Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKibo Energy Regulatory News (KIBO)

  • This share is currently suspended. It was suspended at a price of 0.0065

Share Price Information for Kibo Energy (KIBO)

Share Price is delayed by 15 minutes
Get Live Data
0.0065    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.00 (0.00%)
Market Cap: £956.49k
KIBO Live PriceLast checked at - London Stock Exchange

Intraday Kibo Energy Share Chart

RCPP Update

18 Sep 2014 08:00

RNS Number : 9981R
Kibo Mining Plc
18 September 2014
 



Kibo Mining Plc

(Incorporated in Ireland)

Registration Number: 451931

(External registration number: 2011/007371/10)

Share code on the JSE: KBO

Share code on the AIM: KIBO

ISIN: IE00B61XQX41

("Kibo" or the "Company")

 

18 September 2014

 

Sustained Progress on Rukwa Coal to Power Project's ("RCPP") Definitive Mining Feasibility Study ("DMFS")

 

Highlights

 

· Conceptual Mine Design and Schedule completed;

· Conceptual Framework for Coal Infrastructure and Logistics completed;

· Conceptual Plant design completed;

 

Kibo Mining plc ("Kibo" or the "Company"), the mineral exploration and development company focused on gold, nickel, coal and uranium projects in Tanzania, is pleased to announce further progress made in the development of Phase 1, Stage 1, of the Rukwa DMFS. After confirmation of initial assumptions, the establishment of a mining base case and mine design criteria, the study focused on assessing and confirming a conceptual mine plan. The most important results from this work were confirmation of:

 

· Run of Mine (ROM) at 120 Ktpm;

· Stripping ratio at 4.0 (BCM/t);

 

Confirmation of these critical factors therefore demonstrates that Rukwa can be mined efficiently and within previously reported cost parameters. This will be achieved by mining the pit from two starter pits (or box cuts), allowing advances on four benches (faces) and four directions along strike simultaneously. This arrangement will provide considerable flexibility in the mine plan and setup and also allow for mine waste to be deposited in the pit, significantly cutting down on hauling cost and eventual rehabilitation cost.

 

Louis Coetzee, C.E.O. of Kibo Mining, commented: "We continue to rapidly de-risk the mining portion of the Rukwa Coal to Power Project, with further detailed work delivered in these early stages of the feasibility process. The technical fundamentals and planning considerations are already well developed, which should allow a quicker than expected advance into Phase 2, Stage 1 of the DMFS."

 

Kibo Mining - Notes to editors

 

Kibo was established in early 2008 to explore and develop mineral deposits in Tanzania. The Company was admitted to AIM in London on 27 April 2010 and the AltX in Johannesburg on 30 May 2011. The Company is developing the Rukwa mouth-of-mine thermal power station and controls one of Tanzania's largest mineral right portfolios, including the Haneti (nickel, PGE and gold), Morogoro (gold), Lake Victoria (gold), and Pinewood (coal & uranium) projects.

 

 Kibo's projects are located both in the established and gold prolific Lake Victoria Goldfields, the emerging goldfields of eastern Tanzania and the Mtwara Corridor in southern Tanzania, where the Government has prioritised infrastructural development, attracting significant recent investment in coal and uranium.

 

Kibo's objective is to build shareholder value sustainably. This will be achieved primarily through exploration of its own projects and leveraging the Company's experience in Tanzania to acquire exploration and development assets on competitive terms. The focus is on assets that can be moved swiftly up the value curve whilst benefitting from strategic relationships with industry leaders with special skills and competencies within their chosen fields.

 

Updates on the Company's activities are regularly posted on its website www.kibomining.com  

 

Technical Data

RUKWA COAL RESOURCE SUMMARY- GEMECS (Pty) Ltd

SEAM

NI 43-101

IN SITU

SEAM

THICKNESS

CLASS

MILLION TONS

S4

1.14

Indicated

2.17

S3U

2.04

Indicated

6.92

S3L

2.3

Indicated

12.63

S2

3.45

Indicated

23.43

S1U

2.48

Indicated

7.34

S1L

2.92

Indicated

17.4

S0

1.08

Indicated

1.44

Total Indicated Resources

 

71.34

S4

1.31

Inferred

1.38

S3U

2.24

Inferred

2.94

S3L

2.27

Inferred

3.86

S2

3.42

Inferred

7.94

S1U

2.05

Inferred

6.5

S1L

3.15

Inferred

12.83

S0

1.06

Inferred

2.6

Total Inferred Resources

 

38.05

TOTAL RESOURCES

 

109.39

 

 

  

 

 

Review by Qualified Person

 

The information in this announcement that relates to the Rukwa coal resource is taken from a report titled "Independent Technical Report for the Rukwa Coal Project, Mbeya Region, United Republic of Tanzania" dated 19th April 2012 by CD van Niekerk Director and Principal Geologist with the firm GEMECS (Pty) Ltd. Mr van Niekerk is a Professional Natural Scientist with the South African Council for Natural Scientific Professions (SACNASP), Registration No. 400066/98 and a Fellow Member of the Geological Society of South Africa. He has relevant experience and technical qualifications to be a "Qualified Person" for reporting coal resources to the NI 43-101 Standard. The Company's Exploration Director, Noel O'Keeffe has also reviewed the technical reports and the references to them in this announcement.

 

 

Contacts

Louis Coetzee

+27 (0) 83 2606126

Kibo Mining plc

Chief Executive Officer

Andreas Lianos

+27 (0) 83 4408365

River Group

Corporate Adviser and Designated Adviser on JSE

Jon Belliss

Abigail Wayne

+44 (0) 20 3693 1470

Hume Capital Securities Plc

Broker

Oliver Morse

Trinity McIntyre

+61 8 94802500

+61 8 94802500

RFC Ambrian Limited

Nominated Adviser on AIM

Daniel Thöle

Lydia Eades

+44 (0) 203 772 2500

+44 (0) 203 772 2500

 Bell Pottinger

Investor and Media Relations

 

 

 

 

Johannesburg

18 September 2014

Corporate and Designated Adviser

River Group

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGLGDCRDBBGSI
Date   Source Headline
10th Nov 20148:00 amRNSCommencement of Accelerated PFS for RCPP
28th Oct 20148:00 amRNSRukwa DMFS Project Update
14th Oct 20148:00 amRNSCommencement of DFS on Imweru
10th Oct 20148:11 amRNSClarification re CEO shareholding
9th Oct 20147:00 amRNSFirst Financial Indicators for RCPP
8th Oct 20149:15 amRNSKibo Mining raises £855,725 in Share Placing
29th Sep 20148:00 amRNSRCPP Update
25th Sep 20144:00 pmRNSInterim Results
18th Sep 20148:00 amRNSRCPP Update
9th Sep 20148:00 amRNSPreliminary Evaluation confirms Mining Viability
2nd Sep 20148:30 amRNSImweru Exploration Results
21st Aug 20148:31 amRNSProgress with DFS at RCPP
31st Jul 20148:00 amRNSResult of AGM & Completion of Placing
29th Jul 20148:00 amRNSRCPP to commence DMFS
15th Jul 20144:40 pmRNSSecond Price Monitoring Extn
15th Jul 20144:35 pmRNSPrice Monitoring Extension
14th Jul 20148:30 amRNSKibo Mining Plc Share Placing
7th Jul 20149:17 amRNSPosting of 2013 Annual Report
30th Jun 20143:56 pmRNSAnnual Financial Statements & Notice of AGM
27th Jun 201412:40 pmRNSFinal Results
27th May 20149:00 amRNS1st Quarter Results
2nd Apr 20141:00 pmRNSUK Investor Show & Registered Company Address
31st Mar 20149:00 amRNSKibo Mining raises £750,000 in Share Placing
17th Mar 20148:00 amRNSTechnical Report - Haneti
24th Feb 20148:00 amRNSTechnical Report Confirms Imweru Upside Potential
14th Feb 20149:30 amRNSAppointment of Director
23rd Jan 20149:00 amRNSShareholder Update: Financial Year 2013/14
14th Jan 20147:00 amRNSPositive Phase 1 Drilling Results From Imweru
20th Dec 20137:00 amRNSDistribution of Shareholding by Major Shareholder
19th Dec 20137:00 amRNSHaneti Nickel and Imweru Gold Projects Update
13th Dec 20137:30 amRNSHaneti Exploration Project Update
5th Dec 20133:48 pmRNSKibo Re-acquires 100% interest in Haneti
4th Dec 20137:30 amRNSIMWERU GOLD PROJECT COMPLETED AHEAD OF SCHEDULE
19th Nov 20137:30 amRNSUpdate on Exploration Activities
28th Oct 20137:30 amRNSKibo Commences 3,000 metre Drill Programme
8th Oct 20137:00 amRNSManagement Team and Financial Advisor Appointed
1st Oct 20137:00 amRNSKibo Issues of Shares for Cash
30th Sep 20139:45 amRNSHalf Year Results Announcement
16th Sep 20137:00 amRNSRecent Encouraging Stream Sampling Results
11th Sep 20137:00 amRNSRaises further £500,000 in Secondary Placement
9th Sep 20137:30 amRNSHaneti Joint Venture Project Update
30th Aug 201310:52 amRNSKibo raises £1,105,000 in Share Placing
13th Aug 20137:30 amRNSKibo Announces new Consolidated Lake Victoria Gold
1st Aug 20137:00 amRNSChange in UK Broking Arrangements
31st Jul 20134:45 pmRNSRESULTS OF THE ANNUAL GENERAL MEETING
31st Jul 20137:00 amRNSHaneti Project Interim Update
18th Jul 20137:00 amRNSMOU Signed with Korean East West Power
11th Jul 20137:00 amRNSHaneti Interim Project Update
8th Jul 201310:00 amRNSAnnual Report, AGM Date and Director Resignations
1st Jul 20137:00 amRNS15 months results for the period ended 31 Dec 2012

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.