Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
7.00    0.00 (0.00%)
Bid:
6.50
Ask:
7.50
Spread: 1.00 (15.385%)
Market Cap: £28.65m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Sonora Lithium Project Drilling Results

22 May 2015 07:00

RNS Number : 9929N
Rare Earth Minerals PLC
22 May 2015
 

22 May 2015

 

Rare Earth Minerals Plc.

 

("Rare Earth Minerals", "REM" or "the Company")

 

Sonora Lithium Project Drilling Results

Rare Earth Minerals Plc (LSE AIM: REM)) is pleased to announce the assay results of the 23 hole drilling campaign completed on the Sonora Lithium Project, Sonora Mexico ("the Project"), previously announced on 23 March 2015.

The campaign was primarily carried out on La Ventana and consisted of infill drilling. The geological intersections were utilised in the Mineral Resource Estimate published on the 14 May 2015.

In addition, we report the hole that was drilled to identify possible resource expansion targets to the west of the current delineated ore bodies at La Ventana and El Sauz / Fleur, which successfully intersected two clay beds at shallow depth and returned strong assay results of up to 2.3% LCE.

Highlights:

· A total of 2,946 metres were drilled in the 22 in-fill holes from La Ventana.

· Intercepts of the Upper Clay range from 26.10 to 50.83 metres in length and those for the Lower Clay range from 12.98 to 23.57 metres at La Ventana.

· Analyses received for 18 of the 22 holes indicate that the lithium content of both the Upper and Lower clays increase to the south at La Ventana as well as maintaining grade and thickness:

o Weighted averages (Table 1 below) for lithium content in the Upper Clay Unit varies from 955 ppm Li (0.5% LCE ) over 41.6 metres (hole LV-19) to 3,215 ppm Li (1.7% LCE) over 17.48 metres (hole LV-27);

o For the Lower Clay Unit lithium content varies from 1,143 ppm Li (0.6% LCE) over 19.20 metres (hole LV-18) to 5,830 ppm Li (3.1% LCE) over 20.42 metres (LV-27).

o Individual 1.5 metre long samples of clay range up to 10,000 ppm Li (5.32% LCE).

· The hole drilled on the Fleur concession intersected 7.16 metres of the Upper Clay unit, which averaged 3,107 ppm Li (1.7% LCE) and 25.30 metres of the Lower Clay, which averaged 4,242 ppm Li (2.3% LCE).

A map with the drill holes highlighted is available on the Company's website (www.rareearthmineralsplc.com)

David Lenigas, the Company's Chairman commented:

"We are delighted with the assay results from the La Ventana infill drilling programme, these numbers correlate well with our current geological model, in particular the higher grades in southern portion of Ventana and northern portion of Fleur."

"Additionally, the assay results in the exploratory hole at Fleur were very encouraging, given both the strong assay results and the intersection of the mineralised zone from only 17 metres below the surface, we believe this to be viable target for further exploration work, with the potential to deliver further mineral resources at low strip ratios."

Details of REM's ownership:

REM owns a direct interest of 15.4% in Bacanora (AIM:BCN), and through that holds an indirect interest in the La Ventana asset of 15.4%. In addition the 15.4% in Bacanora, when aggregated with REM's 30% direct interest in Megalit S.A de CV (the company holding the Buenavista, Megalit and San Gabriel concessions) and the 30% direct interest in Mexalit S.A de CV (the company holding El Sauz, El Sauz 1, El Sauz 2, Fleur and Fleur 1 concessions), results in a total economic interest in each of these companies of Megalit S.A. de CV and Mexalit S.A. de CV of 40.78%.

Table 1. Summary of Lithium-bearing intercepts - La Ventana

Hole No

Unit

From (m)

To (m)

Length (m)

Weighted average Li ppm

LCE %

LV-18

Upper Clay

218.24

245.67

27.43

577

0.3

including

226.31

230.43

4.12

1,213

0.65

Lower Clay

260.30

279.50

19.20

1,143

0.6

including

274.02

279.50

5.49

2,248

1.2

LV-19

Upper Clay

10.24

51.82

41.58

955

0.5

including

16.46

22.40

5.94

1,340

0.7

including

32.92

48.77

15.85

1,595

0.85

LV-20

Upper Clay

219.46

252.07

32.61

584

0.3

including

240.49

247.19

6.71

1,284

0.7

Lower Clay

268.35

291.39

23.04

1,618

0.9

including

279.20

289.86

10.67

2,141

1.1

LV-21

Upper Clay

8.92

59.74

50.83

1,194

0.6

including

30.96

38.71

7.75

2,264

1.2

including

49.07

59.74

10.67

2,150

1.1

Lower Clay

72.24

92.96

20.73

1,759

0.9

including

80.16

92.96

12.80

2,649

1.4

LV-22

Upper Clay

25.91

35.86

9.96

1,339

0.7

Upper Clay

44.50

57.30

12.80

2,643

1.4

Lower Clay

77.40

90.02

12.62

3,915

2.1

LV-23

Upper Clay

38.56

53.64

15.10

2,982

1.6

Lower Clay

69.65

85.95

16.20

3,756

2.0

LV-24

Upper Clay

101.19

112.17

11.00

1,716

0.9

Upper Clay

116.43

130.02

13.60

2,780

1.5

Lower Clay

145.21

158.88

13.60

4,122

2.2

LV-25

Upper Clay

137.72

155.75

18.03

2,199

1.2

including

145.08

154.23

9.14

3,035

1.6

LV-26

Upper Clay

30.48

48.77

18.29

2,018

1.1

Lower Clay

59.44

76.05

16.61

2,701

1.4

including

59.44

66.45

7.01

4,203

2.2

LV-27

Upper Clay

48.67

66.14

17.48

3,215

1.7

Lower Clay

78.03

98.45

20.42

5,830

3.1

LV-28

Upper Clay

138.38

165.93

27.55

2,617

1.4

including

153.62

165.93

12.31

4,306

2.3

Lower Clay

179.83

203.30

23.47

5,228

2.8

LV-29

Upper Clay

8.23

35.66

27.43

2,284

1.2

including

24.69

35.66

10.97

3,297

1.8

Lower Clay

51.82

79.25

27.43

4,507

2.4

including

51.82

74.68

22.86

5,395

2.9

LV-31

Upper Clay

147.83

185.52

37.69

1,453

0.8

including

173.61

185.52

11.91

2,963

1.6

Lower Clay

203.68

227.38

23.70

2,921

1.6

including

206.65

218.85

12.19

4,174

2.2

LV-35

Lower Clay

12.34

33.41

21.06

5,786

3.1

LV-36

Lower Clay

15.32

35.36

20.04

4,370

2.3

LV-37

Lower Clay

14.81

35.36

20.55

4,105

2.2

LV-38

Lower Clay

13.92

37.49

23.57

3,153

1.7

LV-39

Lower Clay

6.40

26.52

20.12

2,379

1.3

 

Table 2. Summary of Lithium-bearing intercepts - Fleur

Hole No

Unit

From (m)

To (m)

Length (m)

Weighted average Li ppm

LCE %

ES-42

Upper Clay

16.15

23.32

7.16

3,107

1.7

Lower Clay

39.32

64.62

25.30

4,242

2.3

 

The lithological intersections from these drill results were used in the MRE prepared by SRK Consulting (UK) Limited (as announced by the Company via its news release dated May 13, 2015), however as the assay results were not available at the time and therefore were excluded from the MRE calculations.

Qualified Person:

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

Ends

For further information please contact: 

Rare Earth Minerals plc +44 (0) 207 440 0647

David Lenigas

Kiran Morzaria

 

WH Ireland Limited (NOMAD & Broker) +44 (0) 207 220 1666

James Joyce

Mark Leonard

Square1 Consulting

David Bick +44 (0) 207 929 5599

Mark Longson

Glossary:

LCE: is the industry standard terminology for, and is equivalent to, Li2CO3. 1 ppm Li metal is equivalent to 5.32 ppm LCE / Li2CO3. Use of LCE is to provide data comparable with industry reports and assumes complete conversion of lithium in clays with no recovery or process losses.

ppm: parts per million

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLPGURPAUPAPPG
Date   Source Headline
15th Apr 20164:40 pmRNSSecond Price Monitoring Extn
15th Apr 20164:35 pmRNSPrice Monitoring Extension
8th Apr 201611:59 amRNSPre-Feasibility Study at Yangibana REE Project
1st Apr 20164:40 pmRNSSecond Price Monitoring Extn
1st Apr 20164:35 pmRNSPrice Monitoring Extension
1st Apr 20169:03 amRNSMacarthur Minerals Expands Lithium Project
31st Mar 20166:14 pmRNSTotal Voting Rights
31st Mar 201612:02 pmRNSEMH Lithium Process Update
18th Mar 20167:00 amRNSREM acquires interest in Macarthur Minerals
16th Mar 20167:00 amRNSYangibana REE Project Update
15th Mar 20163:58 pmRNSEMH Interim Financial Report
4th Mar 20167:00 amRNSREM increases stake in the Cinovec Lithium Project
3rd Mar 20167:25 amRNSSonora Lithium Project - Pre-Feasibility Study
1st Mar 201610:59 amRNSBacanora Minerals Interim Results Released
29th Feb 20164:40 pmRNSSecond Price Monitoring Extn
29th Feb 20164:35 pmRNSPrice Monitoring Extension
29th Feb 20167:00 amRNSFundraising
18th Feb 20168:20 amRNSEuropean Metals - Drill Program Update
11th Feb 20167:58 amRNSCinovec Lithium Project - Update
29th Jan 201610:06 amRNSEuropean Metals - Quarterly Activities Release
15th Jan 20163:32 pmRNSCinovec Lithium Project - Drilling Update
6th Jan 20167:00 amRNSFiling of Technical Report
4th Jan 20164:40 pmRNSSecond Price Monitoring Extn
4th Jan 20164:35 pmRNSPrice Monitoring Extension
21st Dec 20157:00 amRNSDirectorate Change
17th Dec 20157:43 amRNSADRs Admitted for Trading
10th Dec 20157:43 amRNSEMH Admission to AIM
9th Dec 20157:00 amRNSLaunch of American Depository Receipt Program
8th Dec 20152:00 pmRNSSonora Lithium Project - Offtaker Update
23rd Nov 20157:00 amRNSSignificant Resource Increase at Sonora Project
17th Nov 201510:36 amRNSCinovec Lithium Project - Drilling Update
16th Nov 20157:38 amRNSREM Maintains Stake in Bacanora Placing
12th Nov 20152:59 pmRNSEuropean Metal Holdings - AIM Listing Update
10th Nov 20152:04 pmRNSYangibana Update
28th Oct 20157:00 amRNSAdmission to the ISDX Growth Market
20th Oct 20158:52 amRNSCinovec Lithium Project - Update
15th Oct 20155:00 pmRNSApplication for Admission to ISDX
15th Oct 20154:41 pmRNSREM increases interest in European Lithium Project
7th Oct 20157:00 amRNSHolding(s) in Company
6th Oct 20154:33 pmRNSCinovec Lithium Project, Drilling Update
6th Oct 20152:24 pmRNSYangibana REE Project Update
2nd Oct 201512:39 pmRNSAgreement with YAGM
21st Sep 20157:00 amRNSInterim Results
17th Sep 201511:06 amRNSHolding(s) in Company
17th Sep 20159:15 amRNSREM increases strategic holding in Bacanora
2nd Sep 20157:00 amRNSREM increases strategic holding in Bacanora
1st Sep 20157:03 amRNSDrilling Results & Accelerated Drilling Programme
28th Aug 20154:40 pmRNSSecond Price Monitoring Extn
28th Aug 20154:35 pmRNSPrice Monitoring Extension
28th Aug 20157:00 amRNSSonora Project Signs Lithium Supply Contract

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.