Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

Share Price is delayed by 15 minutes
Get Live Data
2.80    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.20 (7.407%)
Market Cap: £90.25m
JLP Live PriceLast checked at - London Stock Exchange

Intraday Jubilee Metals Share Chart

Drilling Update at Tjate

11 Oct 2007 07:30

Jubilee Platinum PLC11 October 2007 11 October 2007 AIM: JLPJSE: JBL JUBILEE PLATINUM PLC ("Jubilee" or "the Company") Exceptional PGM Values (Plus 10g/t) and Reef Thickness Intersected at Tjate Highlights • Borehole DT9 results (motherhole) showed 10.98 g/t 4E (platinum,palladium, rhodium and gold), 0.33% nickel (Ni) and 0.23% copper (Cu) overapparent 2.21 metres thickness and in the footwall (FW) 9.12 g/t 4E, 0.28% Niand 0.16% Cu over 2.15 metres • First deflection showed 6.75g/t 4E, 0.30% Ni and 0.15% Cu over 2.48metres in MR and 11.05g/t 4E, 0.38% Ni and 15% Cu over 1.80 metres in thefootwall • Total MR only (with 3 deflections) showed weighted average 6.30 g/t4E, 0.24% Ni and 0.14% Cu over 2.01 metres • Total MR plus footwall showed weighted average 8.11g/t 4E, 0.29% Niand 0.17% Cu over 2.91 metres • Merensky reef intersected at a depth of 822 metres and UG2 reef at1211 metres • UG2 (including 2 deflections) results showed weighted average 5.96 g/t4E over 0.94 metres Jubilee Platinum announces exceptional results for its borehole DT9 on theDsjate farm area of the Tjate Project in the Bushveld Complex of South Africa.This borehole was stepped out some 500 meters along strike to the north of themost northerly line of previously drilled boreholes. This development extendssignificantly the area of mineralisation for resource estimation. Detailed results for this borehole are shown in Table 1 appended. Colin Bird, CEO of Jubilee and Tjate Project Manager, said: "These areexceptional Merensky reef results both in terms of grade and reef thickness. TheTjate deposit is demonstrating consistency, reliability and high grade, whichgives us the confidence to embark on our bankable feasibility study." Table 1 DT9 results for Merensky Reef (MR), Footwall (FW) and UG2 reef intersections Apparent 4E Pt Pd Rh Au Ni Cu Pt:Pd thickness g/t g/t g/t g/t g/t % % ratio (m)MerenskyMotherhole MR 2.21 10.98 6.11 3.67 0.27 0.92 0.37 0.13 1.7Motherhole FW 2.15 9.12 5.04 3.08 0.20 0.79 0.28 0.16 1.8Total motherhole 4.36 10.06 5.59 3.38 0.24 0.86 0.33 0.20 1.7 Deflection 1 MR 2.48 6.75 3.50 2.51 0.22 0.52 0.30 0.15 1.4Deflection 1 FW 1.80 11.05 5.70 3.99 0.20 1.17 0,38 0.20 1.4Total deflection 1 4.28 8.56 4.43 3.13 0.21 0.79 0.34 0.17 1.4 Deflection 2 MR 1.00 4.09 2.57 1.18 0.10 0.25 0.17 0.09 2.2Deflection 3 MR 2.00 4.89 2.90 1.40 0.12 0.47 0.13 0.19 2.1Wtd. ave. MR 2.01 6.30 3.49 2.12 0.16 0.52 0.24 0.14 1.7Wtd. ave. MR+FW 2.91 8.11 4.44 2.76 0.17 0.72 0.29 0.17 1.6 UG2Motherhole 1.05 5.30 2.38 2,31 0.53 0.08 na na 1.0Deflection 1 0.80 6.43 2.94 2.75 0.63 0.11 na na 1.1Deflection 2 0.96 6.29 2.73 2.83 0.62 0.10 na na 1.0Wtd. ave. 0.94 5.96 2.66 2.61 0.59 010 na na 1.0 na not applicable Note to Editors The Tjate project comprises three contiguous farms, totalling 5,143 hectares inthe eastern Bushveld: namely Dsjate, Fernkloof and Quartz Hill. The farms aredowndip of Impala Platinum's operating Marula platinum mine and of AngloPlatinum's developing Twickenham platinum mine. Jubilee has recently completed apostive scoping study based on the first phase drilling of seven boreholes onthe Dsjate farm. All the holes, as previously reported, intersected at targeteddepths the Merensky reef and, where drilled deeper, the UG2 reef. These tworeefs are the two main PGM-bearing horizons in the Bushveld. SGS Lakefield Research Africa in Johannesburg carried out the analyses of theborehole core samples. This laboratory is SNAS TO169 accredited. For further information please contact: Colin Bird Louise Goodeve / Justine HowarthJubilee Platinum plc Parkgreen Communications LtdTel: +44 (0) 20 7584 2155 Tel +44 (0) 20 7851 7480 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
1st Mar 20067:01 amRNSExercise of Options
24th Feb 20067:01 amRNSInterim Results
21st Feb 200612:28 pmRNSProspective New Project
13th Feb 20061:08 pmRNSHolding(s) in Company
7th Feb 20065:20 pmRNSHolding(s) in Company
3rd Feb 200611:31 amRNSHolding(s) in Company
2nd Feb 20067:00 amRNSUpdate from Tjate
31st Jan 200611:48 amRNSHolding(s) in Company
27th Jan 20064:06 pmRNSIssue of Loan Note - Replace
27th Jan 20063:22 pmRNSIssue of Loan Note
10th Jan 20067:00 amRNSDirectorate Change
4th Jan 20067:00 amRNSDrill Update from Madagascar
19th Dec 20057:00 amRNSHolding(s) in Company
15th Dec 200512:36 pmRNSUpdate on Tjate - Replacement
15th Dec 20057:01 amRNSUpdate on Tjate
8th Dec 20057:01 amRNSMadagascar Update
5th Dec 20052:58 pmRNSNAMF - Conversion of Holding
25th Nov 200512:34 pmRNSAGM Statement
1st Nov 200510:17 amRNSAgreement with BHP Billiton
28th Oct 20057:00 amRNSFinal Results
6th Oct 20057:00 amRNSUpdate from Madagascar
29th Sep 200510:06 amRNSTjate Update - Replacement
29th Sep 20059:05 amRNSTjate Update
5th Sep 20057:01 amRNSMajor Discovery in Madagascar
19th Jul 200510:40 amRNSDrilling update from Tjate
28th Jun 200512:12 pmRNSHolding(s) in Company
21st Jun 200510:23 amRNSUpdate on Madagascar
19th May 20057:00 amRNSUpdate on drilling at Tjate
27th Apr 20057:00 amRNSDrill Results from Tjate
12th Apr 20052:48 pmRNSHolding(s) in Company
5th Apr 20057:00 amRNSPlacing Announcement
21st Mar 20057:01 amRNSInterim Results
10th Mar 20052:04 pmRNSDrilling Report
25th Feb 20057:00 amRNSExercise of Options
28th Jan 20057:00 amRNSMadagascar Update
6th Jan 20059:37 amRNSExploration Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.