We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.50
Bid: 3.40
Ask: 3.60
Change: 0.00 (0.00%)
Spread: 0.20 (5.882%)
Open: 3.50
High: 3.50
Low: 3.50
Prev. Close: 3.50
KDNC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Contract Awarded for Yangibana Processing Plant

21 Oct 2019 11:04

RNS Number : 5567Q
Cadence Minerals PLC
21 October 2019
 

Cadence Minerals Plc

 

("Cadence Minerals", "Cadence" or "the Company")

 

Hastings Technology Metals (ASX:HAS) - DRA Pacific Awarded EPCM Contract Yangibana Processing Plant.

 

Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to announce Hastings Technology Metals (ASX:HAS) ("Hastings"), Cadence's joint venture partner at the Yangibana Rare Earth Project in the Gascoyne region of Western Australia ("Yangibana Project"), has announced that it has awarded the Engineering, Procurement, Construction and Management (EPCM) contract for its rare earths processing plant and the associated infrastructure for the Yangibana process plant in the Gascoyne Region of Western Australia to DRA Pacific Pty Ltd ("DRA Pacific"), a diversified global engineering, project delivery and operations management. The appointment of DRA Pacific as the EPCM contractor for the Yangibana Project was preceded by a series of value engineering studies and the Front-End-Engineering-Design ("FEED") completed by DRA Pacific during 2018 and 2019. DRA Pacific's EPCM contract will cover all aspects of the design and construction of the processing facility and associated non-process infrastructure capable of producing 15,000 tonnes of Mixed Rare Earths Carbonate (MREC) per year.

Cadence Minerals Yangibana Holding:

Cadence owns 30% of the Yangibana North, Gossan, Hook, Kanes Gossan, Lions Ear and Bald Hill North Rare Earth Deposit, which form part of the Yangibana Rare Earth Deposit. Probable Ore Reserves of some 2.1 million tonnes at 1.66% total rare earth elements are contained within 30% owned joint venture tenements. Further details of these reserves and pre-feasibility study can be found at: http://irservices.netbuilder.com/ir/cadence/newsArticle.php?ST=REM&id=2688632.

Highlights:

·; DRA Pacific Pty Ltd awarded the Engineering, Procurement and Contract Management (EPCM) Contract for the Yangibana Rare Earths Processing Plant.

·; The scope of works under the DRA Pacific Pty Ltd EPCM agreement has an estimated capital value of circa A$350m.

·; DRA Pacific's parent DRA Global Ltd have extensive experience in designing and building mineral processing facilities worldwide and their personnel have previously delivered rare earth plants in Western Australia.

·; The key component of the contract terms is the comprehensive performance guarantee linked to ore throughput for the entire process flow sheet.

The EPCM contract is the single largest dollar value contract associated with the Yangibana Project. It is also a fundamental requirement of Hastings' debt providers and hence is pivotal to the project financing process. Works directed under the EPCM Contract have an estimated value of approximately A$350M.

The key component of the contract terms is the comprehensive performance guarantee linked to ore throughput for the entire process flow sheet.

The appointment of DRA Pacific as the EPCM contractor for Hastings represents another critical milestone for the Project, reinforcing that Yangibana is execution ready.

Choosing DRA Pacific was the logical choice given the already close working relationship built up over the last 15 months, and the experience in rare earths processing plant design that DRA Pacific bring to the table.

The full release can be found at: https://www.asx.com.au/asxpdf/20191021/pdf/449nzf57qlq659.pdf

Hastings Executive Chairman Charles Lew said: "We are pleased to have DRA involved in the construction of the Yangibana processing plant. Their knowledge and experience in developing successful minerals processing projects makes them the ideal candidate to manage the construction of our project. The award of the EPCM contract moves the Yangibana Rare Earths Project firmly into development phase to commence project execution and progress to production of our mixed rare earth carbonate by 2022."

Cadence CEO Kiran Morzaria commented: "The appointment of DRA Pacific represents a key step for Yangibana. Not only is it key to the project funding going forward, the EPCM contract terms include a comprehensive performance guarantee linked to ore throughput. Today's announcement provides further validation for our investment strategy into the Yangibana joint venture with Hastings."

- Ends -

For further information:

Cadence Minerals plc

+44 (0) 207 440 0647

Andrew Suckling

Kiran Morzaria

WH Ireland Limited (NOMAD & Broker)

+44 (0) 207 220 1666

James Joyce

James Sinclair-Ford

Novum Securities Limited (Joint Broker)

+44 (0) 207 399 9400

Jon Belliss

 

 

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

 

Forward-Looking Statements:

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ''believe'' ''could'' "should" ''envisage'' ''estimate'' ''intend'' ''may'' ''plan'' ''will'' or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding the Company's future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of the Company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. The Company cannot assure investors that actual results will be consistent with such forward-looking statements.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
CNTPGGUUUUPBGUG
Date   Source Headline
7th Oct 20227:00 amRNSMineral Resource Increase & Upgrade Amapá Project
28th Sep 20227:00 amRNSInterim Results for six months ended 30 June 2022
10th Aug 20223:50 pmRNSResult of AGM
12th Jul 20227:00 amRNSDirector Share Purchases
7th Jul 20222:58 pmRNSNotice of AGM
27th Jun 20227:00 amRNSCompletion of LT & LS sale & Amapa Project Update
23rd Jun 20227:00 amRNSSale of Yangibana JV Interest to Hastings
21st Jun 20227:00 amRNSAnnual Results for the year ended 31 December 2021
25th Apr 20228:53 amRNS4th Amapa Iron Ore Shipment Completed & En Route
19th Apr 20227:00 amRNSExercise of Warrants
11th Apr 202211:14 amRNSDirector Share Purchases
7th Apr 20229:50 amRNSCommencement of Shipment of Iron Ore from Amapa
30th Mar 20227:00 amRNSConditional Sale Agreement of its Stake in LT & LS
21st Mar 20227:00 amRNSPFS Update for the Amapa Project
15th Mar 20229:28 amRNSCadence completes to vest its 27% in Amapa Project
21st Feb 20223:42 pmRNSResult of Open Offer
21st Feb 20227:00 amRNSYangibana Project NPV Increases 84% to A$1bn
7th Feb 20227:00 amRNSAmapa - Formal Completion & Vesting of 20%
4th Feb 20221:45 pmRNSOpen Offer and Posting of Circular
3rd Feb 20229:05 amRNSSecond Price Monitoring Extn
3rd Feb 20229:00 amRNSPrice Monitoring Extension
3rd Feb 20227:00 amRNSResult of Placing & Subscription and TVR
2nd Feb 20224:40 pmRNSProposed Placing
2nd Feb 20221:54 pmRNSNAIF A$140m Loan - Yangibana Rare Earths Project
19th Jan 20222:05 pmRNSEMH Cinovec PFS Update - Outstanding Results
14th Jan 20227:00 amRNSProject & Corporate Updates. Presentation Q&A
5th Jan 20227:00 amRNSQuestions for Investor Q&A Session
29th Dec 202111:06 amRNSSecond Price Monitoring Extn
29th Dec 202111:00 amRNSPrice Monitoring Extension
29th Dec 20219:06 amRNSSecond Price Monitoring Extn
29th Dec 20219:00 amRNSPrice Monitoring Extension
29th Dec 20217:00 amRNSAmapa Iron Ore Project Update
25th Nov 202111:45 amRNSCastillo Extends Option Over Lithium Projects
22nd Nov 20218:57 amRNSCastillo Copper Picasso Lithium Project Update
1st Nov 20219:01 amRNSPort Concession Update, Amapa Project
27th Oct 20219:50 amRNSCastillo - Picasso Lithium Project Site Visit
20th Oct 202111:43 amRNSLitchfield Lithium surface sampling by Castillo
13th Oct 202110:27 amRNSEuropean Metals Cinovec Resource Upgrade
11th Oct 202111:05 amRNSSecond Price Monitoring Extn
11th Oct 202111:00 amRNSPrice Monitoring Extension
11th Oct 20219:05 amRNSSecond Price Monitoring Extn
11th Oct 20219:00 amRNSPrice Monitoring Extension
11th Oct 20217:00 amRNSBank Credit Committee Approval for Amapa Project
7th Oct 202112:19 pmRNSCastillo Litchfield Lithium Due Diligence Update
29th Sep 20217:01 amRNSOption Granted to Castillo to Acquire Projects
26th Aug 202112:00 pmRNSInterim Results
25th Aug 20213:58 pmRNSMacarthur Lake Giles Feasibility Study Progress
23rd Aug 20217:00 amRNSMacarthur Lakes Giles Feasibility Study Progress
18th Aug 20213:06 pmRNSYangibana Rare Earth Joint Venture Update
12th Aug 20212:39 pmRNSMacarthur Lake Giles Geotech Drill Programme

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.