RCPP Update

18 Sep 2014 08:00

RNS Number : 9981R
Kibo Mining Plc
18 September 2014
 



Kibo Mining Plc

(Incorporated in Ireland)

Registration Number: 451931

(External registration number: 2011/007371/10)

Share code on the JSE: KBO

Share code on the AIM: KIBO

ISIN: IE00B61XQX41

("Kibo" or the "Company")

 

18 September 2014

 

Sustained Progress on Rukwa Coal to Power Project's ("RCPP") Definitive Mining Feasibility Study ("DMFS")

 

Highlights

 

· Conceptual Mine Design and Schedule completed;

· Conceptual Framework for Coal Infrastructure and Logistics completed;

· Conceptual Plant design completed;

 

Kibo Mining plc ("Kibo" or the "Company"), the mineral exploration and development company focused on gold, nickel, coal and uranium projects in Tanzania, is pleased to announce further progress made in the development of Phase 1, Stage 1, of the Rukwa DMFS. After confirmation of initial assumptions, the establishment of a mining base case and mine design criteria, the study focused on assessing and confirming a conceptual mine plan. The most important results from this work were confirmation of:

 

· Run of Mine (ROM) at 120 Ktpm;

· Stripping ratio at 4.0 (BCM/t);

 

Confirmation of these critical factors therefore demonstrates that Rukwa can be mined efficiently and within previously reported cost parameters. This will be achieved by mining the pit from two starter pits (or box cuts), allowing advances on four benches (faces) and four directions along strike simultaneously. This arrangement will provide considerable flexibility in the mine plan and setup and also allow for mine waste to be deposited in the pit, significantly cutting down on hauling cost and eventual rehabilitation cost.

 

Louis Coetzee, C.E.O. of Kibo Mining, commented: "We continue to rapidly de-risk the mining portion of the Rukwa Coal to Power Project, with further detailed work delivered in these early stages of the feasibility process. The technical fundamentals and planning considerations are already well developed, which should allow a quicker than expected advance into Phase 2, Stage 1 of the DMFS."

 

Kibo Mining - Notes to editors

 

Kibo was established in early 2008 to explore and develop mineral deposits in Tanzania. The Company was admitted to AIM in London on 27 April 2010 and the AltX in Johannesburg on 30 May 2011. The Company is developing the Rukwa mouth-of-mine thermal power station and controls one of Tanzania's largest mineral right portfolios, including the Haneti (nickel, PGE and gold), Morogoro (gold), Lake Victoria (gold), and Pinewood (coal & uranium) projects.

 

 Kibo's projects are located both in the established and gold prolific Lake Victoria Goldfields, the emerging goldfields of eastern Tanzania and the Mtwara Corridor in southern Tanzania, where the Government has prioritised infrastructural development, attracting significant recent investment in coal and uranium.

 

Kibo's objective is to build shareholder value sustainably. This will be achieved primarily through exploration of its own projects and leveraging the Company's experience in Tanzania to acquire exploration and development assets on competitive terms. The focus is on assets that can be moved swiftly up the value curve whilst benefitting from strategic relationships with industry leaders with special skills and competencies within their chosen fields.

 

Updates on the Company's activities are regularly posted on its website www.kibomining.com  

 

Technical Data

RUKWA COAL RESOURCE SUMMARY- GEMECS (Pty) Ltd

SEAM

NI 43-101

IN SITU

SEAM

THICKNESS

CLASS

MILLION TONS

S4

1.14

Indicated

2.17

S3U

2.04

Indicated

6.92

S3L

2.3

Indicated

12.63

S2

3.45

Indicated

23.43

S1U

2.48

Indicated

7.34

S1L

2.92

Indicated

17.4

S0

1.08

Indicated

1.44

Total Indicated Resources

 

71.34

S4

1.31

Inferred

1.38

S3U

2.24

Inferred

2.94

S3L

2.27

Inferred

3.86

S2

3.42

Inferred

7.94

S1U

2.05

Inferred

6.5

S1L

3.15

Inferred

12.83

S0

1.06

Inferred

2.6

Total Inferred Resources

 

38.05

TOTAL RESOURCES

 

109.39

 

 

  

 

 

Review by Qualified Person

 

The information in this announcement that relates to the Rukwa coal resource is taken from a report titled "Independent Technical Report for the Rukwa Coal Project, Mbeya Region, United Republic of Tanzania" dated 19th April 2012 by CD van Niekerk Director and Principal Geologist with the firm GEMECS (Pty) Ltd. Mr van Niekerk is a Professional Natural Scientist with the South African Council for Natural Scientific Professions (SACNASP), Registration No. 400066/98 and a Fellow Member of the Geological Society of South Africa. He has relevant experience and technical qualifications to be a "Qualified Person" for reporting coal resources to the NI 43-101 Standard. The Company's Exploration Director, Noel O'Keeffe has also reviewed the technical reports and the references to them in this announcement.

 

 

Contacts

Louis Coetzee

+27 (0) 83 2606126

Kibo Mining plc

Chief Executive Officer

Andreas Lianos

+27 (0) 83 4408365

River Group

Corporate Adviser and Designated Adviser on JSE

Jon Belliss

Abigail Wayne

+44 (0) 20 3693 1470

Hume Capital Securities Plc

Broker

Oliver Morse

Trinity McIntyre

+61 8 94802500

+61 8 94802500

RFC Ambrian Limited

Nominated Adviser on AIM

Daniel Thöle

Lydia Eades

+44 (0) 203 772 2500

+44 (0) 203 772 2500

 Bell Pottinger

Investor and Media Relations

 

 

 

 

Johannesburg

18 September 2014

Corporate and Designated Adviser

River Group

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGLGDCRDBBGSI
Date   Source Headline
23rd Jun 20153:00 pmRNSKibo Share Forfeiture
18th Jun 20158:00 amRNSHume Placing Update
10th Jun 20158:00 amRNSWork Commencement - Morogoro Gold Project JV
9th Jun 20157:00 amRNSMbeya - Board approves Joint Development Agreement
4th Jun 20158:00 amRNSAnnual Report, Audited Financial Statements & AGM
2nd Jun 201512:30 pmRNSKIBO SHARE OPTION GRANT AND SHARE ISSUE
29th May 20158:00 amRNSAnnual Financial Statement
26th May 20157:01 amRNSRukwa Definitive Mining Feasibility Study Update
29th Apr 20157:00 amRNSSEPCO III Site Visit to Tanzania
21st Apr 20151:00 pmRNSKibo Mining raises £1,500,000 in Share Placing
20th Apr 20157:00 amRNSRukwa Project - Joint Development Agreement Signed
16th Apr 20158:00 amRNSUK Investor Presentation
8th Apr 20158:00 amRNSImweru- Operational Update
1st Apr 201512:00 pmRNSRCPP - Operational Update
25th Mar 201511:15 amRNSUpdate on Proceeds of Placing
17th Mar 20152:35 pmRNSNew Broker Appointment
17th Mar 20157:00 amRNSProceeds of Placing
13th Mar 20157:00 amRNSHaneti- Airborne Geophysical Data Acquisition
11th Mar 20159:00 amRNSNotifiable Holding Change
10th Mar 20158:00 amRNSPositive Integrated Pre-Feasibility Study Report
2nd Mar 20158:00 amRNSKibo Mining raises £950,000.00 in Share Placing
26th Feb 201510:00 amRNSMorogoro Gold Joint Venture Commences
26th Feb 201510:00 amRNSGold Joint Venture Commenced
26th Feb 20159:00 amRNSUranium Joint Venture Commences
26th Feb 20159:00 amRNSUranium Joint Venture Commenced
10th Feb 20157:00 amRNSPEA Update - Imweru Gold Project
30th Jan 201512:21 pmRNSNotification from Significant Shareholder
28th Jan 201510:00 amRNSKibo Mining Presentation in London
27th Jan 20157:00 amRNSHaneti Nickel Project- Positive Geochemical Update
21st Jan 20158:00 amRNSWarrant issue, Warrant Exercise & New Share Issue
19th Jan 20157:00 amRNSMemorandum of Understanding - Morogoro
19th Jan 20157:00 amRNSMemorandum of Understanding - Gold Project
14th Jan 201511:30 amRNSPinewood Uranium JV proceeding
14th Jan 201511:30 amRNSUraniumJV proceeds;Issue/Exercise of KIBO warrants
8th Jan 20151:45 pmRNSHolding(s) in Company
31st Dec 20147:00 amRNSChange of Auditors
30th Dec 20147:00 amRNSShareholder Operational Update: Final Quarter 2014
18th Dec 201410:00 amRNSPower Pre-Feasibility Study Report
16th Dec 20147:00 amRNSPreliminary Economic Assessment Update
12th Dec 201410:00 amRNSChange in Significant Shareholder
11th Dec 20147:00 amRNSPower PFS Rukwa Coal to Power Project Update
9th Dec 20147:00 amRNSRukwa Definitive Mining Feasibility Study
4th Dec 20149:49 amRNSCompletion of Share Issue to Metal Tiger plc
4th Dec 20148:46 amRNSRELEASED IN ERROR
4th Dec 20148:06 amRNSCompletion of Share Issue to Metal Tiger plc
1st Dec 20147:00 amRNSDefinitive Mining Feasibility Study Update
26th Nov 20148:00 amRNSKibo Launches NewCompany Website
21st Nov 201410:00 amRNSMemorandum of Understanding
19th Nov 20142:00 pmRNSKibo Issue of Shares for Cash
12th Nov 20147:00 amRNSNotice of Presentation & Letter to Shareholders

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.