Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

Share Price is delayed by 15 minutes
Get Live Data
7.65    0.40 (5.52%)
Bid:
7.30
Ask:
8.00
Spread: 0.70 (9.589%)
Market Cap: £31.31m
KDNC Live PriceLast checked at - London Stock Exchange

Intraday Cadence Mineral Share Chart

Lithium Mineralisation Intersected at Cinovec

6 Oct 2016 09:19

RNS Number : 8709L
Rare Earth Minerals PLC
06 October 2016
 

Rare Earth Minerals Plc

("Rare Earth Minerals", "REM" or "the Company")

 

Shallow Lithium Mineralisation Intersected at Cinovec

 

Rare Earth Mineral Plc (AIM: REM; OTC: REMMY) is pleased to report that European Metals Holdings Limited ("EMH"), in which REM owns a 20.92% shareholding, has announced analytical results for two confirmation drillholes CIW-19 and CIW-20 at the Cinoved Lithium-Tin-Tungsten Project ("Cinovec"). The full EMH announcement can be found at: http://europeanmet.com/assets/AIM_-_6_October_2016_-_Shallow_Lithium.pdf

 

Highlights:

· The two drillholes are the most northern drilled by the Company and are collared near the old main shaft.

 

· Significant lithium mineralization intersected from less than 30m depth in both holes, these are the shallowest intervals to-date.

 

· Drillhole CIW-19 returned two main lithium-mineralized intercepts of 53.1m averaging 0.35%Li2O (25-78.1m) and 144m averaging 0.37%Li2O (85-229m), with a high-grade interval of 10.8m@0.71% Li2O (103-113.8m).

 

· Drillhole CIW-20 returned three main mineralized intercepts: 98m averaging 0.35%Li2O (28-126m), 16.85m averaging 0.33% Li2O (132.15-149m) and 60m averaging 0.49%Li2O (154-214m), with the latter containing high-grade intervals of 9m@0.67%Li2O (160-169m) and 12.1m@0.85%Li2O (174-186.1m).

 

· Significant tin and tungsten mineralization was intersected in upper part of both drillholes: 3.1m@0.20%Sn and 0.021%W, 4.75m@0.13%Sn and 0.015%W, 2.45m@0.17%Sn and 0.003%W and 1.35m@0.122%W and 0.07%Sn in drillhole CIW-19; 3m@0.37%Sn and 0.003%W, and 1m@0.36%Sn and 0.004%W in drillhole CIW-20.

 

· Drilling continues in the western part of the Cinovec deposit (targeting high-grade zones near the rhyolite/granite contact) and in the central part (targeting near-surface mineralization on the flanks of the historic underground mine). Altogether, eight drillholes have been completed this year (2,791m) with three other underway at this time.

 

Kiran Morzaria, Chief Executive Officer of Rare Earth Minerals, commented:

 

"Rapid progress continues to be made in advancing the Cinovec Project. These developments along with the excellent economics present in the scoping study, re-affirm that the Cinovec project will, we believe, become a low cost, market leading lithium and tin asset.

 

Qualified Person:

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance).

 

- Ends -

For further information, please contact: 

Rare Earth Minerals plc

Andrew Suckling +1 (212) 933 9007

Kiran Morzaria +44 (0) 207 440 0647

 

WH Ireland Limited (NOMAD & Broker) +44 (0) 207 220 1666

James Joyce

James Bavister

 

Square1 Consulting +44 (0) 207 929 5599

David Bick

Brian Alexander

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLIFITIALRIIR
Date   Source Headline
28th May 202611:15 amRNSAzteca Restart Update
19th May 20268:44 amRNSHolding(s) in Company
7th May 202610:36 amRNS-RCEO Interview on grant of Installation License
6th May 20265:32 pmRNSIssue of Options
5th May 20267:00 amRNSAmapá – Installation Licence Granted
2nd Apr 20268:00 amRNS-RInvestor Presentation via Investor Meet Company
2nd Apr 20267:05 amRNSIssue of shares to EBT and Total Voting Rights
2nd Apr 20267:00 amRNSAmapá Project Update - Licensing and Azteca
25th Mar 20267:00 amRNSSonora Lithium Project Arbitration Funding
13th Mar 20267:06 amRNSAmapá Project Update
13th Mar 20267:06 amRNSAmapá Project Update
9th Jan 202610:35 amRNS-RInvestor Presentation via Investor Meet Company
7th Jan 202610:32 amRNS-RCEO Interview on Amapá & Azteca Plant
6th Jan 20267:00 amRNSGrant of Preliminary Environmental Licence - Amapá
15th Dec 20257:00 amRNSAmapá Project Update
12th Dec 20257:00 amRNSAmapá Project Update
1st Dec 20257:00 amRNSExecution of Binding Prepayment Offtake Agreement
17th Nov 202511:09 amRNSUpdate on Offtake Financing for the Azteca Plant
6th Oct 20257:00 amRNSResult of Oversubscribed WRAP Retail Offer
3rd Oct 20251:41 pmRNSEarly Close of WRAP Retail Offer
2nd Oct 20257:00 amRNSWRAP Retail Offer for up to £200,000
30th Sep 20257:00 amRNSFunding Secured for Azteca Offtake Agreement
29th Sep 202511:38 amRNSInterim Results for six months ended 30 June 2025
29th Sep 202510:51 amRNSResult of General Meeting
12th Sep 202511:49 amRNSNotice of GM
10th Sep 20258:08 amRNS-RCEO interview on Funding & Azteca/Amapá Production
9th Sep 20257:00 amRNSCadence Signs Terms to Restart Azteca Plant
18th Aug 20257:00 amRNSSignificant Mining Cost Reduction at Amapá Project
6th Aug 20253:19 pmRNSResult of AGM
10th Jul 20252:42 pmRNSNotice of AGM
9th Jul 20252:45 pmRNSCorp Update - EG1 commences exploration at Leonora
8th Jul 202510:31 amRNSAdmission of Shares
1st Jul 20258:29 amRNS-RCEO Interview Regarding Amapa Developments
27th Jun 20251:36 pmRNSDirector Share Purchases
27th Jun 20257:00 amRNSAmapa Production Plan & Equity Subscription
18th Jun 20253:13 pmRNSAnnual Results for the year ended 31 December 2024
10th Jun 202511:59 amRNSAmapa Iron Ore Project Update
7th May 20254:33 pmRNSCorporate Update–retraction to EG1 acquire Leonora
6th May 20257:00 amRNSCorporate Update - EG1 acquires Leonora Goldfields
17th Jan 20258:47 amRNSIssue of Options
15th Jan 202510:24 amRNSEverGreen: LCT Pegmatite & Gold at Bynoe Project
17th Dec 20247:00 amRNSLOI to acquire Projects, £1m Fundraise & Updates
3rd Dec 20247:00 amRNSUpdated PFS Economic Study Delivers Increased NPV
26th Nov 20247:00 amRNSAmapa Iron Ore Project Update
18th Nov 20247:00 amRNSEverGreen – RC Drilling Commenced at Bynoe Project
29th Oct 20249:07 amRNSEverGreen – Spodumene Discovery at Bynoe Project
18th Oct 20242:55 pmRNSResults of AGM
17th Oct 20248:07 amRNSCorporate Update
27th Sep 20247:00 amRNSInterim Results
17th Sep 20247:00 amRNSAmapá Project Licensing on Schedule

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.