--------+-------+--------+--------+--------+---------+-------+ | | | | | | | | | +----------+--------+-------+--------+--------+--------+---------+-------+ | 407-170 | 34.0| 2.0| 0.63| 0.08| 0.230| 2.454| 0.03| +----------+--------+-------+--------+--------+--------+---------+-------+ | and | 100.0| 11.0| 1.04| 0.54| 0.413| 0.512| 0.09| +----------+--------+-------+--------+--------+--------+---------+-------+ | and | 112.8| 0.5| 0.70| 0.30| 0.076| 0.085| 0.30| +----------+--------+-------+--------+--------+--------+---------+-------+ | and | 122.1| 0.9| 1.27| 0.09| 0.039| 0.067| 0.09| +----------+--------+-------+--------+--------+--------+---------+-------+ | | | | | | | | | +----------+--------+-------+--------+--------+--------+---------+-------+ | 407-171 | 70.3| 12.7| 0.76| 0.64| 0.112| 0.296| 0.12| +----------+--------+-------+--------+--------+--------+---------+-------+ |Including | 72.6| 1.4| 0.80| 0.99| 0.177| 0.489| 0.23| +----------+--------+-------+--------+--------+--------+---------+-------+ | | | | | | | | | +----------+--------+-------+--------+--------+--------+---------+-------+ | 407-173 | 131.1| 4.9| 0.90| 0.65| 0.034| 0.111| 0.11| +----------+--------+-------+--------+--------+--------+---------+-------+ | | | | | | | | | +----------+--------+-------+--------+--------+--------+---------+-------+ | 407-176 | 194.6| 16.8| 0.53| 0.34| 0.122| 0.174| 0.05| +----------+--------+-------+--------+--------+--------+---------+-------+ |Including | 202.0| 2.0| 1.03| 0.60| 0.313| 0.327| 0.08| +----------+--------+-------+--------+--------+--------+---------+-------+ The Junior Lake property: The Junior Lake property is located in the province of Ontario, Canada,approximately 235 kilometres north-northeast of Thunder Bay and is situatedwithin the Caribou-O-Sullivan Greenstone Belt in the Wabigoon Subprovince. TheVW Nickel Deposit is located at Ketchikan Lake toward the south eastern end ofthe Junior Lake property and the B4-7 Deposit is located approximately 3kilometres to the north-west of the VW Nickel Deposit. B4-7 Nickel-Copper Deposit: A drill programme, consisting of 16 NQ size holes (0407-162 to 0407-177) for atotal of 3,575 metres, has been completed on the B4-7 Nickel-Copper Deposit. Theprogramme was designed to infill the remaining gaps in the deposit and foradditional metallurgical testing. Final assay results have now been received and are currently being collatedafter which the data will be forwarded to Scott Wilson Roscoe Postle AssociatesInc. (Scott Wilson RPA), consulting and engineering group from Toronto, Canada,who have been engaged to independently prepare a NI43-101 resource estimate andreport on the B4-7 Nickel-Copper Deposit. All drill core was photographed prior to being cut for assaying. Samples wereanalyzed at Accurassay Laboratories (ISO/IEC 17025), Thunder Bay, Ontario, bygeochemical analysis with atomic absorption finish (Ni). All samples reportingresults of 1% nickel or higher were re-analysed by the assay method with atomicabsorption finish. Check assays, standards and laboratory duplicates wereperformed on a systematic basis at Accurassay Laboratories. ALS ChemexLaboratory in Vancouver, BC also completed systematic checks. Core is stored atsite and in Landore's facilities in Thunder Bay, Ontario. Rejects are stored atAccurassay Laboratories and in Landore's facilities in Thunder Bay. VW Nickel Deposit: Scott Wilson RPA, are currently preparing a Canadian National Instrument 43-101(NI43-101) compliant resource estimate upgrade on the VW Nickel Deposit. On completion of the resource upgrade on the VW Deposit, (estimated February)and the resource estimate of the B4-7 Deposit (estimated April) a full, NI43-101compliant, Scoping study will be completed on the combined deposits. SGS Lakefield Research Limited of Lakefield, Ontario, has been engaged tocomplete second stage metallurgical testing of the VW Nickel ore to ScopingStudy level. James Garber, (BSc. Hons. Geology, member of APGO) a Director of LandoreResources Ltd and a qualified person as defined in the Canadian NationalInstrument 43-101, has reviewed and verified all scientific or technical miningdisclosure contained in this announcement, which is stated in accordance withthe Canadian Institute of Mining Metallurgy and Petroleum. - ENDS - For more information please contact: Bill Humphries, Chairman Tel: 07734 681262Richard Prickett, Chief Executive Tel: 07775 651421Landore Resources Limited www.landore.com Simon Raggett Tel: 020 7409 3494Strand Partners Limited David Bick Tel: 07831 381201 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
4th Jun 20267:00 amRNS-RCorporate Presentation and Newsletter
3rd Jun 20267:00 amRNSFinal Results for the Year Ended 31 December 2025
7th May 20267:00 amRNSCorporate Update and 2026 Field Programme
5th May 20267:00 amRNSAppointment of Nominated Adviser and Joint Broker
1st May 20267:00 amRNSDirectorate change
31st Mar 20267:06 amRNS-RAwarded OJEP Grant
16th Feb 20267:00 amRNSCompletion of Storm Option Agreement
22nd Jan 20267:30 amRNSRestoration - Landore Resources Limited
22nd Jan 20267:00 amRNSUpdated Mineral Resource Estimates for Junior Lake
21st Jan 20267:00 amRNSUpdate re Suspension of Trading on AIM
2nd Jan 20267:00 amRNSUpdate on Suspension of Trading on AIM
2nd Jan 20267:00 amRNSUpdate on Suspension of Trading on AIM
11th Dec 20253:31 pmRNSTemporary Suspension of Trading on AIM
11th Dec 202512:59 pmRNSSuspension - Landore Resources Limited
3rd Dec 20257:00 amRNSStorm Enters Agreement to Sell Miminiska Project
10th Nov 20257:00 amRNSAmalgamation of Landore Canada and Lamaune
27th Oct 20257:00 amRNS£1,465,000 Equity Fundraise
17th Oct 20254:39 pmRNSExercise of Warrants and Issue of Equity
16th Oct 20257:00 amRNSAppointment of Alexander Shaw to Storm Board
29th Sep 20258:52 amRNSInterim Results
5th Aug 20254:11 pmRNSResult of Annual General Meeting
27th Jun 20256:10 pmRNSFinal Results and Notice of Annual General Meeting
18th Jun 20257:00 amRNSPositive Drill Campaign Results at BAM
6th May 20257:00 amRNSDrilling Campaign at BAM Gold Project Completed
25th Apr 20257:58 amRNSCompletion of BAM Mineral Rights Acquisition
4th Apr 20251:08 pmRNSDirector’s Dealing
26th Mar 20257:00 amRNSAcquisition of Additional BAM Mineral Rights
24th Mar 20257:00 amRNSReceipt of Option Payment from Storm
17th Mar 20257:00 amRNSDrilling Programme Commences on BAM
3rd Mar 20257:00 amRNSDrill Core Sampling Identifies Gold Upside
3rd Mar 20257:00 amRNSExercise of Warrants and Issue of Equity
12th Feb 20257:00 amRNSSampling Programme Identifies New Gold Anomalies
19th Dec 20247:00 amRNSAppointment of Joint Broker
13th Nov 20247:00 amRNSReceipt of Option Payment from Storm
30th Sep 20247:00 amRNSInterim Results to 30 June 2024
16th Sep 20247:00 amRNSBAM Gold Project Update
19th Aug 20247:00 amRNSUpdate on Option Agreement
17th Jul 20247:00 amRNSNotification of Major Holdings
16th Jul 202412:21 pmRNSCORRECTION: Notification of Major Holdings
16th Jul 20247:00 amRNSNotification of Major Holdings
12th Jul 20243:03 pmRNSNotification of Major Holdings
8th Jul 20241:23 pmRNSRESULT OF AGM, DIRECTORATE CHANGE & TVR
3rd Jul 20243:30 pmRNSOPTION AGREEMENT ON MIMINISKA LAKE & KEEZHIK LAKE
24th Jun 202412:30 pmRNSPosting of 2023 Annual Report and Notice of AGM
21st Jun 20242:30 pmRNSHolding(s) in Company
17th Jun 20247:00 amRNSFinal Results and Notice of AGM
12th Jun 20247:00 amRNSFundraise, Proposed CEO Appointment & Board Change
28th May 20247:00 amRNSStorm Option Agreement and Corporate Updates
15th Feb 20247:00 amRNS2023 Soil Sampling Identifies New Gold Trends
8th Feb 20246:09 pmRNSFurther Amendment to Storm Option Agreement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.