Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

Share Price is delayed by 15 minutes
Get Live Data
2.60    -0.05 (-1.89%)
Bid:
2.50
Ask:
2.70
Spread: 0.20 (8.00%)
Market Cap: £83.81m
JLP Live PriceLast checked at - London Stock Exchange

Intraday Jubilee Metals Share Chart

Update from Tjate

2 Feb 2006 07:00

Jubilee Platinum PLC02 February 2006 JUBILEE PLATINUM PLC ("Jubilee" or "the Company") Full results for borehole DT5 on the Tjate Project Jubilee announces the full results for its infill borehole DT5 on the Dsjatefarm ("Tjate Project") in the Bushveld Complex of South Africa. The borehole islocated down dip some 350m south west and north east of boreholes DT4 and DT2respectively, representing another significant stepout. Highlights • The borehole intersected the Merensky horizon and an additional upperintercept. • The Merensky intercept, at a depth of 779.8m showed a weighted averagegrade of 18.95 g/t 4E (platinum, palladium, rhodium and gold) over 47.5centimetres (apparent) reef thickness. • This intercept included one intersection (motherhole) showing aweighted grade of 22.26g/t 4E over 75 centimetres (apparent) reef thickness. • The upper intercept, at a depth of 771.8m showed a weighted average of5.83 g/t 4E over 58 centimetres (apparent) reef thickness, including onedeflection grading 17.56 g/t 4E over 41.5 centimetres (apparent) reef thickness. • The Merensky intercept showed significant weighted average copper andnickel values of 0.92% nickel and 0.27% copper. Colin Bird, CEO of Jubilee and Tjate Project Manager, said: "These drillingresults continue to be very positive and the above reef thicknesses provideabove-average grades for the Bushveld Complex. The nickel and coppercontribution is significant and would constitute about 20% to revenues attoday's prices." The results for borehole DT5 are shown in tables 1 and 2 below: Table 1 DT5 - Merensky Intercept Results Apparent 4E Pt Pd Rh Au Ni Cu Pt:Pd thickness g/t g/t g/t g/t g/t % % ratio (cm)Motherhole 75 22.26 12.58 7.77 0.78 1.13 1.09 0.33 1.6Deflection1 20 6.54 3.97 2.15 0.20 0.22 0.27 0.06 1.8Deflection 2 No sulphide mineralisationWeighted average MH+DF1 47.5 18.95 10.76 6.59 0.66 0.94 0.91 0.27 1.6 Table 2 DT5 - Upper Intercept Results Apparent 4E Pt Pd Rh Au Ni Cu Pt:Pd thickness g/t g/t g/t g/t g/t % % ratio (cm)Motherhole 68 2.24 1.19 0.39 0.06 0.60 0.06 0.05 3.0Deflection1 60 12.2 10.13 1.27 0.54 0.23 0.15 0.12 8.0Deflection 2 46 2.89 2.03 0.56 0.14 0.17 0.09 0.06 3.6Weighted average 58 5.83 4.49 0.74 0.24 0.36 0.10 0.08 6.0 The Dsjate farm is one of three contiguous farms in the Tjate project, whichcomprises a total 5,143 hectares with an inferred resource of 282 milliontonnes containing 66 million ounces 5 PGE (platinum group elements: platinum,palladium, rhodium, iridium and ruthenium) and gold, of which 22.8 millionounces are attributable to Jubilee. Jubilee has a 25% stake in Tjate, with an earn-in right to a further 10%interest by expending ZAR14 million towards a bankable feasibility study. SGS Lakefield Research Africa in Johannesburg carried out the analyses of theborehole core samples. This laboratory is SNAS TO169 accredited. For further information please contact: Colin Bird Justine Howarth/Annabel LeatherJubilee Platinum plc Parkgreen Communications LtdTel: +44 (0)20 7584 2155 Tel +44 (0)20 7493 3713 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
25th Mar 20087:01 amRNSShare Acquisition in NewPlats
13th Mar 20087:00 amRNSInterim Results
5th Mar 20087:00 amRNSDrilling Update - Madagascar
21st Feb 20087:00 amRNSAmbodilafa Drilling Update
16th Jan 20087:00 amRNSDrilling Update at Tjate
13th Dec 20077:00 amRNSMadagascar Drilling Update
27th Nov 20077:00 amRNSResult of AGM
22nd Nov 20077:01 amRNSMadagascar Drilling Update
19th Nov 20074:26 pmRNSCompletion of Placing
14th Nov 20079:00 amRNSMadagascar Drilling Update
14th Nov 20077:01 amRNSHolding(s) in Company
7th Nov 20077:01 amRNSPlacing of New Shares
6th Nov 20079:22 amRNSNotice of AGM & Final Results
11th Oct 20077:30 amRNSDrilling Update at Tjate
3rd Oct 20078:00 amRNSMadagascar Drilling Update
1st Oct 20072:42 pmRNSIssue of Shares-Replacement
28th Sep 20073:00 pmRNSIssue of Shares
20th Sep 20077:01 amRNSTjate - Optimisation Review
17th Sep 20077:01 amRNSFinal Results
17th Aug 20076:24 pmRNSAIM Rule 26 Compliance
6th Aug 20077:00 amRNSFunding for Ambodilafa
31st Jul 20079:00 amRNSDirector/PDMR Shareholding
19th Jul 20077:00 amRNSIncrease in Tjate Holding
22nd Jun 20077:01 amRNSIssue of Shares
13th Jun 20074:44 pmRNSIssue of Shares
7th Jun 20077:01 amRNSExercise of Options
6th Jun 20079:59 amRNSCompletion of Scoping Study
4th May 200712:00 pmRNSAdditional Listing
29th Mar 200712:07 pmRNSAdditional Listing
26th Mar 20077:01 amRNSInterim Results
26th Feb 20078:00 amRNSNan Tin Agreement
23rd Feb 20078:00 amRNSHolding in Company
22nd Feb 20077:01 amRNSUpdate from Ambodilafa
5th Feb 20077:01 amRNSLavatrafo Update
22nd Dec 200612:24 pmRNSTotal Voting Rights
13th Dec 200612:01 pmRNSAgreement with Mitsubishi
12th Dec 20068:00 amRNSIncrease in Tjate Holding
6th Dec 20068:00 amRNSSecondary Listing on JSE
4th Dec 20061:38 pmRNSResult of AGM
1st Dec 20066:48 pmRNSHolding in Company
21st Nov 20069:20 amRNSDirector/PDMR Shareholding
20th Nov 20067:02 amRNSComment re. media article
3rd Nov 20067:01 amRNSFinal Results
24th Oct 20064:15 pmRNSSubscription of Shares
16th Oct 20068:56 amRNSJV with TransAsia Minerals
20th Sep 200612:35 pmRNSLavatrafo Project Update
15th Sep 200611:19 amRNSAmbodilafa Update
16th Aug 20065:05 pmRNSHolding(s) in Company
30th Jun 20069:29 amRNSGrant of Share Options
23rd May 20067:02 amRNSTjate Drill Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.