The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCadence Mineral Regulatory News (KDNC)

Share Price Information for Cadence Mineral (KDNC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.50
Bid: 3.40
Ask: 3.60
Change: 0.00 (0.00%)
Spread: 0.20 (5.882%)
Open: 3.50
High: 3.50
Low: 3.50
Prev. Close: 3.50
KDNC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Contract Awarded for Yangibana Processing Plant

21 Oct 2019 11:04

RNS Number : 5567Q
Cadence Minerals PLC
21 October 2019
 

Cadence Minerals Plc

 

("Cadence Minerals", "Cadence" or "the Company")

 

Hastings Technology Metals (ASX:HAS) - DRA Pacific Awarded EPCM Contract Yangibana Processing Plant.

 

Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to announce Hastings Technology Metals (ASX:HAS) ("Hastings"), Cadence's joint venture partner at the Yangibana Rare Earth Project in the Gascoyne region of Western Australia ("Yangibana Project"), has announced that it has awarded the Engineering, Procurement, Construction and Management (EPCM) contract for its rare earths processing plant and the associated infrastructure for the Yangibana process plant in the Gascoyne Region of Western Australia to DRA Pacific Pty Ltd ("DRA Pacific"), a diversified global engineering, project delivery and operations management. The appointment of DRA Pacific as the EPCM contractor for the Yangibana Project was preceded by a series of value engineering studies and the Front-End-Engineering-Design ("FEED") completed by DRA Pacific during 2018 and 2019. DRA Pacific's EPCM contract will cover all aspects of the design and construction of the processing facility and associated non-process infrastructure capable of producing 15,000 tonnes of Mixed Rare Earths Carbonate (MREC) per year.

Cadence Minerals Yangibana Holding:

Cadence owns 30% of the Yangibana North, Gossan, Hook, Kanes Gossan, Lions Ear and Bald Hill North Rare Earth Deposit, which form part of the Yangibana Rare Earth Deposit. Probable Ore Reserves of some 2.1 million tonnes at 1.66% total rare earth elements are contained within 30% owned joint venture tenements. Further details of these reserves and pre-feasibility study can be found at: http://irservices.netbuilder.com/ir/cadence/newsArticle.php?ST=REM&id=2688632.

Highlights:

·; DRA Pacific Pty Ltd awarded the Engineering, Procurement and Contract Management (EPCM) Contract for the Yangibana Rare Earths Processing Plant.

·; The scope of works under the DRA Pacific Pty Ltd EPCM agreement has an estimated capital value of circa A$350m.

·; DRA Pacific's parent DRA Global Ltd have extensive experience in designing and building mineral processing facilities worldwide and their personnel have previously delivered rare earth plants in Western Australia.

·; The key component of the contract terms is the comprehensive performance guarantee linked to ore throughput for the entire process flow sheet.

The EPCM contract is the single largest dollar value contract associated with the Yangibana Project. It is also a fundamental requirement of Hastings' debt providers and hence is pivotal to the project financing process. Works directed under the EPCM Contract have an estimated value of approximately A$350M.

The key component of the contract terms is the comprehensive performance guarantee linked to ore throughput for the entire process flow sheet.

The appointment of DRA Pacific as the EPCM contractor for Hastings represents another critical milestone for the Project, reinforcing that Yangibana is execution ready.

Choosing DRA Pacific was the logical choice given the already close working relationship built up over the last 15 months, and the experience in rare earths processing plant design that DRA Pacific bring to the table.

The full release can be found at: https://www.asx.com.au/asxpdf/20191021/pdf/449nzf57qlq659.pdf

Hastings Executive Chairman Charles Lew said: "We are pleased to have DRA involved in the construction of the Yangibana processing plant. Their knowledge and experience in developing successful minerals processing projects makes them the ideal candidate to manage the construction of our project. The award of the EPCM contract moves the Yangibana Rare Earths Project firmly into development phase to commence project execution and progress to production of our mixed rare earth carbonate by 2022."

Cadence CEO Kiran Morzaria commented: "The appointment of DRA Pacific represents a key step for Yangibana. Not only is it key to the project funding going forward, the EPCM contract terms include a comprehensive performance guarantee linked to ore throughput. Today's announcement provides further validation for our investment strategy into the Yangibana joint venture with Hastings."

- Ends -

For further information:

Cadence Minerals plc

+44 (0) 207 440 0647

Andrew Suckling

Kiran Morzaria

WH Ireland Limited (NOMAD & Broker)

+44 (0) 207 220 1666

James Joyce

James Sinclair-Ford

Novum Securities Limited (Joint Broker)

+44 (0) 207 399 9400

Jon Belliss

 

 

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

 

Forward-Looking Statements:

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ''believe'' ''could'' "should" ''envisage'' ''estimate'' ''intend'' ''may'' ''plan'' ''will'' or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding the Company's future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of the Company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. The Company cannot assure investors that actual results will be consistent with such forward-looking statements.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
CNTPGGUUUUPBGUG
Date   Source Headline
9th Aug 20219:39 amRNSMacarthur Strikes Additional Rail Haulage Deal
4th Aug 20212:28 pmRNSResult of AGM
3rd Aug 20213:59 pmRNSMacarthur Gold & Copper Asset ASX listing Update
29th Jul 20217:00 amRNSPositive Operational Progress at the Amapa Project
26th Jul 20219:50 amRNSApproval of further Amapa Iron Ore Shipment
21st Jul 202111:33 amRNSMacarthur Advances Lake Giles Feasibility Study
15th Jul 20219:17 amRNSMacarthur Signs DSO Purchase Term Sheet With GWR
9th Jul 20217:00 amRNSNotice of Annual General Meeting
8th Jul 20212:45 pmRNSMacarthur Minerals Closer to DSO Export Pathway
7th Jul 20217:00 amRNSMacarthur Moonshine Geotechnical Drill Programme
30th Jun 202110:37 amRNSMacarthur: Additional Tenure for Lake Giles
30th Jun 20217:00 amRNSResults for the year ended 31 December 2020
15th Jun 20215:09 pmRNSMacarthur & Jin Sung Intl - Strategic Agreement
14th Jun 20213:08 pmRNSMacarthur subsidiary Infinity set for ASX IPO
26th May 20214:27 pmRNSMacarthur Accelerates Lake Giles Mine Planning
19th May 20212:38 pmRNSEuropean Metals - Strong Locked Cycle Test Results
10th May 20217:31 amRNSSecond Iron Ore Shipment & Amapa Project Update
30th Apr 20213:42 pmRNSIssue of Options
23rd Apr 20212:00 pmRNSExercise of Warrants
16th Apr 20219:51 amRNSMacarthur Lake Giles Project Feasibility Update
6th Apr 20214:40 pmRNSSecond Price Monitoring Extn
6th Apr 20214:35 pmRNSPrice Monitoring Extension
1st Apr 20212:05 pmRNSSecond Price Monitoring Extn
1st Apr 20212:00 pmRNSPrice Monitoring Extension
1st Apr 202110:17 amRNSFirst Amapa Iron Ore Shipment Completed & En Route
29th Mar 20217:00 amRNSFirst Iron Ore Shipment From Amapa Since 2015
26th Mar 20214:01 pmRNSMacarthur - Re Lake Giles Groundwater Drilling
23rd Mar 202110:01 amRNSMacarthur Bolsters Feasibility Study Team
16th Mar 20219:44 amRNSMacarthur Lake Giles Feasibility Study Update
15th Mar 202110:12 amRNSForm TR-1 Notification
8th Mar 20211:14 pmRNSMacarthur Spins Out Pilbara Copper-Gold Assets
25th Feb 20218:33 amRNSMacarthur - Exclusive Agreement over Mining Leases
24th Feb 202112:56 pmRNSUpdate on Yangibana and JV Partner Funding
19th Feb 20218:05 amRNSUpdate on the Amapa Iron Ore Project
18th Feb 20217:00 amRNSMacarthur - Lake Giles consultancy appointments
10th Feb 20212:05 pmRNSSecond Price Monitoring Extn
10th Feb 20212:01 pmRNSPrice Monitoring Extension
10th Feb 202111:24 amRNSBacanora starts Sonora Lithium project site works
10th Feb 202111:05 amRNSSecond Price Monitoring Extn
10th Feb 202111:00 amRNSPrice Monitoring Extension
10th Feb 20219:05 amRNSSecond Price Monitoring Extn
10th Feb 20219:00 amRNSPrice Monitoring Extension
10th Feb 20217:00 amRNSUpdate on the Amapa Iron Ore Project
9th Feb 20217:00 amRNSMacarthur signs MOU with Southern Ports Authority
2nd Feb 20211:04 pmRNSEMH Cinovec Project - Drilling Update
27th Jan 20212:34 pmRNSForm TR1
12th Jan 20211:03 pmRNSExercise of Warrants
8th Jan 20217:00 amRNSResult of AGM
30th Dec 20207:00 amRNSForm TR1
23rd Dec 20202:37 pmRNSExercise of Warrants

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.