Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
7.65    0.40 (5.52%)
Bid:
7.30
Ask:
8.00
Spread: 0.70 (9.589%)
Market Cap: £31.31m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Pre-Feasibility Study at Yangibana REE Project

8 Apr 2016 11:59

RNS Number : 6614U
Rare Earth Minerals PLC
08 April 2016
 

Rare Earth Minerals Plc

("Rare Earth Minerals", "REM" or "the Company")

Pre-Feasibility Study at the Yangibana Rare Earth Element Project.

Rare Earth Minerals Plc (AIM: REM; OTC REMMY) is pleased to announce that Hastings Technology Metals Limited ('Hastings'), has today published a summary of the Pre-Feasibility Study ("PFS") for the the Yangibana Rare Earth Element Project (the "Project") in north-west Australia. REM is a 30% joint venture partner Yanginbana North concession which forms part of the Project and is covered by the PFS, further details of REM's ownership is fully described below.

The full Hastings news release dated 8 April 2016 is available at: http://www.hastingstechmetals.com/images/asx_latest/PFS_Announcement_-_FINAL_CL_FINAL3.pdf. The full Hastings release also contains information on Bald Hill South, Fraser's and Yangibana West in which REM has no interest and it should be noted that the overall PFS including the Net Present Value estimated does not separately identify the attributable part of the Yangibana North Concession in which REM has the 30% interest.

 

A technical report on the PFS will be forthcoming within the next four weeks.

Highlights of the Full PFS:

· Toll Treatment Model: Hydrometallurgical concentrate produced on site will be shipped overseas for further separation and refining into individual rare earth oxides. Allowing the Project to fast track to prodcution in 2019.

· Robust project economics:

o Payback of capital cost - 2.5 years

o Net present value estimated between AS$700-750 million (based on 8% discount rate)

o Internal rate of return estimated at 40%

· Long-term mine life:

o 7 year mine life with a total of 60,500 tonnes of separated oxides produced

o Average strip ratio of 9.4:1

o Average diluted TREO grade over mine life 1.15%

· Off take contracts - prospects for the supply of rare earth hydromet concentrate to overseas customers are promising given ongoing negotiations.

· Non Disclosure Agreements - signed with potential end customers of separated rare earth oxides and metals

Commenting on the PFS, Kiran Morzaria, Chief Executive Officer of REM, said:

"The PFS for the Yangibana Rare Earth Project has confirmed the potential we saw in 2011. The project is now at an advanced stage with very strong fundamentals. For us, a notable take-away from this study is both the high internal rate of return and the quick payback of capital costs; these metrics point to potentially high levels of growth in the project."

Details of Ownership:

On 1 December 2011, REM announced that it had acquired a 30% free carried interest to Bankable Feasibility Study ("BFS") of the Yangibana North Rare Earth Deposit. The exploration costs until the commencement of the BFS are therefore borne solely by Hastings Rare Metals Limited (70% owners and operator). The same terms agreed and announced on 1 December 2012 also apply to Gossan, Hook, Kanes Gossan, Lions Ear and Bald Hill North.

Qualified Person:

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance).

- Ends -

For further information, please contact: 

Rare Earth Minerals plc

Andrew Suckling

+1 (212) 933 9007

Kiran Morzaria

+44 (0) 207 440 0647

WH Ireland Limited (NOMAD & Broker)

+44 (0) 207 220 1666

James Joyce

Mark Leonard

Square1 Consulting

+44 (0) 207 929 5599

David Bick

Brain Alexander

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBVLFBQZFEBBE
Date   Source Headline
28th May 202611:15 amRNSAzteca Restart Update
19th May 20268:44 amRNSHolding(s) in Company
7th May 202610:36 amRNS-RCEO Interview on grant of Installation License
6th May 20265:32 pmRNSIssue of Options
5th May 20267:00 amRNSAmapá – Installation Licence Granted
2nd Apr 20268:00 amRNS-RInvestor Presentation via Investor Meet Company
2nd Apr 20267:05 amRNSIssue of shares to EBT and Total Voting Rights
2nd Apr 20267:00 amRNSAmapá Project Update - Licensing and Azteca
25th Mar 20267:00 amRNSSonora Lithium Project Arbitration Funding
13th Mar 20267:06 amRNSAmapá Project Update
13th Mar 20267:06 amRNSAmapá Project Update
9th Jan 202610:35 amRNS-RInvestor Presentation via Investor Meet Company
7th Jan 202610:32 amRNS-RCEO Interview on Amapá & Azteca Plant
6th Jan 20267:00 amRNSGrant of Preliminary Environmental Licence - Amapá
15th Dec 20257:00 amRNSAmapá Project Update
12th Dec 20257:00 amRNSAmapá Project Update
1st Dec 20257:00 amRNSExecution of Binding Prepayment Offtake Agreement
17th Nov 202511:09 amRNSUpdate on Offtake Financing for the Azteca Plant
6th Oct 20257:00 amRNSResult of Oversubscribed WRAP Retail Offer
3rd Oct 20251:41 pmRNSEarly Close of WRAP Retail Offer
2nd Oct 20257:00 amRNSWRAP Retail Offer for up to £200,000
30th Sep 20257:00 amRNSFunding Secured for Azteca Offtake Agreement
29th Sep 202511:38 amRNSInterim Results for six months ended 30 June 2025
29th Sep 202510:51 amRNSResult of General Meeting
12th Sep 202511:49 amRNSNotice of GM
10th Sep 20258:08 amRNS-RCEO interview on Funding & Azteca/Amapá Production
9th Sep 20257:00 amRNSCadence Signs Terms to Restart Azteca Plant
18th Aug 20257:00 amRNSSignificant Mining Cost Reduction at Amapá Project
6th Aug 20253:19 pmRNSResult of AGM
10th Jul 20252:42 pmRNSNotice of AGM
9th Jul 20252:45 pmRNSCorp Update - EG1 commences exploration at Leonora
8th Jul 202510:31 amRNSAdmission of Shares
1st Jul 20258:29 amRNS-RCEO Interview Regarding Amapa Developments
27th Jun 20251:36 pmRNSDirector Share Purchases
27th Jun 20257:00 amRNSAmapa Production Plan & Equity Subscription
18th Jun 20253:13 pmRNSAnnual Results for the year ended 31 December 2024
10th Jun 202511:59 amRNSAmapa Iron Ore Project Update
7th May 20254:33 pmRNSCorporate Update–retraction to EG1 acquire Leonora
6th May 20257:00 amRNSCorporate Update - EG1 acquires Leonora Goldfields
17th Jan 20258:47 amRNSIssue of Options
15th Jan 202510:24 amRNSEverGreen: LCT Pegmatite & Gold at Bynoe Project
17th Dec 20247:00 amRNSLOI to acquire Projects, £1m Fundraise & Updates
3rd Dec 20247:00 amRNSUpdated PFS Economic Study Delivers Increased NPV
26th Nov 20247:00 amRNSAmapa Iron Ore Project Update
18th Nov 20247:00 amRNSEverGreen – RC Drilling Commenced at Bynoe Project
29th Oct 20249:07 amRNSEverGreen – Spodumene Discovery at Bynoe Project
18th Oct 20242:55 pmRNSResults of AGM
17th Oct 20248:07 amRNSCorporate Update
27th Sep 20247:00 amRNSInterim Results
17th Sep 20247:00 amRNSAmapá Project Licensing on Schedule

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.