GreenRoc Accelerates their World Class Project to Production as Early as 2028. Watch the full video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 7.70
Bid: 7.60
Ask: 7.80
Change: 0.00 (0.00%)
Spread: 0.20 (2.632%)
Open: 7.80
High: 8.00
Low: 7.70
Prev. Close: 7.70
JLP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Update at Tjate

11 Oct 2007 07:30

Jubilee Platinum PLC11 October 2007 11 October 2007 AIM: JLPJSE: JBL JUBILEE PLATINUM PLC ("Jubilee" or "the Company") Exceptional PGM Values (Plus 10g/t) and Reef Thickness Intersected at Tjate Highlights • Borehole DT9 results (motherhole) showed 10.98 g/t 4E (platinum,palladium, rhodium and gold), 0.33% nickel (Ni) and 0.23% copper (Cu) overapparent 2.21 metres thickness and in the footwall (FW) 9.12 g/t 4E, 0.28% Niand 0.16% Cu over 2.15 metres • First deflection showed 6.75g/t 4E, 0.30% Ni and 0.15% Cu over 2.48metres in MR and 11.05g/t 4E, 0.38% Ni and 15% Cu over 1.80 metres in thefootwall • Total MR only (with 3 deflections) showed weighted average 6.30 g/t4E, 0.24% Ni and 0.14% Cu over 2.01 metres • Total MR plus footwall showed weighted average 8.11g/t 4E, 0.29% Niand 0.17% Cu over 2.91 metres • Merensky reef intersected at a depth of 822 metres and UG2 reef at1211 metres • UG2 (including 2 deflections) results showed weighted average 5.96 g/t4E over 0.94 metres Jubilee Platinum announces exceptional results for its borehole DT9 on theDsjate farm area of the Tjate Project in the Bushveld Complex of South Africa.This borehole was stepped out some 500 meters along strike to the north of themost northerly line of previously drilled boreholes. This development extendssignificantly the area of mineralisation for resource estimation. Detailed results for this borehole are shown in Table 1 appended. Colin Bird, CEO of Jubilee and Tjate Project Manager, said: "These areexceptional Merensky reef results both in terms of grade and reef thickness. TheTjate deposit is demonstrating consistency, reliability and high grade, whichgives us the confidence to embark on our bankable feasibility study." Table 1 DT9 results for Merensky Reef (MR), Footwall (FW) and UG2 reef intersections Apparent 4E Pt Pd Rh Au Ni Cu Pt:Pd thickness g/t g/t g/t g/t g/t % % ratio (m)MerenskyMotherhole MR 2.21 10.98 6.11 3.67 0.27 0.92 0.37 0.13 1.7Motherhole FW 2.15 9.12 5.04 3.08 0.20 0.79 0.28 0.16 1.8Total motherhole 4.36 10.06 5.59 3.38 0.24 0.86 0.33 0.20 1.7 Deflection 1 MR 2.48 6.75 3.50 2.51 0.22 0.52 0.30 0.15 1.4Deflection 1 FW 1.80 11.05 5.70 3.99 0.20 1.17 0,38 0.20 1.4Total deflection 1 4.28 8.56 4.43 3.13 0.21 0.79 0.34 0.17 1.4 Deflection 2 MR 1.00 4.09 2.57 1.18 0.10 0.25 0.17 0.09 2.2Deflection 3 MR 2.00 4.89 2.90 1.40 0.12 0.47 0.13 0.19 2.1Wtd. ave. MR 2.01 6.30 3.49 2.12 0.16 0.52 0.24 0.14 1.7Wtd. ave. MR+FW 2.91 8.11 4.44 2.76 0.17 0.72 0.29 0.17 1.6 UG2Motherhole 1.05 5.30 2.38 2,31 0.53 0.08 na na 1.0Deflection 1 0.80 6.43 2.94 2.75 0.63 0.11 na na 1.1Deflection 2 0.96 6.29 2.73 2.83 0.62 0.10 na na 1.0Wtd. ave. 0.94 5.96 2.66 2.61 0.59 010 na na 1.0 na not applicable Note to Editors The Tjate project comprises three contiguous farms, totalling 5,143 hectares inthe eastern Bushveld: namely Dsjate, Fernkloof and Quartz Hill. The farms aredowndip of Impala Platinum's operating Marula platinum mine and of AngloPlatinum's developing Twickenham platinum mine. Jubilee has recently completed apostive scoping study based on the first phase drilling of seven boreholes onthe Dsjate farm. All the holes, as previously reported, intersected at targeteddepths the Merensky reef and, where drilled deeper, the UG2 reef. These tworeefs are the two main PGM-bearing horizons in the Bushveld. SGS Lakefield Research Africa in Johannesburg carried out the analyses of theborehole core samples. This laboratory is SNAS TO169 accredited. For further information please contact: Colin Bird Louise Goodeve / Justine HowarthJubilee Platinum plc Parkgreen Communications LtdTel: +44 (0) 20 7584 2155 Tel +44 (0) 20 7851 7480 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
5th Apr 20187:00 amRNSKabwe Mining Licence Reinstated
29th Mar 201812:00 pmRNSFurther Kabwe Project Update
21st Mar 20187:00 amRNSAppointment of Broker
19th Mar 20181:45 pmRNSJubilee Live Interactive Webcast
7th Mar 20187:00 amRNSUNAUDITED INTERIM RESULTS 31 DECEMBER 2017
2nd Mar 201811:45 amRNSStatement regarding Broker
1st Mar 20187:00 amRNSFurther Kabwe Project Update
23rd Feb 20183:35 pmRNSFurther Kabwe Project Update
7th Feb 20185:00 pmRNSFurther Update re Kabwe project
7th Feb 20183:20 pmRNSUpdate on Kabwe project
6th Feb 20187:00 amRNSJubilee progresses Kabwe Project
5th Feb 20188:56 amRNSTR-1: notification of major holdings
1st Feb 201811:00 amRNSJubilee Live Interactive Webcast
30th Jan 20181:45 pmRNSQuarterly Operations Update
30th Jan 20188:00 amRNSTR-1: notification of major holdings
29th Jan 20184:48 pmRNSHolding(s) in Company
15th Jan 20181:00 pmRNSJubilee Acquires Significant Equity Position - BMR
9th Jan 20188:45 amRNSJubilee Secures Institutional Financing
5th Jan 20182:45 pmRNSJubilee Hernic PGM Project
5th Dec 20172:30 pmRNSChange of name to Jubilee Metals Group PLC
4th Dec 20173:10 pmRNSResults of AGM and Change of Name
20th Nov 20177:00 amRNSHernic Operations Update for October 2017
10th Nov 20177:00 amRNSNotice of AGM & Audited results for the year
26th Oct 20177:00 amRNSQuarterly Operations Update
23rd Oct 20177:00 amRNSJoint venture with BMR Group PLC
28th Sep 20177:00 amRNSHernic Update
7th Sep 20171:01 pmRNSJubilee Live Interactive Webcast - replacement
7th Sep 201710:15 amRNSJubilee Live Interactive Webcast
5th Sep 201712:30 pmRNSNew Partnership Agreement, 3rd Party Ore Agreement
31st Jul 201711:52 amRNSPlatinum Projects Quarterly Update - Q2 2017
22nd Jun 20173:00 pmRNSDirector Dealing
15th Jun 20171:30 pmRNSHernic Project Reaches Full Production
19th May 201710:30 amRNSHernic Project Ramping-Up and Live Webcast
9th May 20179:00 amRNSMarket Update
30th Mar 20173:18 pmRNSInterim Results - replacement
30th Mar 201712:15 pmRNSInterim Results
29th Mar 20172:15 pmRNSJubilee commences platinum production
17th Mar 20177:00 amRNSExecution of Platinum Tailings Agreement
14th Mar 20171:15 pmRNSFinal proceeds from Middelburg and DCM update
9th Mar 20177:00 amRNSJubilee Executes Surface Tailings Transaction
6th Mar 20179:45 amRNSDCM Operations update and Exercise of warrants
2nd Mar 20178:30 amRNSTjate Executes Mining Right
21st Feb 20173:15 pmRNSExercise of last warrants at specific issue price
15th Feb 20173:31 pmRNSExercise of Last Warrants at Specific Issue Price
13th Feb 201711:45 amRNSExercise of Warrants
8th Feb 20178:45 amRNSExercise of Warrants
6th Feb 20172:45 pmRNSHernic Project in Production
3rd Feb 20179:30 amRNSExercise of Warrants
30th Jan 20179:00 amRNSHernic Tailings Project update
25th Jan 20172:00 pmRNSExercise of Warrants

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.