The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Regulatory News (LND)

Share Price Information for Landore (LND)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.70
Bid: 2.50
Ask: 2.90
Change: -0.40 (-12.90%)
Spread: 0.40 (16.00%)
Open: 3.05
High: 3.05
Low: 2.45
Prev. Close: 3.10
LND Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Report

27 May 2009 07:00

RNS Number : 8318S
Landore Resources Limited
27 May 2009
 



LANDORE RESOURCES LIMITED

DRILLING UPDATE

JUNIOR LAKE-NICKEL PROJECT

B4-7 DEPOSIT

HIGHLIGHTS

Infill drilling on the historic B4-7 nickel-copper-cobalt-platinum group elements (Ni-Cu-Co-PGE) deposit, located on the Junior Lake Property, has confirmed the continuity of the mineralization. The deposit remains open along strike and down plunge to the West.
Drilling intersected wide zones of nickel mineralization, with assay results frequently returning grades in excess of 1% nickel together with substantial credits of copper, assaying up to 7.05%, palladium to 4.98 g/t, and cobalt to 0.18% (4lb/t).

Assay results have been received for the first 11 drill holes, (409-200 - 0409-210). Mineralized intersections include:

Drill-hole

From

Width

Nickel

Copper

Cobalt

Platinum

Palladium

No

Metres

Metres

%

%

%

g/t

g/t

0409-200

207.00

1.00

0.29

0.12

0.03

0.42

1.71

and

232.92

6.37

0.85

0.59

0.10

0.10

0.53

0409-201

216.00

1.00

0.33

0.10

0.04

0.11

1.57

and

266.80

15.40

0.78

0.67

0.04

0.13

0.61

including

270.20

4.80

1.04

0.68

0.02

0.27

0.76

0409-202

239.24

1.27

0.18

0.15

0.01

0.13

2.41

and

340.57

1.91

1.13

0.74

0.10

0.10

0.75

0409-203

331.00

1.00

0.12

2.32

0.02

0.10

0.20

and

333.65

0.70

0.64

0.25

0.08

1.80

4.98

and

358.45

14.81

0.63

0.45

0.06

0.08

0.37

0409-204

381.00

4.00

0.12

0.05

0.13

0.12

1.46

and

454.00

14.03

0.46

0.43

0.04

0.05

0.30

including

454.00

1.17

2.70

0.55

0.06

0.01

0.48

0409-205

67.45

3.05

0.02

0.01

0.01

0.29

1.92

and

300.9

0.50

1.59

0.15

0.07

0.33

2.24

0409-206

148.60

1.54

0.72

0.20

0.05

1.15

2.35

and

198.3

3.46

0.76

0.27

0.18

0.04

0.09

0409-207

285.67

13.98

0.58

0.52

0.07

0.16

0.46

including

285.67

8.63

0.84

0.57

0.09

0.20

0.61

0409-208

291.50

1.00

0.96

0.29

0.06

0.05

2.35

0409-210

140.18

0.82

1.25

0.02

0.08

1.23

2.83

and

218.60

0.50

0.09

7.05

0.02

0.09

0.34

The Junior Lake property:

The Junior Lake property is located in the province of OntarioCanada, approximately 235 kilometres north-northeast of Thunder Bay and is situated within the Caribou-O-Sullivan Greenstone Belt in the Wabigoon Subprovince. The Junior Lake property is host to the VW Nickel (Ni) Deposit, the B4-7 Deposit, the recently reported Iron Deposit, the BAM zone gold occurrence and numerous other highly prospective mineral occurrences.

B4-7 Deposit:

In May 2008, Landore reported an inferred resource estimate for the B4-7 Deposit of 4,650,000 tonnes at 0.55% Nickel Equivalent (NiEq) (nickel plus copper-cobalt-PGE credits) at a 0.3% Ni cutoff. The resource estimate was independently prepared to Australasian Joint Ore Reserves Committee (JORC) Code (2004) compliance.

A drill programme, consisting of 29 NQ size holes (0409-200 to 0409-228) for a total of 7,618 metres, has recently been completed on the B4-7 Deposit. The programme was designed to infill the remaining gaps in the deposit to provide sufficient information and drill density so that a new Canadian National Instrument 43-101 compliant resource estimate (NI-43-101) can be calculated, bringing the deposit from inferred to indicated status. Additional metallurgical testing will be completed using core from the present programme.  

The drill programme has shown that the B4-7 deposit remains open to the west along strike and down plunge to the northwest. A previously completed airborne electromagnetic survey suggests thconductive horizon hosting the B4-7 deposit may persist for an additional 500 metres to the west of the most westerly drill holes completed to date. 

The deposit displays excellent continuity and has considerable variation in width along strike and down dip varying from 1 - 2 metres to over 15 metres. A separate zone of highly anomalous PGE and Ni-Cu mineralization is observed in the hanging wall. 

All drill core was photographed prior to being cut for assaying. Samples were analyzed at Accurassay Laboratories (ISO/IEC 17025), Thunder BayOntario, by geochemical analysis with atomic absorption finish (Ni). All samples reporting results of 1% nickel or higher are re-analysed by the assay method with atomic absorption finish. Check assays, standards and laboratory duplicates are performed on a systematic basis at Accurassay Laboratories. Actlabs Laboratory in Thunder BayOntario is used for systematic checks. Core is stored on site and in Landore's secure facilities in Thunder BayOntario. Rejects are stored at Accurassay Laboratories and in Landore's secure facilities in Thunder Bay.

VW Nickel Deposit:

Drilling has commenced at the VW Nickel deposit in order to test the down plunge continuity of the high-grade nickel shoot at the western end of the Katrina horizon.

Other Work

An airborne electromagnetic and magnetic survey was completed covering the eastern portion of the Junior Lake property covering Toronto Lake Area. The results are currently being evaluated and will be reported on in the near future.

Airborne magnetic and electromagnetic surveying was also completed in the Lamaune Area covering the western portion of the Junior Lake property. The resultare currently being interpreted and will be reported on in the near future.

Robert Fraser (M.Sc, P.Geo Ontario), Exploration Manager of Landore Resources Canada Inc and a qualified person as defined in the Canadian National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in this announcement, which is stated in accordance with the Canadian Institute of Mining Metallurgy and Petroleum.

- ENDS -

For more information please contact:

Bill Humphries, Chairman

Richard Prickett, Chief Executive

Landore Resources Limited

Tel: 07734 681262 

Tel: 07775 651421 

www.landore.com

Simon Raggett

Strand Partners Limited

Tel: 020 7409 3494

David Bick

Tel: 07831 381201

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLEQLFLKEBBBBB
Date   Source Headline
8th Apr 20213:09 pmRNSDisposal of 30% Interest in West Graham Property
29th Mar 20217:00 amRNSDrilling Update
3rd Mar 20217:00 amRNSJunior Lake Property BAM Gold & Battery Metals
22nd Feb 20215:24 pmRNSDirectors Subscription
17th Feb 20213:12 pmRNSExercise of Warrants and Issue of Equity
16th Feb 20215:57 pmRNS£3.5 Million Fundraising
15th Feb 20217:00 amRNSCorporate Presentation
12th Feb 20214:49 pmRNSStatement re Press Speculation
12th Feb 20218:24 amRNSExercise of Warrants and Issue of Equity
11th Feb 20217:00 amRNSDrilling Update
28th Jan 20214:28 pmRNSExercise of Warrants and Issue of Equity
21st Jan 20215:31 pmRNSExercise of Warrants and Issue of Equity
21st Jan 20213:16 pmRNSExercise of Warrants and Issue of Equity
21st Jan 20217:00 amRNSExercise of Warrants and Issue of Equity
14th Jan 20217:00 amRNSSoil Sampling Program Results
3rd Dec 20207:00 amRNSDrilling Update
9th Nov 202012:38 pmRNSChange of Admission Date
6th Nov 20207:29 amRNSExercise of Warrants and Issue of Equity
19th Oct 20207:00 amRNSDrilling Commences at BAM Gold Project
28th Sep 20207:00 amRNSInitiation of Research Coverage
21st Sep 20207:00 amRNSAcquisition of Royalty Rights at Lamaune Lake
21st Sep 20207:00 amRNSHalf-year Report
1st Sep 20207:00 amRNSDrilling Programme 2020/21 and Pit Optimisation
20th Aug 202012:46 pmRNSResults of General Meetings
6th Aug 202012:54 pmRNSHolding(s) in Company
24th Jul 20201:57 pmRNSAward of Options
24th Jul 20207:01 amRNSProposed Share Capital Consolidaton
24th Jul 20207:00 amRNSFinal Results & Notice of AGM
21st Jul 202011:26 amRNSHolding(s) in Company
20th Jul 202011:13 amRNSHolding(s) in Company
13th Jul 202011:42 amRNSResult of Extraordinary General Meeting
1st Jul 202011:05 amRNSSecond Price Monitoring Extn
1st Jul 202011:00 amRNSPrice Monitoring Extension
29th Jun 20207:00 amRNS£2.8 million Conditional Placing and Accounts Date
22nd Jun 20209:05 amRNSSecond Price Monitoring Extn
22nd Jun 20209:00 amRNSPrice Monitoring Extension
24th Apr 20207:00 amRNSSubscription to raise £260,000
15th Apr 20207:00 amRNSCorporate Presentation
9th Apr 20207:00 amRNSResource Estimate and Technical Report Publication
6th Apr 20204:11 pmRNSDirector/PDMR Shareholding
7th Feb 20204:26 pmRNSDirectorate Change
17th Jan 20207:00 amRNSAppointment of Non-Executive Director
16th Jan 202010:18 amRNSNew Corporate Presentation
14th Jan 202011:52 amRNSSubscription to raise £225,000
7th Jan 20207:00 amRNSBAM Gold Deposit Mineral Resource Estimate Update
9th Dec 20197:00 amRNSSoil Sampling Program Results
13th Nov 20197:00 amRNSGrant of Mining Leases to Lamaune Inc
21st Oct 20197:00 amRNSProgress Update - BAM Gold Project
18th Sep 20199:13 amRNSSubscription to raise £470,000
4th Sep 20197:00 amRNSDrilling Update - BAM Gold Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.