Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKibo Energy Regulatory News (KIBO)

Share Price Information for Kibo Energy (KIBO)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.035
Bid: 0.03
Ask: 0.04
Change: 0.00 (0.00%)
Spread: 0.01 (33.333%)
Open: 0.035
High: 0.035
Low: 0.035
Prev. Close: 0.035
KIBO Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

MCPP: Completion of Water Availability Study

30 Jun 2016 07:00

RNS Number : 6931C
Kibo Mining Plc
30 June 2016
 

Kibo Mining Plc

(Incorporated in Ireland)

(Registration Number: 451931)

(External registration number: 2011/007371/10)

Share code on the JSE Limited: KBO

Share code on the AIM: KIBO

ISIN:IE00B97C0C31

("Kibo" or "the Company")

 

30 June 2016

 

Mbeya Coal to Power Project: Completion of Water Availability Study

Kibo Mining plc ("Kibo" or the "Company") (AIM: KIBO; AltX: KBO), the Tanzania focussed mineral exploration and development company is pleased to announce completion of the independent, integrated Water Availability Study for the Mbeya Coal to Power Project ("MCPP").

The Water Availability Study ("the Study"), to determine sustainable groundwater yields and pit inflows through aquifer testing and numerical flow modelling, was performed by Shangoni Management Services, the consultants appointed to execute the Environmental and Social Impact Assessment for the MCPP. The following activities formed part of the Study:

1. Geophysics (resistivity surveys) within the vicinity of the Study area, with focus in and around the pit area to determine geological anomalies or lineaments and preferential flow paths for the movement of groundwater.

2. Drilling of boreholes into identified anomalies.

3. Aquifer testing (slug and pump testing) to determine aquifer hydraulics for flow modelling (pit inflows) and sustainable borehole yields.

4. Water sampling for hydro chemical and biological analyses (and general borehole surveys including GPS surveying (XYZ) and static water levels for model calibration.

5. Numerical modelling inclusive of steady- and transient state flow models to determine pit inflows for the Life of Mine ("LoM") and dewatering strategies. The numerical model aimed to:

a. estimate the groundwater seepage rate to the pit over the Life of Mine (LOM); and

b. estimate the sustainable yield of the aquifer(s) in the area with a view to meeting the bulk water supply to the proposed project.

The Study concluded that ground water would be available in sufficient and sustainable quantities throughout the life of plant, to adequately supply the power station with water in accordance with the power plant design specifications, stated in the MCPP Power Feasibility Study.

 

Louis Coetzee, CEO of Kibo Mining plc said " We are delighted with the outcome of the Water Availability Study and with yet another work stream completed we are getting ever closer to concluding work on the MCPP feasibility studies. This study also formed a very important part of the ESIA which is now also nearing completion as scheduled."

Contacts

 

 

Louis Coetzee

+27 (0) 83 2606126

Kibo Mining plc

Chief Executive Officer

Andreas Lianos

+27 (0) 83 4408365

River Group

Corporate Adviser and Designated Adviser on JSE

Jon Belliss

+44 (0) 207 382 8300

Beaufort Securities Limited

Broker

Oliver Morse

+61 8 9480 2500

RFC Ambrian Limited

Nominated Adviser on AIM

Daniel Thöle / Anna Legge

 

+44 (0) 203 772 2500

 

Bell Pottinger

Investor and Media Relations

 

Kibo Mining - Notes to editors

Kibo Mining is listed on the AIM market in London and the AltX in Johannesburg. The Company is focused on exploration and development of mineral projects in Tanzania, and controls one of Tanzania's largest mineral right portfolios. Tanzania provides a secure and stable operating environment for the mineral resource industry and Kibo Mining therein.

 

Kibo Mining holds a thermal coal deposit at Mbeya, which has a significant NI 43-101 compliant defined resource, and is developing a 250-350 MW mouth-of-mine thermal power station, the Mbeya Coal to Power Project ("MCPP"), previously called Mbeya Coal to Power Project ("MCPP"), with an established management team that includes Standard Bank as Financial Advisor. Kibo is undertaking a Coal Mining Definitive Feasibility Study and a Power Pre-Feasibility Study for the Mbeya project with an integrated Bankable Feasibility Study report for the MCPP to be released in the near term. On 20th April 2015, Kibo signed a Joint Development Agreement for the completion of the Definitive Feasibility Studies and development of the MCPP with China based EPC contractor SEPCO III.

 

The Company also has extensive gold focused interests including Lake Victoria Goldfields and Morogoro projects. At Lake Victoria, the Company has projects with a 550,000 oz. JORC compliant gold Mineral Resource at Imweru Project and a 168,000 oz. NI 43-101 compliant gold Mineral Resource at the Lubando Project in which the Company holds a 90% attributable interest. The Company is currently undertaking a Definitive Feasibility Study on its Imweru Project.

 

Kibo also holds the Haneti Project on which the latest technical report confirms prospectivity for nickel, PGMs, gold and strategic metals including lithium.

 

Kibo Mining further holds the Pinewood (coal & uranium) project where the company has entered into a 50/50 Exploration Joint Venture with Metal Tiger plc.

 

Finally, the Company also holds the Morogoro (gold) project where the company has also entered into a 50/50 Exploration Joint Venture with Metal Tiger plc.

 

The Company's projects are located in the established and gold prolific Lake Victoria Goldfields, the emerging goldfields of eastern Tanzania and the Mtwara Corridor in southern Tanzania where the Government has prioritized infrastructural development attracting significant recent investment in coal and uranium. The Company has a positive working relationship with the Tanzanian government at local, regional and national levels and works hard to maintain positive relationships with all communities where company interests are held. The Company recognizes the potential to enhance the quality of life and opportunity for Tanzanian citizens through careful development of its projects.

 

Updates on the Company's activities are regularly posted on its website www.kibomining.com

 

Johannesburg

30 June 2016

Corporate and Designated Adviser

River Group

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEALKNALLKEFF
Date   Source Headline
29th Jun 20237:00 amRNSAnnual Financial Report
16th Jun 20233:51 pmRNSHolding(s) in Company
2nd Jun 20232:30 pmRNSResults of EGM
26th May 202312:15 pmRNSWarrant Exercise
23rd May 20232:30 pmRNSKibo Subsidiary MED Issue of Shares
22nd May 20233:00 pmRNSKibo Subsidiary Issue of Shares
18th May 20237:00 amRNSMED Update, JV and Reprofiling of Loan Facilities
18th May 20237:00 amRNSMbeya Power Update
12th May 202311:45 amRNSTR-1
11th May 20237:00 amRNSNotice of Extraordinary General Meeting
4th May 20238:00 amRNSUpdate regarding Kibo Warrant Exercise and TVR
4th May 20237:00 amRNSMED Q1 Corporate Presentation and Website Update
2nd May 20237:00 amRNSBio-fuel Projects Test Work & Director Retirement
28th Apr 20237:02 amRNSMast Energy Developments PLC Annual Report
26th Apr 202312:20 pmRNSTR-1: Standard form for notification
26th Apr 20237:00 amRNSWarrant Exercise and Loan Note Conversion
12th Apr 20233:48 pmRNSTR-1: Standard notification of major holdings
11th Apr 20237:00 amRNSWarrant Repricing CLN Conversion & Bridge Loan
6th Apr 20234:45 pmRNSKibo Project Update
16th Mar 20231:35 pmRNSAdjournment of EGM
10th Mar 20237:00 amRNSGroup Business Development Executive Appointment
1st Mar 20237:00 amRNSConvertible Instrument - Redemption Date Extension
27th Feb 20239:20 amRNSMED Pyebridge Update
22nd Feb 20238:00 amRNSNotice of Extraordinary General Meeting (“EGM”)
13th Feb 20239:05 amRNSSecond Price Monitoring Extn
13th Feb 20239:00 amRNSPrice Monitoring Extension
1st Feb 20237:00 amRNSOperational Update: 2023
25th Jan 202311:07 amRNSIssue of Shares in lieu of Payment
17th Jan 20239:15 amRNSOptimization Improvement to 1st SA WTE Project
11th Jan 20237:30 amRNSRestoration - Kibo Energy plc
11th Jan 20237:00 amRNSAppointment of NOMAD & Director and General Update
15th Dec 20222:10 pmRNSSettlement Shares Sale
12th Dec 20227:30 amRNSSuspension – Kibo Energy plc
9th Dec 20221:50 pmRNSNomad Update and Suspension
5th Dec 20229:20 amRNSConvertible Instrument Redemption Date Extension
23rd Nov 20227:00 amRNSKibo Renews MOU with Tanzanian Utility, TANESCO
15th Nov 202210:00 amRNSRetirement of Director
10th Nov 20221:45 pmRNSTR1 Standard form for notification major holdings
28th Oct 20221:00 pmRNSResults of Reconvened AGM
7th Oct 20227:00 amRNSNotice of Reconvened Annual General Meeting
29th Sep 20227:00 amRNSKibo Strategic IPO Spinout
23rd Sep 20229:30 amRNSInterim results for the 6 months ended 30/06/22
21st Sep 20227:45 amRNSAcquisition of Advanced UK Waste to Energy Project
16th Sep 20221:00 pmRNSAdjournment of AGM
8th Sep 20223:20 pmRNSConvertible Instrument Update
25th Aug 20227:00 amRNSUpdate on Sustainable Energy Solutions Strategy
24th Aug 20227:41 amRNSNotice of AGM
18th Aug 20222:10 pmRNSTR-1: notification of major holdings
12th Aug 20221:45 pmRNSTR-1: Notification of major holdings
29th Jul 20222:15 pmRNSPartial Settlement of Outstanding MED Loan

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.