The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.50
Bid: 3.40
Ask: 3.60
Change: 0.00 (0.00%)
Spread: 0.20 (5.882%)
Open: 3.50
High: 3.50
Low: 3.50
Prev. Close: 3.50
KDNC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Contract Awarded for Yangibana Processing Plant

21 Oct 2019 11:04

RNS Number : 5567Q
Cadence Minerals PLC
21 October 2019
 

Cadence Minerals Plc

 

("Cadence Minerals", "Cadence" or "the Company")

 

Hastings Technology Metals (ASX:HAS) - DRA Pacific Awarded EPCM Contract Yangibana Processing Plant.

 

Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to announce Hastings Technology Metals (ASX:HAS) ("Hastings"), Cadence's joint venture partner at the Yangibana Rare Earth Project in the Gascoyne region of Western Australia ("Yangibana Project"), has announced that it has awarded the Engineering, Procurement, Construction and Management (EPCM) contract for its rare earths processing plant and the associated infrastructure for the Yangibana process plant in the Gascoyne Region of Western Australia to DRA Pacific Pty Ltd ("DRA Pacific"), a diversified global engineering, project delivery and operations management. The appointment of DRA Pacific as the EPCM contractor for the Yangibana Project was preceded by a series of value engineering studies and the Front-End-Engineering-Design ("FEED") completed by DRA Pacific during 2018 and 2019. DRA Pacific's EPCM contract will cover all aspects of the design and construction of the processing facility and associated non-process infrastructure capable of producing 15,000 tonnes of Mixed Rare Earths Carbonate (MREC) per year.

Cadence Minerals Yangibana Holding:

Cadence owns 30% of the Yangibana North, Gossan, Hook, Kanes Gossan, Lions Ear and Bald Hill North Rare Earth Deposit, which form part of the Yangibana Rare Earth Deposit. Probable Ore Reserves of some 2.1 million tonnes at 1.66% total rare earth elements are contained within 30% owned joint venture tenements. Further details of these reserves and pre-feasibility study can be found at: http://irservices.netbuilder.com/ir/cadence/newsArticle.php?ST=REM&id=2688632.

Highlights:

·; DRA Pacific Pty Ltd awarded the Engineering, Procurement and Contract Management (EPCM) Contract for the Yangibana Rare Earths Processing Plant.

·; The scope of works under the DRA Pacific Pty Ltd EPCM agreement has an estimated capital value of circa A$350m.

·; DRA Pacific's parent DRA Global Ltd have extensive experience in designing and building mineral processing facilities worldwide and their personnel have previously delivered rare earth plants in Western Australia.

·; The key component of the contract terms is the comprehensive performance guarantee linked to ore throughput for the entire process flow sheet.

The EPCM contract is the single largest dollar value contract associated with the Yangibana Project. It is also a fundamental requirement of Hastings' debt providers and hence is pivotal to the project financing process. Works directed under the EPCM Contract have an estimated value of approximately A$350M.

The key component of the contract terms is the comprehensive performance guarantee linked to ore throughput for the entire process flow sheet.

The appointment of DRA Pacific as the EPCM contractor for Hastings represents another critical milestone for the Project, reinforcing that Yangibana is execution ready.

Choosing DRA Pacific was the logical choice given the already close working relationship built up over the last 15 months, and the experience in rare earths processing plant design that DRA Pacific bring to the table.

The full release can be found at: https://www.asx.com.au/asxpdf/20191021/pdf/449nzf57qlq659.pdf

Hastings Executive Chairman Charles Lew said: "We are pleased to have DRA involved in the construction of the Yangibana processing plant. Their knowledge and experience in developing successful minerals processing projects makes them the ideal candidate to manage the construction of our project. The award of the EPCM contract moves the Yangibana Rare Earths Project firmly into development phase to commence project execution and progress to production of our mixed rare earth carbonate by 2022."

Cadence CEO Kiran Morzaria commented: "The appointment of DRA Pacific represents a key step for Yangibana. Not only is it key to the project funding going forward, the EPCM contract terms include a comprehensive performance guarantee linked to ore throughput. Today's announcement provides further validation for our investment strategy into the Yangibana joint venture with Hastings."

- Ends -

For further information:

Cadence Minerals plc

+44 (0) 207 440 0647

Andrew Suckling

Kiran Morzaria

WH Ireland Limited (NOMAD & Broker)

+44 (0) 207 220 1666

James Joyce

James Sinclair-Ford

Novum Securities Limited (Joint Broker)

+44 (0) 207 399 9400

Jon Belliss

 

 

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

 

Forward-Looking Statements:

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ''believe'' ''could'' "should" ''envisage'' ''estimate'' ''intend'' ''may'' ''plan'' ''will'' or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding the Company's future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of the Company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. The Company cannot assure investors that actual results will be consistent with such forward-looking statements.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
CNTPGGUUUUPBGUG
Date   Source Headline
5th Jun 20205:44 pmRNSLoan Note Conversion
5th Jun 202011:05 amRNSSecond Price Monitoring Extn
5th Jun 202011:00 amRNSPrice Monitoring Extension
5th Jun 202010:03 amRNSAmended: Macarthur JV Partner Completes Royalty Sa
5th Jun 20207:00 amRNSMacarthur JV Partner Completes Royalty Sale
3rd Jun 20202:06 pmRNSSecond Price Monitoring Extn
3rd Jun 20202:01 pmRNSPrice Monitoring Extension
3rd Jun 20209:31 amRNSYangibana JV Partner Agreement with Schaeffler
2nd Jun 20203:47 pmRNSHolding(s) in Company
28th May 20202:07 pmRNSMacarthur JV Partner - FIRB Approves Royalty Sale
28th May 202010:53 amRNSBacanora Sonora & Lithium Market Update
26th May 20203:47 pmRNSMacarthur Minerals JV Partner - $7m Royalty Sale
6th May 20201:44 pmRNSTotal Voting Rights and Capital
6th May 20207:00 amRNSMacarthur Lake Giles Assay Results Completed
1st May 20205:27 pmRNSPlacing Update
1st May 202011:16 amRNSAmapá Update, Placing and Loan Note Restructuring
30th Apr 20208:57 amRNSEuropean Metals Holdings - Cinovec PMP Granted
29th Apr 20204:02 pmRNSMacarthur Plans Further Exploration at Hillside
23rd Apr 202012:31 pmRNSEMH - CEZ Cinovec Investment Approved
20th Apr 20202:06 pmRNSSecond Price Monitoring Extn
20th Apr 20202:00 pmRNSPrice Monitoring Extension
17th Apr 20202:05 pmRNSSecond Price Monitoring Extn
17th Apr 20202:00 pmRNSPrice Monitoring Extension
17th Apr 202011:05 amRNSSecond Price Monitoring Extn
17th Apr 202011:00 amRNSPrice Monitoring Extension
14th Apr 202010:29 amRNSYangibana - Commonwealth Environmental Approval
14th Apr 20207:00 amRNSCourt Approval to Commence Iron Ore Shipments
27th Mar 202010:39 amRNSUpdated: EMH – CEZ to Invest in Cinovec
27th Mar 202010:13 amRNSEMH – Agreement with CEZ to Invest in Cinovec
25th Mar 20202:10 pmRNSMacarthur Minerals - JV Partner for Nickel Project
25th Mar 20207:00 amRNSMacarthur Minerals EIS Grant for Nickel Prospect
18th Mar 20204:29 pmRNSHolding(s) in Company
13th Mar 20209:36 amRNSMacarthur Minerals Lake Giles Iron Project Update
13th Mar 20207:00 amRNSPurchase of Shares by a Director
12th Mar 202011:11 amRNSUpdate on Amapa Iron Ore Project Investment
4th Mar 202012:17 pmRNSHolding(s) in Company
11th Feb 202010:11 amRNSMacarthur Minerals Encouraged by Pilbara Results
31st Jan 20202:04 pmRNSHolding(s) in Company
16th Jan 20203:35 pmRNSMacarthur Minerals Lake Giles Drilling Update
14th Jan 20205:07 pmRNSHolding(s) in Company
13th Jan 20202:40 pmRNSUpdate - Macarthur Minerals
3rd Jan 20201:23 pmRNSHolding(s) in Company
23rd Dec 20193:22 pmRNSMacarthur Minerals Secures Land at Lake Giles
11th Dec 201910:19 amRNSMacarthur Minerals Intersects High Grade Magnetite
9th Dec 20197:00 amRNSReinstatement of Railway Concessions at Amapá
27th Nov 20198:52 amRNSHastings Tech Metals Yangibana Funding Update
25th Nov 20199:28 amRNSSuccessful Bulk Ore Trial Results at Yangibana
20th Nov 20199:52 amRNSEMH & CEZ - Cinovec Partnership & Investment
11th Nov 201912:10 pmRNSBacanora Sonora Lithium Project Update
5th Nov 201910:10 amRNSMacarthur JV Partner FE Limited Commences Drilling

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.