MCPP Definitive Mining Feasibility Study Results

8 Jul 2016 07:00

RNS Number : 6413D
Kibo Mining Plc
08 July 2016
 

 Kibo Mining Plc (Incorporated in Ireland)

(Registration Number: 451931)

(External registration number: 2011/007371/10)

Share code on the JSE Limited: KBO Share code on the AIM: KIBO

ISIN:IE00B97C0C31

("Kibo" or "the Company")

 

08/07/2016

 

Mbeya Coal to Power Project Completes Definitive Mining Feasibility Study

 

Kibo Mining plc ("Kibo" or the "Company") (AIM: KIBO; AltX: KBO), the Tanzania focussed mineral exploration and development company, is pleased to announce the completion of the Mining Definitive Feasibility Study ("MDFS") of the Mbeya Coal to Power Project ("MCPP").

 

The MDFS comprised the optimization of the mine design, a detailed mine design based on the results from the restated Mbeya Coal Resource (RNS dated 11 April 2016) and the final coal requirement for the Mbeya Power Station as stated in the Power Definitive Feasibility Study ("PDFS") (RNS dated 4 May 2016). Results from the MDFS correlate accurately with those of the Mining Pre-Feasibility Study ("MPFS") (RNS dated 12 August 2015) and have reconfirmed the Mbeya Coal Mine as a robust project with strong financial and commercial indicators.

 

Key results from the MDFS are the following:

® IRR 69.2% (15% improvement from 53.9% stated in the MPFS);

® Payback period 2.4 years (7% improvement from 2.6 years stated in the MPFS);

® Peak funding requirement USD 17 Million (reduced by 54% from that identified in MPFS);

® Power station coal requirement over the life of the plant was reduced by 23% from that identified in the MPFS, bringing about significant environmental and cost benefits. NOTE: The mining method developed for the Mbeya coal mine ensures that all coal seams can be mined with great accuracy, which guarantees that coal is delivered to the power plant at a reliable and consistent calorific value ("CV"). The reliability in receiving coal at a consistent CV was critical for the power plant design to ensure optimal fuel efficiencies. The MDFS mining method made it possible to design a power station that required significantly less coal for the same output i.e. 1 840 GWh per annum. Although this will result in a linear reduction of revenue for the coal mine, this is more than recovered in cost savings for the power plant which is most sensitive to fuel costs. The most important gain from the efficiencies and effectiveness of the mining method is however in the notably reduced overall environmental impact of both the mine and the power station;

® Mining method selected during MPFS confirmed as most accurate and cost-effective mining method for the Mbeya Coal Mine. NOTE: The mining method developed for the Mbeya coal mine confirmed that mining will be conducted by modified terrace mining, with over burden removal by means of a free dig (truck and shovel) method and coal seam and inter burden mining by means of mechanised continuous surface mining.

® All in cost margin 39% (reduced from 49% in the MPFS due to greater accuracy in modelling key cost drivers).

 

Louis Coetzee, CEO of Kibo Mining, said: "We are delighted with the results of the MDFS, which have confirmed, and in various areas improved on the positive Pre - Feasibility Study results. Figures from the MDFS report confirm that the Mbeya Coal Mine (as the mining component of the MCPP) is a robust project in every aspect. Project fundamentals are significantly better than originally at the end of the Concept Study in 2014.

 

We are particularly pleased with the improved IRR of 69.2% and the significantly improved environmental impact. The significance of the mining method that was developed for the Mbeya coal mine cannot be underestimated. This method not only eliminated one of the two biggest environmental risks for the MCPP, i.e. eliminating the need to wash the coal, but also reduced the coal requirement by 23%, which means substantial cost savings for both the mine and the power plant. It will also result in a corresponding reduction in emissions. Considering that these two elements are fundamental to the fundability of the MCPP, we could not have hoped for better results from the MDFS.

 

The total coal requirement of the Mbeya power plant over the life of plant is stated as a probable reserve in the MDFS, meaning that the power plant can rely on an upfront guaranteed fuel supply for its entire life span.

 

The two key work streams required for the completion of the MCPP Integrated Bankable Feasibility Study ("IBFS") are now complete and we are now focussed on completion of the final work on the IBFS".

 

 

Important Notes for Readers:

 

The information contained within this announcement is taken from the DMFS report produced by Minxcon Projects in respect of the MMCPP. Recognising the level of commercial sensitivity and for the protection of all stakeholders' interests the technical information contained in the DMFS report which has been provided in this announcement and in the wider public domain has been limited at this time.

 

Readers should note that operational and financial data pertaining to any complex development project of this nature is project specific. Kibo has undertaken the MCPP DMFS to properly and professionally understand the technical and financial merits of the project and the results reported above remain the subject of ongoing review and verification and any material changes will be reported to the market should any occur. The findings outlined can only be used in an assessment and analysis of the MCPP to which this work relates and not as a generic benchmark standard.

 

 

 

 

 

 

 

 

 

 

 

 

Contacts

 

Louis Coetzee

+27 (0) 83 2606126

Kibo Mining plc

Chief Executive Officer

Andreas Lianos

+27 (0) 83 4408365

River Group

Corporate Adviser and Designated Adviser on JSE

Jon Belliss

+44 (0) 207 382 8300

Beaufort Securities Limited

Broker

Oliver Morse

+61 8 9480 2500

RFC Ambrian Limited

Nominated Adviser on AIM

Daniel Thöle / Anna Legge

 

+44 (0) 203 772 2500

 

Bell Pottinger

Investor and Media Relations

 

Kibo Mining - Notes to editors

Kibo Mining is listed on the AIM market in London and the AltX in Johannesburg. The Company is focused on exploration and development of mineral projects in Tanzania, and controls one of Tanzania's largest mineral right portfolios. Tanzania provides a secure and stable operating environment for the mineral resource industry and Kibo Mining therein.

 

Kibo Mining holds a thermal coal deposit at Mbeya, which has a significant NI 43-101 compliant defined resource, and is developing a 250-350 MW mouth-of-mine thermal power station, the Mbeya Coal to Power Project ("MCPP"), previously called Mbeya Coal to Power Project ("MCPP"), with an established management team that includes Standard Bank as Financial Advisor. Kibo is undertaking a Coal Mining Definitive Feasibility Study and a Power Pre-Feasibility Study for the Mbeya project with an integrated Bankable Feasibility Study report for the MCPP to be released in the near term. On 20th April 2015, Kibo signed a Joint Development Agreement for the completion of the Definitive Feasibility Studies and development of the MCPP with China based EPC contractor SEPCO III.

 

The Company also has extensive gold focused interests including Lake Victoria Goldfields and Morogoro projects. At Lake Victoria, the Company has projects with a 550,000 oz. JORC compliant gold Mineral Resource at Imweru Project and a 168,000 oz. NI 43-101 compliant gold Mineral Resource at the Lubando Project in which the Company holds a 90% attributable interest. The Company is currently undertaking a Definitive Feasibility Study on its Imweru Project.

 

Kibo also holds the Haneti Project on which the latest technical report confirms prospectivity for nickel, PGMs, gold and strategic metals including lithium.

 

Kibo Mining further holds the Pinewood (coal & uranium) project where the company has entered into a 50/50 Exploration Joint Venture with Metal Tiger plc.

 

Finally, the Company also holds the Morogoro (gold) project where the company has also entered into a 50/50 Exploration Joint Venture with Metal Tiger plc.

 

The Company's projects are located in the established and gold prolific Lake Victoria Goldfields, the emerging goldfields of eastern Tanzania and the Mtwara Corridor in southern Tanzania where the Government has prioritized infrastructural development attracting significant recent investment in coal and uranium. The Company has a positive working relationship with the Tanzanian government at local, regional and national levels and works hard to maintain positive relationships with all communities where company interests are held. The Company recognizes the potential to enhance the quality of life and opportunity for Tanzanian citizens through careful development of its projects.

 

Updates on the Company's activities are regularly posted on its website www.kibomining.com

 

 

Table 1: Restated Mbeya Resource Statement (dated 31 March 2016)

 

 

SEAM

SEAM

NI43-101

IN SITU

%

IN SITU

RAW QUALITIES (AIR DRIED)

THIKNESS

CLASS

Megatons

GEOLOGICAL

Megatons

RD

ASH

IM

VM

CV

TS

No discount

DISCOUNT

with discount

gm/cc

%

%

%

%

%

S4

Measured

0

-5%

0

S3U

2,25

Measured

3,186

-5%

3,027

1,65

43,7

5,3

23,1

14,6

1,96

S3L

2,58

Measured

3,722

-5%

3,536

1,58

36,6

6,2

25,2

16,9

1,45

S2

3,89

Measured

6,279

-5%

5,965

1,56

34,7

6,5

24,5

17,3

1,31

S1U

2,61

Measured

4,180

-5%

3,971

1,67

38,4

5,7

23,1

16,1

1,00

S1L

2,92

Measured

4,159

-5%

3,951

1,56

33,7

6,0

23,6

17,8

0,86

S0

1,39

Measured

0,477

-5%

0,453

1,59

37,7

6,2

22,5

16,0

0,42

Measured

22,004

-5%

20,904

1,60

36,91

6,02

23,92

16,68

1,26

S4

1,04

Indicated

3,49

-10%

3,14

1,74

48,6

5,2

22,1

12,8

1,36

S3U

2,09

Indicated

12,17

-10%

10,95

1,67

45,5

5,3

22,2

14,2

1,55

S3L

2,00

Indicated

13,08

-10%

11,77

1,64

41,3

5,1

24,0

15,6

1,97

S2

3,41

Indicated

25,64

-10%

23,08

1,58

36,9

5,8

24,4

16,8

1,10

S1U

2,26

Indicated

18,16

-10%

16,34

1,72

44,3

5,0

22,0

14,2

1,02

S1L

2,74

Indicated

21,29

-10%

19,16

1,67

38,1

5,2

22,6

16,4

0,66

S0

1,31

Indicated

4,61

-10%

4,15

1,66

41,4

5,5

21,4

15,2

0,69

Indicated

98,446

-10%

88,601

1,65

40,79

5,31

23,01

15,52

1,15

S4

0,82

Inferred

0,4

-15%

0,3

1,87

56,9

5,1

18,9

9,6

0,99

S3U

2,48

Inferred

2,3

-15%

2,0

1,69

46,9

5,1

21,5

13,5

1,49

S3L

1,79

Inferred

1,8

-15%

1,5

1,75

47,6

5,2

21,7

13,2

2,43

S2

3,00

Inferred

2,2

-15%

1,9

1,54

33,7

6,4

24,6

17,7

1,32

S1U

2,26

Inferred

2,8

-15%

2,4

1,74

42,3

5,8

21,9

14,2

1,01

S1L

2,93

Inferred

3,6

-15%

3,1

1,68

35,6

5,5

23,2

17,0

0,85

S0

1,13

Inferred

0,1

-15%

0,1

1,67

44,3

5,4

20,5

13,9

0,50

Inferred

13,280

-15%

11,288

1,69

40,99

5,58

22,51

15,17

1,29

GRAND TOTAL

133,729

120,793

1,65

40,17

5,45

23,11

15,68

1,18

 

Review by Qualified Persons

 

The information in this announcement that relates to the Mbeya Coal Mineral Resource is taken from a report by CD van Niekerk Director and Principal Geologist with the firm GEMECS (Pty) Ltd. Mr van Niekerk is a Professional Natural Scientist with the South African Council for Natural Scientific Professions (SACNASP), Registration No. 400066/98 and a Fellow Member of the Geological Society of South Africa. He has relevant experience and technical qualifications to be a "Qualified Person" for reporting coal resources to the NI 43-101 Standard and for the purposes of the AIM Rules for Companies.

 

The Company's Exploration Director, Noel O'Keeffe has reviewed the resource report and the references to them in this announcement.

 

 

Johannesburg

08 July 2016

Corporate and Designated Adviser

River Group

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSSUSIAFMSEDW
Date   Source Headline
21st May 20187:00 amRNSEPC Contract Signed
21st May 20187:00 amRNSFinal Lot of EPC Contract Signed on MCPP
17th May 201810:00 amRNSChange of South African Share Registrar
1st May 201810:44 amRNSIssue of Equity and Directorate Change
17th Apr 20188:00 amRNSUK Investor Show
10th Apr 20182:00 pmRNSCompany Update
5th Apr 20182:00 pmRNSCorrection of Broker Information
5th Apr 201812:51 pmRNSMCPP PPA Update
3rd Apr 201811:15 amRNSAcquisition of a Botswana Power Project Completed
26th Mar 20184:40 pmRNSSecond Price Monitoring Extn
26th Mar 20184:35 pmRNSPrice Monitoring Extension
21st Mar 20188:00 amRNSTanzanian Government Prioritises Private Sector
5th Mar 201810:30 amRNSNew Broker & Update on Placement Proceeds
2nd Mar 201811:45 amRNSUpdate on Broker and Placement Proceeds
2nd Mar 20188:01 amRNSHolding(s) in Company
1st Mar 20189:15 amRNSWarrant Update
1st Mar 20187:30 amRNSNew Corporate Presentation
27th Feb 20184:34 pmRNSPress Speculation
27th Feb 20189:00 amRNSPlacing to raise £750,000
14th Feb 201810:31 amRNSKibo Signs MOU with TANESCO on MCPP
5th Feb 20188:25 amRNSMOU Update
17th Jan 20189:44 amRNSHoldings in Company
10th Jan 20182:15 pmRNSMbeya Coal to Power Project MOU & PPA Update
5th Jan 20187:00 amRNSMbeya Coal to Power Project MOU Update
18th Dec 20177:00 amRNSMbeya Power Project MOU and PPA Update
7th Dec 20178:00 amRNSShareholder Conference Call
30th Nov 20177:00 amRNSAcquisition of Strategic Botswanan Power Project
17th Nov 20178:27 amRNSMonthly Q&A for Investors
16th Nov 20177:00 amRNSUpdated MCPP MOU to Fast-track PPA
31st Oct 20178:00 amRNSCEO Mr Cotzee presenting at OBOR summit in Beijing
27th Oct 20177:00 amRNSMCPP Awarded ESIA Certificate from the Government
12th Oct 20179:37 amRNSKibo's October Investor Q&A Will Be Released Today
28th Sep 20177:00 amRNSConversion of Loan Notes
27th Sep 20177:00 amRNSConvertible Loan Notes
26th Sep 20172:00 pmRNSInterim Results
18th Sep 20177:00 amRNSPPA and Financing Update for African Power Project
12th Sep 20172:45 pmRNSMonthly Q&A for Investors
8th Sep 20178:00 amRNSWins GE Innovation Award for African Power Project
5th Sep 201710:30 amRNSAppointment of Adviser
29th Aug 20177:00 amRNSMCPP Finalizes Transmission Line Bid
22nd Aug 20177:00 amRNSMbeya Coal to Power Project ("MCPP") - Update
26th Jul 20177:00 amRNSMbeya Coal to Power Project ("MCPP") - Update
20th Jul 20177:00 amRNSImweru Drill Programme Complete
14th Jul 201712:30 pmRNSMbeya Coal to Power Project ("MCPP") - Update
12th Jul 20177:00 amRNSImweru Drill Programme Ahead of Schedule
10th Jul 201710:01 amRNSChange of Registered Office
4th Jul 20177:59 amRNSComment on Proposed Legislative Change in Tanzania
4th Jul 20177:00 amRNSComment on Proposed Legislative Change in Tanzania
30th Jun 201711:15 amRNSResult of AGM
23rd Jun 20178:00 amRNSProactive-Investors One2One event on 29 June 2017

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.