GreenRoc Accelerates their World Class Project to Production as Early as 2028. Watch the full video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 7.70
Bid: 7.60
Ask: 7.80
Change: 0.00 (0.00%)
Spread: 0.20 (2.632%)
Open: 7.80
High: 8.00
Low: 7.70
Prev. Close: 7.70
JLP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update on Tjate - Replacement

15 Dec 2005 12:36

Jubilee Platinum PLC15 December 2005 The following announcement replaces RNS number 6987V. The thicknesses of theresults from the UG2 reef (table 2) were stated incorrectly. The full amendedpress release appears below: 15 December 2005 JUBILEE PLATINUM PLC ("Jubilee" or "the Company") Full results for third step-out borehole DT4 on Tjate Project Borehole DT5 intersects Merensky Reef Jubilee announces the full results for its third step-out borehole DT4 on theDsjate farm ("Tjate Project") in the Bushveld Complex of South Africa. Theborehole was stepped out a significant 860 metres updip from borehole DT1 and460 metres south along strike from borehole DT2. Infill borehole DT5 intersectedthe Merensky reef on 12th December 2005. SGS Lakefield Research Africa in Johannesburg carried out the analyses of theborehole core samples. This laboratory is SNAS TO169 accredited. Highlights • Step out borehole DT4 - fourth hole in succession - intersects the Merensky reef ("MR") and UG2 Chromitite reef ("UG2") at projected depths • Good grades and thicknesses of reefs intersected • MR shows weighted average grade of 6.42 g/t 4E (platinum, palladium, rhodium and gold) and UG2 7.60 g/t 4E; both values include results from two deflections • MR shows significant nickel and copper contributions: 0.28% nickel and 0.14% copper • These results are confirming a mineable resource downdip of existing and developing operations for both Merensky and UG2 reefs • The results support the potential for a stand-alone Merensky mine • Drilling of the fifth borehole DT5 - infill borehole - intersected the Merensky reef at 770 metres Colin Bird, CEO of Jubilee and Tjate and Tjate Project Manager, said "Theseresults further confirm the good PGM and base metal grades on the Dsjate farm.Our confidence in the Tjate resource valuation is increasing and our intentionnow is to focus on establishing an initial Merensky mineable reserve of greaterthan 3 million ounces, as part of the projected 66 million ounces estimatedoverall resource at Tjate, and commence a feasibility study." The full results for borehole DT4 are shown in tables 1 and 2 below: Table 1 DT4 Merensky reef results: Apparent 4E Pt Pd Rh Au Ni Cu Pt:Pd thickness g/t g/t g/t g/t g/t % % ratio cmMotherhole 80 6.18 3.34 2.14 0.16 0.54 0.24 0.16 1.6Deflection1 78 7.65 4.33 2.55 0.20 0.57 0.32 0.20 1.7Deflection 2 80 6.48 3.10 1.96 0.13 0.39 0.22 0.11 1.6Weighted average 79 6.42 3.58 2.21 0.16 0.47 0.26 0.14 1.6 Table 2 DT4 UG2 reef results: Apparent 4E Pt Pd Rh Au Pt:Pd thickness g/t g/t g/t g/t g/t ratio cmMotherhole 89 7.28 3.03 3.42 0.72 0.11 0.9Deflection1 82 7.24 3.20 3.20 0.75 0.10 1.0Deflection 2 83 8.10 3.00 4.27 0.67 0.16 0.7Weighted average 85 7.60 3.10 3.66 0.72 0.12 0.8 The Dsjate farm is one of three contiguous farms in the Tjate project, whichcomprise 5,143 hectares in total with an inferred resource of 282 million tonnesand 66 million ounces 5PGE (platinum group elements) plus gold of which 22.8million ounces are attributable to Jubilee. Jubilee has a 25% stake in Tjate, with an earn-in right to a further 10%interest by expending ZAR14 million towards a bankable feasibility study. For further information please contact: Colin Bird Cathy Malins / Annabel LeatherJubilee Platinum plc Parkgreen Communications LtdTel: +44 (0)20 7584 2155 Tel +44 (0)20 7493 3713 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
5th Apr 20187:00 amRNSKabwe Mining Licence Reinstated
29th Mar 201812:00 pmRNSFurther Kabwe Project Update
21st Mar 20187:00 amRNSAppointment of Broker
19th Mar 20181:45 pmRNSJubilee Live Interactive Webcast
7th Mar 20187:00 amRNSUNAUDITED INTERIM RESULTS 31 DECEMBER 2017
2nd Mar 201811:45 amRNSStatement regarding Broker
1st Mar 20187:00 amRNSFurther Kabwe Project Update
23rd Feb 20183:35 pmRNSFurther Kabwe Project Update
7th Feb 20185:00 pmRNSFurther Update re Kabwe project
7th Feb 20183:20 pmRNSUpdate on Kabwe project
6th Feb 20187:00 amRNSJubilee progresses Kabwe Project
5th Feb 20188:56 amRNSTR-1: notification of major holdings
1st Feb 201811:00 amRNSJubilee Live Interactive Webcast
30th Jan 20181:45 pmRNSQuarterly Operations Update
30th Jan 20188:00 amRNSTR-1: notification of major holdings
29th Jan 20184:48 pmRNSHolding(s) in Company
15th Jan 20181:00 pmRNSJubilee Acquires Significant Equity Position - BMR
9th Jan 20188:45 amRNSJubilee Secures Institutional Financing
5th Jan 20182:45 pmRNSJubilee Hernic PGM Project
5th Dec 20172:30 pmRNSChange of name to Jubilee Metals Group PLC
4th Dec 20173:10 pmRNSResults of AGM and Change of Name
20th Nov 20177:00 amRNSHernic Operations Update for October 2017
10th Nov 20177:00 amRNSNotice of AGM & Audited results for the year
26th Oct 20177:00 amRNSQuarterly Operations Update
23rd Oct 20177:00 amRNSJoint venture with BMR Group PLC
28th Sep 20177:00 amRNSHernic Update
7th Sep 20171:01 pmRNSJubilee Live Interactive Webcast - replacement
7th Sep 201710:15 amRNSJubilee Live Interactive Webcast
5th Sep 201712:30 pmRNSNew Partnership Agreement, 3rd Party Ore Agreement
31st Jul 201711:52 amRNSPlatinum Projects Quarterly Update - Q2 2017
22nd Jun 20173:00 pmRNSDirector Dealing
15th Jun 20171:30 pmRNSHernic Project Reaches Full Production
19th May 201710:30 amRNSHernic Project Ramping-Up and Live Webcast
9th May 20179:00 amRNSMarket Update
30th Mar 20173:18 pmRNSInterim Results - replacement
30th Mar 201712:15 pmRNSInterim Results
29th Mar 20172:15 pmRNSJubilee commences platinum production
17th Mar 20177:00 amRNSExecution of Platinum Tailings Agreement
14th Mar 20171:15 pmRNSFinal proceeds from Middelburg and DCM update
9th Mar 20177:00 amRNSJubilee Executes Surface Tailings Transaction
6th Mar 20179:45 amRNSDCM Operations update and Exercise of warrants
2nd Mar 20178:30 amRNSTjate Executes Mining Right
21st Feb 20173:15 pmRNSExercise of last warrants at specific issue price
15th Feb 20173:31 pmRNSExercise of Last Warrants at Specific Issue Price
13th Feb 201711:45 amRNSExercise of Warrants
8th Feb 20178:45 amRNSExercise of Warrants
6th Feb 20172:45 pmRNSHernic Project in Production
3rd Feb 20179:30 amRNSExercise of Warrants
30th Jan 20179:00 amRNSHernic Tailings Project update
25th Jan 20172:00 pmRNSExercise of Warrants

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.